Further High Grade HREE & Nb Intercepts at Machinga
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
26 October 2023
Further High Grade HREE & Niobium Results from Final
RC holes at Machinga
HIGHLIGHTS
Further high-grade HREE and Nb results returned from the remaining 13 holes of maiden
35-hole reverse circulation (“RC”) program at Machinga Main Northern Zone
Continued widespread HREE and Nb intersections with assays including:
11m @ 0.74% TREO, 0.29% Nb2O5 from surface (3.8% DyTb/TREO) incl. 2m @ 1.36%
TREO, 0.49% Nb2O5 from 6m (4% Dy/Tb/TREO) (MR024)
5m @ 0.56% TREO, 0.20% Nb2O5 from 103m (3.7% DyTb/TREO) (MR027)
12m @ 0.39% TREO, 0.10% Nb2O5 from 6m (3.5% DyTb/TREO) (MR034B)
6m @ 0.55% TREO, 0.18% Nb2O5 from 43m (4.1% DyTb/TREO) (MR026)
4m @ 0.58% TREO, 0.14% Nb2O5 from 16m (4.3% DyTb/TREO) (MR034)
Results follow up on recent high-grade RC intercepts incl. 7m @ 1.42% TREO with 0.49%
Nb2O5 from 65m (MR011) and 13m @ 0.65% TREO with 0.25% Nb2O5 from surface (MR019)
Results returned an average of 29% HREO:TREO and 3.6% DyTb:TREO at a cutoff grade
of >0.25% TREO
First batch of assays from diamond drilling (“DD”) at Machinga Main North Zone (8 holes for
900m) expected to be received next month
Heavy rare earths and niobium explorer DY6 Metals Ltd (ASX: DY6) (“DY6”, the “Company”) is pleased
to announce the receipt of the third and final batch of assays from the RC drilling program completed at
the Machinga Main Northern Zone, part of the Company’s flagship Machinga project in southern Malawi.
The results are from 1m and 3m composite intervals from the third batch of 13 holes (1161m) drilled as
part of DY6’s maiden 35-hole, 3,643m RC drill program at Machinga Main Northern Zone.
The two prior batches delivered high-grade RC intercepts including 7m @ 1.42% TREO with 0.49%
Nb2O5 from 65m (MR011) and 13m @ 0.65% TREO with 0.25% Nb2O5 from surface (MR019).
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
A series of significant intercepts based on a 0.25% total rare earth oxide + yttrium (TREO) cut-off grade
was returned in the latest batch of assays from the Machinga Main Northern Zone including:
11m @ 0.74% TREO, 0.29% Nb2O5 from surface (3.8% DyTb/TREO) incl. 2m @ 1.36% TREO,
0.49% Nb2O5 from 6m (4% Dy/Tb/TREO) (MR024)
5m @ 0.56% TREO, 0.20% Nb2O5 from 103m (3.7% DyTb/TREO) (MR027)
12m @ 0.39% TREO, 0.10% Nb2O5 from 6m (3.5% DyTb/TREO) (MR034B)
6m @ 0.55% TREO, 0.18% Nb2O5 from 43m (4.1% DyTb/TREO) (MR026)
4m @ 0.58% TREO, 0.14% Nb2O5 from 16m (4.3% DyTb/TREO) (MR034)
The mineralisation at the Machinga alkaline complex contains a higher proportion of valuable
dysprosium-terbium (DyTb) with results indicating an average 3.6% DyTb:TREO in samples
greater than 0.25% TREO.
A strongly mineralised hydrothermal breccia system striking NW-SE and dipping shallowly ~35° to the NE
has been confirmed by the recent drilling. Pleasingly, very high-grade zones have been intersected, as
well as the suggestion of the mineralised zones thickening at depth. Significant drill intercepts received
from the third batch of assays are included in Table 2.
Samples will be selected for petrography from both the core and RC drill material. The Company has
engaged a consulting metallurgist to review the lithology, and selected RC sample pulps will be assayed
for major and trace elements followed by x-ray diffraction (“XRD”) for mineral characterisation. Once all
the DD assays are completed, QEMSCAN will be used on selected core samples to determine minerology
and assist with development of a metallurgical program.
Results for the first batch of DD assays (eight diamond holes drilled for 900m) are expected next month.
dy6metals.com | ASX:DY6
2
Figure 1: Machinga Project location in Southern Malawi (U radiometric)
The host rocks to the mineralisation at Machinga are a complex mix of syenitic intrusives relating to the
nearby Malosa pluton that have been emplaced in the basement metamorphic gneisses and migmatites.
The mineralisation appears to be hosted within hydrothermal breccias dipping at approximately 35o to the
NE. It is likely there are several parallel structures stacking within the intrusion itself, which have the
potential to increase the volume of mineralisation.
