ASX Announcement
31 July 2026
Quarterly Activities Report: For the period ending 30 June 2026
Highlights
Cameroon Portfolio
• Central Project: field activities advanced across the Cameroon central portfolio, with hand-auger
drilling at the Bounde and Nganda licences along the historically mapped high-grade rutile corridor
and systematic soil sampling at Yaoundé West, supported by the in-country Yaoundé HMS
laboratory.
• Douala Basin: JORC (2012) Exploration Target of 2.1–2.6 billion tonnes at 2.1–2.3% THM,
including indicative grades of 0.3–0.35% rutile and 0.06–0.07% zircon, establishes Douala as a
globally significant emerging rutile-bearing mineral sands system. Note: the potential quantity and
grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation
of a Mineral Resource. The Exploration Target has been prepared and reported in accordance
with the JORC Code (2012 Edition).
Malawi Portfolio – Mzimba Rutile Project
• Follow-up exploration program completed: the Company completed the first modern,
systematic rutile exploration programme across the ~710km² Mzimba Project, on time and within
budget, generating the project's first project-wide rutile-focused geochemical dataset.
• Extensive sampling: regional mapping, six exploration pits, 31 channel samples and 159 soil
samples were completed, with well-developed regolith, mottled clays and visible rutile grains at
surface and in panned concentrates supporting the potential for a large-scale residual rutile
system.
• Assays pending: samples are being processed through Tusker's in-country infrastructure in
Malawi, with initial rutile assays expected in the coming weeks; the Company remains fully funded
for this phase.
Corporate
• Divestment of Tundulu REE Project: binding agreement entered into with AuKIng Mining
(ASX:AKN) to divest the Company’s Tundulu REE Project in Malawi for total consideration of
A$5.55 million, providing non-dilutive funding while retaining equity exposure in AKN.
• Bonus Loyalty Options: the Company completed a 1 for 7 non-renounceable pro-rata bonus
issue of quoted Loyalty Options offered to its shareholders.
• Quarter-end cash position: ~A$1.35 million.
• Engage with this announcement at the Tusker Minerals Investor Hub.
Tusker Minerals Ltd (ASX: TSK, ‘Tusker’ or ‘Company’) has released its Quarterly Activities Report for
the period ended 30 June 2026, providing an overview of activities completed during the quarter.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Chief Executive Officer, Cliff Fitzhenry, commented:
“This was a highly active quarter that has meaningfully advanced our core mineral sands strategy. In
Malawi, we completed the first modern, systematic rutile exploration program at Mzimba, generating
the project’s first project-wide geochemical dataset across a large and highly prospective package. In
Cameroon, we progressed hand-auger drilling along the Bounde–Nganda high-grade residual rutile
corridor and, importantly, commissioned Mineral Technologies to define a maiden JORC (2012)
Exploration Target for our port-proximal Douala Basin HMS Project – a significant step that begins to
quantify the scale of this near-surface, high-grade opportunity.
Alongside this, the Tundulu divestment to AuKing delivered non-dilutive capital and allow us to sharpen
our focus squarely on our rutile and heavy mineral sands portfolio in Cameroon and Malawi – the assets
where we see the strongest near-term discovery and development potential.
With Mzimba and Central Rutile assays imminent, the next work programs at Douala Basin to
commence shortly, Tusker is well positioned for a catalyst-rich second half of 2026.”
Operational Overview
Cameroon Portfolio
Central Rutile Project Update
The Company provided an operational update on its Cameroon exploration during the quarter. Hand-
auger drilling continued at the Bounde and Nganda licences, systematically testing the historically
defined 70 × 15km BRGM-mapped high-grade residual rutile corridor, while systematic soil sampling
advanced across the Yaoundé West licence package, supported by portable XRF (pXRF) analysis and
airborne radiometric data to define priority titanium and rare earth element (monazite) targets.
Samples generated across the portfolio are being processed through the Company's Yaoundé HMS
laboratory to accelerate turnaround and reduce costs, with initial results expected shortly.
Douala Basin HMS Project
At the Douala Basin HMS Project, the Company commissioned independent consultants Minerals
Technologies to provide a maiden JORC (2012) Exploration Target (refer announcement 17 July 2026).
Table 1: Douala Basin HMS Project – JORC (2012) Exploration Target*.