The foliation of the host complex appears to have a steep southwesterly dip suggesting the structures hosting
the breccias are at right angles to the foliation. How and when the emplacement of the breccias and
mineralisation occurred will require additional study.
dy6metals.com | ASX:DY6
3
Figure 2: Drill collar locations at Machinga North prospect – third batch of 13 RC hole collars
The mineralised zones (as shown in Figures 3, 4 & 5 cross-sections below) demonstrate excellent
continuity with radiometrics predicting the mineralised higher-grade zones with accuracy during drilling.
As more information becomes available it is becoming apparent that post mineralisation faulting has
occurred, as shown below in Figure 3, where possible faulting between MR007 and MR024 creates the
changes in dip and breaks in the mineralised zones at depth in MR008, MR024 and MR007.
dy6metals.com | ASX:DY6
4
Figure 3: RC drill section, DY6 holes MR006, 007, 024 & 008
Figure 3: Drill Section DY6 Metals holes MR006, 007, 008 and 024.
Figure 4 (below) also shows the probability of faulting with the discontinuity of mineralised zones between
holes, especially since hole MR034 was terminated early due to excessive water inflows and broken
ground and the initial inference as to why no significant mineralisation was intersected in holes MR025
and MR031.
The mineralisation in holes MR032-035 is a continuation of the mineralisation intersected in historic drilling
by Globe Mining and Metals (ASX:GBE) to the west of the main highway (M3). Results in hole MR020
previously reported (DY6 ASX Announcement 10 October 2023) are interpreted to be the southward
continuation of this zone, indicating a strike length in excess of 650m for the mineralised system.
This system is open to both the northwest and southeast of the Machinga prospect.
dy6metals.com | ASX:DY6
5
Figure 4: RC drill section, DY6 holes MR032, 033, 034, 034B & 035
These intersections are the continuation of the “footwall” zone west of highway M3.
Figure 4: Drill Section DY6 Metals holes MR032, 033, 034, 034B and 035.
Figure 5: RC drill section, showing mineralisation downdip of structural/stratigraphic diamond holes MDD001
& MDD002 in DY6 Metals holes MR026, 027, 029 and 030.
dy6metals.com | ASX:DY6
6
RC holes MR026 & MR027 tested the continuity of mineralised zones from the south and to ensure there
were mineralised zones on section and remaining open at depth. Shallow RC holes MR029 and MR030
were to test for the presence of mineralised zones to the east where historical high grade surface rock
chip samples from this area were reported.
The diamond drill holes MDD003, MDD005 & MDD006 were planned as geological holes based on the
premise that mineralisation was hosted in pegmatitic units within the host sequence and assumed to be
sub-parallel to the foliation of the metamorphic sequence. The metamorphic sequence was interpreted to
have a shallow foliation dip to the northeast.
This assumption appears to have been incorrect and the holes then became important in developing an
understanding of the structural controls of the host hydrothermal breccias.
Most REE breccias occurrences are typically pipelike structures, whereas Machinga shows a strong
planar structurally controlled character.
Samples are being selected for petrology and mineralogical studies; these will show if the breccia zones
are a related variant of fenite dyke systems derived from an unknown carbonatite-type intrusion or related
to the adjoining Malosa Syenite pluton which is part of the regional Chilwa alkaline province of Southern
Malawi.
Geophysical consultants are undertaking a full reprocessing and reinterpretation of regional data obtained
form the Government of Malawi covering the entire southern half of Malawi.
Salambidwe
Geological mapping, geochemical sampling and the ground radiometric survey commenced this month
at the Salambidwe Project, 200km from Machinga, with the purpose of identification and delineation of a
geochemical anomaly to be tested in future drilling. An airborne electromagnetic survey is planned to be
conducted over Salambidwe in November. Community engagement will take place prior to
commencement of the survey.
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Lloyd Kaiser
Mr John Kay
Mr Luke Forrestal
CEO
Director & Company Secretary
Investor Relations
lloyd.kaiser@dy6metals.com
john.kay@dy6metals.com
+61 411 479 144
dy6metals.com | ASX:DY6
7
Abbreviations
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7,
Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO% = HREO/TREO * 100
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
Competent Persons Statement
The Information in this announcement that relates to exploration results, mineral resources or ore reserves
is based on information compiled by Mr Allan Younger, who is a Member of the Australasian Institute of
Mining and Metallurgy. Mr Younger is a consultant of the Company. Mr Younger has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to the activity
that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the `Australian
Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr
Younger consents to the inclusion of this information in the form and context in which it appears in this
announcement. Mr Younger holds shares in the Company.
The exploration results contained in this announcement were first reported by the Company in its
prospectus dated 3 April 2023 and announced to ASX on 27 June 2023. The results were reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves”. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the Prospectus.
Technical References
Simandl, G.J. and Paradis, S., 2018: Carbonatites: related ore deposits, resources, footprint, and
exploration methods, Applied Earth Science, 127:4, 123-152.
Kaonga, H., Echigo, T. and Watanabe, Y., 2023: HFSE and REE mineralization at Machinga prospect in
the Chilwe alkaline province, southern Malawi. Journal of African Earth Sciences, Vol 198.
dy6metals.com | ASX:DY6
8
Table 1: Drill Collar Locations
Hole Id
MR001
MR002
MR003
MR004
MR005
MR006
MR007
MR008
MR009
MR010
MR011
MR012
MR013
MR014
MR015
MR016
MR017
MR018
MR019
MR020
MR021
MR022
MR023
MR024
MR025
MR026
MR027
MR028
MR029
MR030
MR031
MR032
MR033
MR034
MR034B
MR035
Easting
750120.3
750128.0
750173.6
750179.6
750151.7
749997.2
750031.5
750083.3
750033.9
750061.4
750116.8
750041.4
750182.5
750144.6
750044.3
750096.3
749918.6
749982.0
750088.5
750177.5
750007.7
749939.5
749905.8
750056.1
749834.1
750051.6
750087.2
750054.5
750121.2
750149.3
749893.3
749656.5
749696.0
749723.1
749714.6
749666.2
Northing
8320756.9
8320862.7
8320819.7
8321045.6
8321030.3
8320760.5
8320791.8
8320853.2
8320909.0
8320940.6
8320995.6
8320854.4
8320702.3
8320683.0
8320684.8
8320612.6
8320827.1
8320880.1
8320786.7
8320462.6
8320938.0
8321059.3
8321021.2
8320825.6
8321078.0
8321014.4
8321088.3
8321128.9
8321116.8
8321144.2
8321136.8
8320862.1
8320941.8
8320971.5
8320962.4
8320903.0
Elevation
761.7
751.4
756.1
739.1
739.8
764.5
759.8
751.8
754.0
750.8
744.3
755.2
764.6
768.8
768.1
771.6
764.4
760.9
759.1
765.0
754.2
743.9
751.1
756.2
742.0
745.6
743.3
748.1
745.5
746.6
745.8
764.4
752.9
750.4
751.0
757.1
Azimuth
214.3
217.4
222.6
228.1
221.5
228.0
228.2
230.1
225.7
225.7
223.9
224.3
223.9
226.7
227.7
225.7
215.3
227.4
217.7
233.6
228.6
221.6
223.3
224.4
226.2
221.6
225.6
226.3
225.3
230.7
231.2
222.4
202.7
227.5
224.8
227.0
Dip
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
-60.0
Total
Depth
120
120
120
120
120
120
120
120
120
120
120
80
120
120
120
120
82.27
120
80
120
80
120
112
120
40
104
120
80
80
80
94
80
79
25
67
80
dy6metals.com | ASX:DY6
9
Table 2: Significant Intersections, Holes MR023-35 (based on 2500 ppm TREO cutoff, minimum 3m width and maximum 2m internal dilution)
Hole ID
From
To
Length
TREO
MREO
HREO/TREO
La2O3
CeO2
Pr6O11
Nd2O3
Tb4O7
Dy2O3
Lu2O3
Y2O3
Nd2O3+Pr6O11
HREO
Nb2O5
Ta2O5
MR023
0
3
3
4196
563
31.38%
444
1896
102
303
17
142
14
878
405
1317
2888
113
including
5
6
8
7
3
1
3651
10104
663
1821
32.40%
32.57%
602
1664
1182
3275
123
339
391
1069
18
49
131
364
14
38
786
2182
514
1407
1183
3291
1909
5429
104
296
Including
0
6
11
8
11
2
7419
13616
1367
2518
27.55%
29.03%
1109
2095
2818
4911
256
467
828
1506
37
71
246
474
20
42
1355
2591
1084
1973
2044
3952
2917
4853
149
260
MR026
43
49
6
5511
1019
32.50%
904
1752
181