Parameter Exploration Target Range
Tonnage 2.1–2.6 Bt
THM Grade 2.1–2.3%
Indicative Rutile Grade 0.3–0.35%
Indicative Zircon Grade 0.06–0.07%
Contained HM 48–55 Mt
Indicative Contained Rutile 7–8 Mt
Indicative Contained Zircon 1.4–1.7 Mt
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
*Note: Exploration Target reported at a cut-off grade range of 0.5% and 1.5% THM. Contained rutile and zircon
figures are derived from the reported 48–55 Mt contained HM range and the modelled grand-total mineral
assemblage of approximately 15% rutile and 3% zircon of THM. Indicative in-situ rutile and zircon grades are
derived from the reported THM grade range and modelled grand-total mineral assemblage and are conceptual in
nature.
Cautionary Statement: The potential quantity and grade of the Exploration Target reported in this announcement
is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain
if further exploration will result in the estimation of a Mineral Resource. The Exploration Target has been prepared
and reported in accordance with the JORC Code (2012 Edition).
Figure 1: Diwong South Exploration Target showing modelled THM distribution on the left and rutile
as a percentage of THM on the right.
The Douala Basin Exploration Target marks the emergence of a potentially major new rutile-bearing
heavy mineral province in Central Africa. Large-scale natural rutile systems are rare globally, and
Douala is differentiated by an unusual combination of multi-billion-tonne scale, a rutile-rich titanium
mineral suite, significant kyanite co-product potential, shallow mineralisation and exceptional proximity
to established port and infrastructure. These attributes are seldom found together at this scale.
Importantly, the current Exploration Target is confined to the modelled ~152km² Diwong South area,
representing only ~6% of Tusker’s broader 2,580km² Douala Basin Project. The target is also vertically
constrained by an interpreted basement surface, while much of the historical drilling terminated at
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
approximately 18–24 metres, with mineralisation remaining open at end of hole in numerous areas.
This provides clear potential for additional scale at depth.
Beyond Diwong South, Tusker has completed limited reconnaissance work, but some initial testing has
demonstrated rutile mineralisation across multiple additional targets within the broader project area.
Initial reconnaissance drilling has already returned materially higher-grade, near-surface mineralisation
outside the current Exploration Target, highlighting the potential for further mineralised domains across
the basin.
With broad lateral continuity demonstrated across Diwong South, historical drilling locally ending in
mineralisation, and higher-grade reconnaissance results emerging elsewhere, substantial scope
remains to expand the known mineralised footprint both laterally and at depth. The current Exploration
Target therefore represents an initial foundation within a much larger, largely untested 2,580km² district-
scale opportunity.
Few globally significant mineral sands projects combine multi-billion-tonne scale with direct access to
established port, power, transport and industrial infrastructure. Douala is fundamentally differentiated
by its proximity to established roads, power, industrial services, skilled labour and international port
infrastructure.
The project is located within approximately 40km of the Port of Douala, providing access to established
export infrastructure and major international shipping routes. Key advantages include:
• Existing road access;
• Proximity to power, telecommunications and skilled labour;
• Access to industrial services within the Douala economic corridor; and
• Materially shorter logistics chains than many remote inland African projects.
Together, these attributes have the potential to materially reduce development complexity, logistics
costs and execution risk relative to many remote peer projects.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Figure 2: Douala Basin Project tenure relative to the Port of Douala, showing indicative 25km and
50km logistics catchment zones and the Project’s strategic proximity to critical export infrastructure.
Mineral Technologies’ independent review has established a clear program of exploration activities
designed to test and potentially advance the current Exploration Target at the Diwong South Deposit.
The Exploration Target is conceptual in nature. There is no certainty that further exploration will result
in the estimation of a Mineral Resource. This section is intended solely to explain the exploration works
Tusker considers necessary to test the validity of the Exploration Target.
The existing dataset demonstrates broad lateral continuity across two coherent mineralised domains,
with the upper plateau and core mineralised areas providing the strongest initial focus for the Company.
Tusker intends to pursue the following targeted, capital-efficient exploration activities to test the
Exploration Target:
• Priority infill and step-out drilling on the highest-confidence portions of the current
Exploration Target (upper aeolian plateaus) to support resource conversion;
• Deeper drilling to test extensions below the historical ~18–24m depth limit where mineralisation
remains open;
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
• Expanded mineralogical and metallurgical test work focused on rutile, zircon and kyanite
recovery and product characteristics; and
• Updated geological and block modelling incorporating new drilling and technical data.