611
28
200
18
1199
791
1791
1807
95
MR026
99
102
3
3539
618
35.30%
569
1079
110
372
16
119
17
836
483
1249
1760
89
MR027
81
87
6
3934
777
28.46%
653
1327
141
487
19
129
9
767
629
1120
1405
57
MR027
98
101
3
3327
653
28.59%
552
1125
119
401
18
115
7
638
520
951
1021
54
MR028
103
108
5
5647
1096
27.80%
960
1938
204
681
29
182
12
1070
885
1570
1998
97
MR032
0
3
3
3672
613
29.95%
518
1409
119
373
16
106
12
752
491
1100
3706
170
MR033
0
4
4
4784
722
32.59%
623
1867
137
417
20
148
17
1071
554
1559
3637
195
MR033
34
37
3
2822
520
27.68%
492
986
105
328
11
75
9
537
433
781
1585
91
MR034
0
3
3
3445
635
30.46%
530
1194
124
393
15
103
12
714
517
1049
1666
94
MR034
16
20
4
5764
1119
25.99%
1016
2037
216
708
26
169
13
1022
924
1498
1453
85
MR034B
6
18
12
3867
742
32.11%
616
1225
133
444
22
143
9
874
577
1242
1082
59
MR035
0
3
3
3905
696
37.02%
531
1216
125
403
20
149
16
992
527
1446
3312
150
MR035
26
30
4
3648
700
25.62%
647
1303
137
449
15
99
9
649
586
934
2191
97
MR023
MR024
dy6metals.com | ASX:DY6
10
Table 3: Assay Results for Samples with Total Rare Earth Oxide >2500 ppm
Hole Id
MR023
MR023
MR023
MR023
MR023
MR023
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR024
MR026
MR026
MR026
MR026
MR026
MR026
MR026
MR026
MR026
MR027
MR027
MR027
MR027
MR027
MR027
From
0
1
6
31
68
98
0
2
3
4
5
6
7
8
9
10
30
42
68
43
44
45
46
48
59
94
100
101
81
82
84
86
90
98
To
1
2
7
32
69
99
1
3
4
5
6
7
8
9
10
11
31
43
69
44
45
46
47
49
60
95
101
102
82
83
85
87
91
99
Length
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sample
MD03104
MD03105
MD03110
MD03138
MD03184
MD03217
MD03245
MD03247
MD03248
MD03249
MD03250
MD03251
MD03252
MD03253
MD03254
MD03255
MD03278
MD03293
MD03325
MD03576
MD03577
MD03578
MD03579
MD03584
MD03595
MD03636
MD03645
MD03646
MD03764
MD03765
MD03767
MD03769
MD03773
MD03784
Ce
ppm
3259.1
1024.8
2666.2
699.6
973.9
1020.4
1878.8
2622.1
2275.8
1411.1
2360.7
3311.2
4685.0
1836.7
1517.7
2678.2
1280.7
937.6
1325.4
2067.8
2794.7
1000.8
1399.9
876.8
749.4
774.8
927.6
1653.2
744.8
2719.5
1676.9
761.4
858.0
1038.5
Dy
ppm
272.4
72.2
317.2
91.8
97.3
64.1
174.9
244.2
117.7
88.8
239.9
321.3
505.0
173.3
136.5
316.9
149.3
83.3
84.0
255.5
386.3
121.1
171.3
77.8
85.6
85.6
89.5
215.2
72.1
288.1
185.7
77.5
91.5
110.7
Er
ppm
225.4
46.5
227.3
62.9
76.6
64.5
145.9
149.5
73.5
54.1
148.7
224.4
322.3
101.8
82.8
202.3
94.7
55.3
59.4
171.3
294.1
84.6
115.9
48.2
58.6
61.3
56.1
199.5
42.7
182.8
131.6
43.8
57.7
70.4
Eu
ppm
7.1
3.8
12.9
3.8
5.0
4.0
5.3
11.6
7.3
5.7
11.1
14.2
20.9
9.2
7.5
13.2
7.6
5.8
6.4
10.7
14.4
5.0
7.5
4.7
4.9
3.9
5.3
7.9
4.0
13.3
8.2
5.1
5.2
6.2
Gd
ppm
103.5
46.0
201.4
60.7
68.5
44.0
82.0
189.2
96.2
71.6
188.8
244.2
372.2
148.7
124.3
236.4
105.9
68.4
85.3
171.8
250.1
81.9
113.2
57.9
61.8
60.5
65.7
128.8
56.0
221.8
127.5
61.6
67.2
86.3
Ho
ppm
64.0
15.1
68.2
19.5
22.1
16.6
43.8
51.3
25.5
17.4
49.2
71.7
106.7
35.6
28.0
66.8
31.5
17.3
18.8
52.7
84.7
25.7
36.5
15.3
18.5
17.9
18.1
53.2
14.4
60.3
39.8
15.1
18.8
23.2
La
ppm
677.1
322.4
1418.6
363.7
515.4
545.9
420.0
1230.7
583.8
426.5
1049.6
1353.9
2217.9
880.1
685.3
1320.8
571.8
467.3
598.9
1101.1
1540.6
528.8
763.5
478.4
385.6
416.5
530.5
900.4
368.0
1450.9
863.4
383.5
425.3
539.1
Lu
ppm
28.9
6.2
33.6
8.8
11.9
15.6
21.7
17.6
9.8
7.3
16.1
32.1
41.6
12.4
8.7
21.6
10.1
7.5
11.1
19.7
43.9
11.2
14.4
6.1
7.1
7.9
6.3
36.8
4.5
18.8
19.3
4.1
5.7
6.8
Nb
ppm
4361.7
1433.7
3794.9
760.0
1963.2
3255.0
1809.2
2167.5
2076.8
1302.5
1924.3
2884.5
3900.1
1541.5
1292.3
3014.0
2961.7
865.0
2061.4
2114.2
2647.3
753.8
1113.8
653.4
1025.0
1116.7
540.5
3131.5
692.8
2944.8
1206.0
603.3
801.5
716.0
Nd
ppm
412.1
259.7
916.4
263.1
339.9
332.4
294.1
839.6
496.8
376.1
799.4
1014.2
1567.4
709.9
589.9
942.2
466.2
351.1
504.1
763.3
1022.2
366.2
512.2
316.4
291.7
290.1
332.9
592.8
286.6
1026.9
639.4
308.0
334.4
386.2
Pr
ppm
139.8
81.2
280.2
77.8
104.2
107.4
91.6
252.1
149.4
114.1
235.9
303.7
470.0
206.4
169.6
281.2
141.0
104.0
149.0
219.8
288.8
105.5
145.2
91.2
80.7
82.2
94.9
172.2
81.4
290.5
180.0
83.7
94.3
111.0
Sm
ppm
88.7
53.9
189.4
55.8
66.6
52.0
60.2
164.1
95.1
73.5
163.9
207.0
326.6
137.9
113.9
192.5
90.8
64.8
93.0
166.8
225.7
78.0
109.4
59.0
61.3
58.5
66.2
122.4
60.7
215.8
129.6
64.9
71.2
82.8
Ta
ppm
232.3
34.5
242.4
41.1
108.0
185.0
117.3
144.1
100.7
74.0
116.2
173.3
252.7
78.7
66.8
193.2
110.7
43.5
83.3
118.0
181.2
45.2
76.1
33.2
60.6
62.1
36.3
180.6
26.3
151.6
60.6
27.5
34.8
45.1
Tb
ppm
28.9
9.9
41.9
12.1
13.2
8.5
22.0
35.4
18.4
13.3
35.8
47.1
74.1
26.8
21.4
45.8
21.6
12.5
13.5
35.2
51.4
16.5
22.6
10.7
12.0
11.4
12.6
27.6
10.9
42.2
25.4
11.2
13.3
17.0
Tm
ppm
36.0
7.3
37.8
9.9
12.1
12.3
23.7
23.3
12.0
9.1
22.8
36.6
51.7
15.6
12.3
30.3
13.7
8.7
10.5
26.0
48.7
13.5
18.4
7.2
8.8
9.6
8.8
36.0
6.1
27.4
21.3
6.3
8.9
10.0
Y ppm
1543.3
396.4
1718.2
477.9
579.7
484.4
1114.8
1119.7
579.3
380.9
1127.5
1648.7
2432.5
894.1
708.7
1546.5
904.1
461.8
568.3
1300.9
2233.7
663.3
869.2
418.9
459.5
461.3
444.8
1492.1
408.9
1487.2
1054.6
398.9
494.2
559.5
Yb
ppm
220.7
45.9
242.4
65.5
87.2
99.6
156.8
134.9
75.7
55.0
129.3
234.0
307.6
91.1
70.8
170.2
80.9
54.8
70.1
156.7
325.5
85.3
117.5
45.4
55.7
59.9
54.3
250.6
37.6
157.7
140.5
36.6
51.0
62.5
TREO
ppm
8640
2894
10104
2743
3588
3463
5514
8544
5587
3749
7936
10944
16287
6366
5158
9731
4803
3256
4340
7865
11598
3847
5326
3031
2824
2896
3270
7117
2654
9892
6327
2727
3133
3750
dy6metals.com | ASX:DY6
11
Hole Id
MR027
MR027
MR027
MR027
MR027
MR027
MR028
MR032
MR032
MR032
MR032
MR032
MR032
MR032
MR033
MR033
MR033
MR033
MR033
MR033
MR034
MR034
MR034
MR034
MR034
MR034
MR034B
MR034B
MR034B
MR034B
MR034B
MR034B
MR034B
MR034B
MR035
MR035
From
99
103
104
105
106
107
79
0
1
8
11
45
48
51
0
1
3
34
35
75
1
2
16
17
18
19
6
8
11
12
14
15
17
40
0
1
To
100
104
105
106
107
108
80
1
2
9
12
46
49
52
1
2
4
35
36
76
2
3
17
18
19
20
7
9
12
13
15
16
18
41
1
2
Length
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Sample
MD03785
MD03789
MD03790
MD03791
MD03792
MD03793
MD03900
MD04373
MD04374
MD04384
MD04387
MD04427
MD04430
MD04433
MD04468
MD04469
MD04471
MD04508
MD04509
MD04555
MD04564
MD04565
MD04579
MD04580
MD04584
MD04585
MD04597
MD04599
MD04605
MD04606
MD04608
MD04609
MD04611
MD04637
MD04670
MD04671
Ce
ppm
1607.2
1286.4
1035.5
2131.0
2006.0
1430.7
5074.5
1426.8
1592.2
784.1
687.3
1147.2
1003.6
959.0
3242.9
1423.4
1078.8
1152.1
768.6
910.6
988.5
1364.9
2803.7
1839.9
1250.8
737.8
912.7
611.5
907.4
1454.7
1134.9
1163.8
4004.3
864.3
1279.9
1069.7
Dy
ppm
179.2
142.8
84.2
207.0
216.9
142.8
464.1
113.9
116.3
65.3
74.9
97.6
99.2
44.7
272.7
140.9
79.2
124.7
49.6
76.6
126.1
82.1
260.9
159.3
109.9
59.1
81.4
86.7
67.2
115.0
117.9
127.6
754.3
81.4
186.8
150.2
Er
ppm
116.1
94.4
50.5
128.9
141.2
96.9
316.2
91.1
94.9
49.5
53.9
72.6
65.2
30.6
238.5
110.0
59.3
94.1
37.8
63.2
100.4
56.3
172.4
112.2
75.9
37.7
54.7
83.5
44.8
66.3
85.0
101.4
388.8
55.4
142.8
116.6
Eu
ppm
8.7
6.9
5.7
10.6
9.9
6.5
24.6
5.9
5.8
3.2
4.2
5.6
5.5
3.4
8.7
5.4
4.8
7.6
4.3
4.9
5.6
6.1
12.8
9.2
6.1
4.2
5.4
3.3
4.6
7.7
6.0
6.0
28.0
6.1
7.3
6.2
Gd
ppm
132.8
109.8
78.9
167.5
165.5
112.0
394.4
77.7
78.1
48.7
54.2
72.0
74.3
40.2
137.4
86.2
70.7
99.9
45.7
62.1
75.7
78.2
200.4
131.9
91.4
53.4
61.3
50.6
61.0
103.6
84.4
89.0
497.0
64.0
105.5
84.0
Ho
ppm
37.3
30.6
17.4
42.0
46.2
30.6
97.0
26.8
27.3
14.5
16.9
21.6
20.8
9.8
68.0
32.6
18.0
29.1
11.9
17.4
29.5
17.9
54.9
34.8
23.4
12.2
17.2
22.0
13.8
21.9
25.5
28.7
142.9
17.5
41.6
33.8
La
ppm
821.9
666.1
499.1
1093.0
1083.1
749.4
2670.8
509.9
598.7
377.8
356.6
585.0
498.4
460.1
881.5
476.1
569.4
599.7
386.4
445.2
479.0
659.1
1453.2
985.6
651.7
376.1
492.2
330.0
484.5
750.3
597.9
629.3
2029.9
467.2
593.4
437.7
Lu
ppm
10.8
9.5
4.7
13.0
14.1
9.8
33.6
13.0
15.8
7.7
6.8
9.9
7.2
5.5
34.6
13.9
10.2
12.6
6.9
11.3
13.9
7.1
18.5
14.8
9.1
4.2
5.9
15.9
6.6
7.7
11.1
16.2
24.3
6.1
20.2
15.3
Nb
ppm
1357.9
1194.0
834.7
1952.7
1689.8
1311.2
4747.3
2531.1
4419.2
2400.9
997.0
2229.3
1037.8
4529.7
6765.6
1832.3
1305.4
958.3
1351.8
1707.4
1471.0
832.3
1682.2
1006.5
827.0
546.7
550.1
832.3
828.7
791.8
944.2
2262.6
1697.1
666.8
3296.9
3031.0
Nd
ppm
600.2
472.9
408.8
789.1
721.9
525.5
1829.4
366.7
410.9
259.4
241.4
379.1
349.5
309.0
570.5
350.8
369.5
424.1
273.9
323.9
347.6
501.2
1003.2
661.5
470.9
292.5
335.4
224.4
342.6
539.3
420.5
425.1
1575.2
337.3
447.6
332.2
Pr
ppm
172.9
136.1
117.8
227.8
209.0
153.4
534.3
114.7
130.4
78.4
71.5
114.7
103.4
97.5
190.3
106.2
115.1
126.3
84.9
99.5
107.9
149.8
298.1
195.7
138.1
83.2
97.9
66.4
100.4
159.6
123.8
125.4
443.5
96.8
135.8
101.2
Sm
ppm
128.8
100.9
83.0
163.7
148.1
106.0
383.9
72.4
78.1
49.0
50.0
75.6
72.3
50.1
114.9
79.5
68.1
86.2
49.1
66.2
72.3
93.2
201.5
131.6
98.8
57.6
65.5
47.0
66.4
114.0
87.7
89.4
385.0
68.8
99.3
76.6
Ta
ppm
83.0
73.9
35.5
94.4
114.8
80.5
233.1
130.1
250.3
142.3
55.3
136.3
52.8
246.2
424.5
116.5
82.5
67.2
84.6
82.5
103.7
56.5
131.7
80.0
46.4
20.8
37.4
64.7
61.3
62.8
66.7
155.2
62.0
49.6
178.6
143.6
Tb
ppm
27.5
21.8
14.0
31.9
32.8
22.3
74.2
17.0
16.6
9.6
11.1
14.7
14.4
6.9
33.1
18.3
11.9
18.1
7.6
11.1
16.2
13.3
38.8
24.2
16.8
9.4
11.9
11.1
10.6
18.6
16.8
18.4
110.3
12.2
24.0
19.6
Tm
ppm
16.1
13.4
7.2
18.4
20.1
14.2
47.3
14.5
15.6
7.8
8.1
11.1
9.3
4.9
40.0
18.1
10.1
14.9
7.0
10.2
16.2
8.6
24.5
16.7
10.6
5.1
7.7
13.8
7.1
9.5
12.1
15.5
43.3
7.2
21.6
17.8
Y ppm
897.9
753.9
465.6
1109.9
1143.1
741.5
2563.1
751.4
748.9
398.4
436.7
549.2
551.4
289.9
1845.5
877.4
521.2
761.8
340.1
543.9
796.4
479.5
1380.2
875.9
615.0
347.4
441.8
597.3
353.3
495.6
653.1
795.5
4152.1
397.3
1112.1
921.0
Yb
ppm
106.7
85.3
43.6
115.0
127.1
88.8
309.1
99.4
114.1
57.3
57.8
73.9
58.8
35.3
254.7
110.2
68.7
91.1
45.8
73.9
106.8
55.8
155.2
114.4
59.9
27.3
40.9
92.2
43.5
53.4
72.9
98.0
209.4
43.6
135.8
102.0
TREO
ppm
5866
4742
3516
7537
7340
5100
17865
4482
4892
2669
2573
3896
3541
2830
9636
4665
3686
4398
2557
3285
3969
4306
9742
6397
4375
2541
3174
2727
3027
4714
4162
4503
17916
3041
5268
4221
dy6metals.com | ASX:DY6
12
Hole Id
MR035
MR035
MR035
MR035
MR035
MR035
From
26
28
29
40
55
66
To
27
29
30
41
56
67
Length
1
1
1
1
1
1
Sample
MD04699
MD04704
MD04705
MD04716
MD04734
MD04748
Ce
ppm
1384.2
1314.4
1026.3
837.0
809.3
740.5
Dy
ppm
105.0
115.8
84.7
58.8
68.7
55.4
Er
ppm
67.2
75.5
67.2
35.1
43.4
36.0
Eu
ppm
6.4
7.5
4.2
5.2
4.5
4.6
Gd
ppm
93.8
100.4
63.1
57.3
58.0
51.2
Ho
ppm
20.7
24.4
18.6
11.8
14.1
12.2
La
ppm
692.6
695.0
544.3
442.6
451.6
389.1
Lu
ppm
7.6
9.9
12.2
4.3
5.4
5.2
Nb
ppm
1476.2
1484.4
2627.2
1003.7
860.2
2181.3
Nd
ppm
516.5
475.6
344.6
305.2
286.4
262.5
Pr
ppm
148.0
140.5
106.4
90.2
86.0
78.7
Sm
ppm
99.4
95.2
62.5
55.9
57.3
48.3
Ta
ppm
66.5
79.5
148.7
48.7
44.8
106.9
Tb
ppm
16.1
17.3
11.7
8.7
10.5
8.6
Tm
ppm
9.6
11.7
11.5
5.3
6.4
5.8
Y ppm
555.5
700.2
577.3
343.4
388.1
366.9
Yb
ppm
53.0
71.1
81.0
32.3
40.2
37.2
TREO
ppm
4550
4651
3641
2764
2809
2537
dy6metals.com | ASX:DY6
13
APPENDIX 1. JORC Code, 2012 Edition Table 1 – Machinga HREE-Nb-Ta Project
The following Tables are provided to ensure compliance with the JORC Code (2012 Edition) requirements for the reporting of Exploration Results at Machinga.
Section 1: Sampling Techniques and Data
(Criteria in this section applies to all succeeding sections)
Criteria
Sampling techniques
Commentary
•
RC drilling at Machinga was to test mineralisation identified in trenching and validate historical drill results. This drilling was sampled at one metre intervals,
from which a 2-4kg sub sample was collected for laboratory multi-element analysis including: Be, Ca, Ce, Dy, Er, Eu, Ga, Gd, Hf, Ho, La, Li, Lu, Nb, Nd,
P, Pr, Sm, Sn, Ta, Tb, Th, Tm, U, W, Y, Yb, Zr
Samples were tested for radioactive content using a hand-held scintillometer; based on these results, zones of apparently low grade mineralisation were
manually composited from the analytical sample split.
A scoop portion was combined into a representative 3m sample with the balance of the analytical split sample available for follow-up analysis if required.
Drilling techniques
•
•
•
•
A total of 3543m of RC drilling has been completed at Machinga in 2023, with a maximum hole depth of 120m.
The PR54R RC drilling rig was supplied by Thompson Drilling of Tete, Mozambique.
The Diamond drill rig was supplied by Thompson Drilling of Tete.
Both types of drilling were surveyed downhole using REFLEX GYRO SPRINTIQ north seeking gyroscopic units at 5m intervals.
Drill sample recovery
•
•
•
•
•
•
Sample recoveries were monitored by the geologist in the field during logging and sampling.
If poor recoveries were encountered, the geologist and driller endeavor to rectify the problem to ensure maximum sample recovery.
Visual assessments are made for recovery, moisture and possible contamination.
Samples were split through a rig mounted static cone splitter to obtain a representative sample, which was inspected and cleaned as required.
Samples were predominately dry, four RC holes were terminated early short of full depth due to excessive water inflows.
Insufficient data exists to determine whether a relationship exists between grade and recovery. This will be assessed when sufficient statistical data is
available.
Logging
•
•
•
•
Drill samples were geologically logged over 1m lengths intervals to an appropriate level of detail to correlate specifically with sampling.
Geological logging of drilling was quantitative in nature.
All RC drill holes were logged in full.
All diamond drill holes are being geologically logged in detail.
•
•
•
The RC drill ~30kg samples were riffle split in the field to obtain a representative sub-sample of 2-4kg.
All portions of the samples were weighted.
Samples were mostly dry.
•
•
Sub-sampling
techniques and sample
preparation
dy6metals.com | ASX:DY6
14
Criteria
Commentary
•
•
•
•
•
Quality of assay data
and laboratory tests
•
Samples from the RC and DDH drilling were submitted to Intertek Minerals Laboratory Services in Kitwe, Zambia for sample preparation prior to export
to Perth, Western Australia for analysis sodium peroxide fusion (DX) with hydrochloric acid digest ICP/OES or MS finish as appropriate.
At Intertek, samples were dried, then crushed to either -2mm or -10mm as appropriate. Large samples were riffle split and the excess stored. Samples
were pulverized in an enclosed unit to 85% -75micron. A 120-150gm analytical split was taken for export to Australia and the pulp residue was retained
and stored.
Elements analysed for the drill samples were: Ce, Dy, Er, Eu, Ga, Gd, Hf, Ho, La, Lu, Nb, Nd, Pr, Rb, Sm, Sn, Ta, Tb, Th, Tm, U, Y, Yb, Zr.
A field duplicate, blank (silica sand) and a CRM (certified reference material) were inserted approximately every 20 samples for the drilling samples.
CRM codes were recorded to maintain on-going quality assurance and acceptable levels of accuracy and precision.
Three separate CRM were utilised of low, medium and high REE content in a rolling sequence during drilling.
•
•
Assay results are reviewed by 2 company personnel.
No adjustments to data were considered necessary.
•
Not reported
•
•
•
Drillhole collars were surveyed using DGPS on completion of the program by a licensed surveyor.
The grid system used is UTM Zone 36S, WGS 84.
Approximately 50% of the historical drill collars were located and re-surveyed to ensure coherency between both phases of drilling.
•
•
•
•
Verification of sampling
and assaying
Verification of
sampling and
assaying
Location of data points
Data spacing and
distribution
•
•
•
•
Orientation of data in
relation to geological
structure
The field sample size of approximately 2kg or greater is appropriate to the grain size of material sampled.
Appropriate industry standard quality control procedures were adopted at each stage of sub-sampling to maximise representivity of samples, with
reference standards inserted during drilling, nominally every 20 samples.
Field duplicates were used at a rate of 5% and analyzed to ensure representivity of in situ material, nominally every 20 samples.
Diamond drill is being halved for analysis with the sample being weighted.
Sample intervals are nominally 1m intervals and varied based on lithological or mineralisation contacts as required.
Current drillhole spacing is irregular as the program was first pass evaluation.
Drill samples were collected on 1m intervals on site and composited to 3m samples in zones indicated by the scintillometer to be only weakly
mineralize
Share your feedback
Discover