These activities are targeted for completion within approximately 6–9 months, subject to drilling
outcomes, permitting and assay turnaround. The Company intends to undertake elements of this work
in parallel with broader growth drilling across the wider Douala Basin Project to test additional
prospective target areas outside the current Exploration Target footprint.
Figure 3: Map of Cameroon showing Tusker Mineral’s Central Rutile Project in green, and the Douala
Basin Project in blue, encompassing +11,000km2 of highly prospective tenure.
Malawi Portfolio
First Systematic Rutile Exploration Program Completed at Mzimba
The Company completed its first modern, systematic rutile exploration program at the Mzimba Project
in northern Malawi, on time and within budget. Work completed included regional geological mapping,
the excavation of six exploration pits, and the collection of 31 channel samples and 159 soil samples
across the ~710km² licence package, comprising three tenements: Mzimba West (EL0784), Mzimba
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Central (EL0732) and Mzimba South (EL0783) (Figure 4). Together these generated the first project-
wide, rutile-focused geochemical dataset for the project.
Field observations were encouraging, with well-developed regolith, extensive mottled clay horizons,
deeply weathered saprolitic profiles, and visible heavy minerals including rutile grains observed both at
surface and within panned concentrate samples – all consistent with the development of a residual
rutile system analogous to major rutile systems elsewhere in the Irumide Belt. Samples are being
processed through Tusker's in-country infrastructure in Malawi, with initial rutile assay results expected
within the coming weeks.
Figure 4: Phase 1 completed soils and pit samples, Mzimba Rutile Project.
Planned next steps at Mzimba:
• Completion of sample processing and reporting of initial rutile assay results.
• Follow-up wide-spaced and infill soil sampling to expand and refine the geochemical footprint.
• Auger drilling to test the depth, distribution and continuity of rutile mineralisation.
• Ongoing target definition ahead of future resource-focused programs.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Corporate
Divestment of the Tundulu REE Project
During the quarter the Company announced the sale of its 100% interest in the Tundulu REE Project
in Malawi to AuKing Mining Limited (ASX: AKN) for total consideration of A$5.55 million, comprising
staged cash and equity.
The transaction provides non-dilutive funding to support the Company's activities through 2026 while
retaining exposure to Tundulu's upside through the Company's holding of AuKing securities.
Bonus Loyalty Options
During the quarter the Company completed a non-renounceable pro-rata bonus issue of Loyalty
Options to eligible shareholders, on the basis of one (1) quoted Loyalty Option for every seven (7)
Shares held, for a total of 11,789,576 Options. The Options were issued at a nil issue price, exercisable
at $0.15 and expiring three (3) years from the date of issue.
Change of Registered Office and Principal Place of Business
During the quarter the Company changed its registered office and principal place of business to Ground
Floor, 8 St Georges Terrace Perth WA 6000.
Release of Shares from Escrow
During the quarter a total of 10,000,000 shares were released from voluntary escrow.
Tenement Schedule
This section is provided in compliance with ASX Listing Rule 5.3. Please refer to Annexure 1 for a
complete list of tenements currently held by the Company.
During the quarter, no tenements were acquired by the Company across its Malawi or Cameroon
portfolio. The disposal of the Tundulu tenement (EL0731) is subject to completion of the AuKing
transaction.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, the Company reports that exploration expenditure incurred during
the June 2026 quarter was A$490,000 (note 2.1(d)). There were no mining production and development
activities during the quarter.
Cash Position
Cash at the end of the quarter: ~A$1.35million.
Note 6 of Appendix 5B
Payments to related parties of the entity and their associates: during the June 2026 quarter A$85,000
was paid to directors and associates for director, consulting, company secretarial and accounting fees.
-ENDS-
This announcement has been authorised by the Board of Tusker Minerals.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
More information
Mr Daniel Smith Mr Cliff Fitzhenry
Executive Chairman Chief Executive Officer
dan@tuskerminerals.com cliff@tuskerminerals.com
About Tusker Minerals
Tusker Minerals is an African-focused explorer advancing a world-class portfolio of critical mineral assets across
Cameroon & Malawi. Tusker's projects include the Central Rutile Project and Douala Basin HMS Project in
Cameroon and the Mzimba, Machinga and Salambidwe Projects in Malawi.
Competent Person Statement
The exploration results referred to in this report were reported by the Company in its ASX announcements
released during the quarter in respect of its projects on 8 May 2026, 29 May 2026, 1 June 2026, 22 June 2026,
and 17 July, each of which contained a Competent Person Statement.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in those original market announcements and that all material assumptions and technical parameters
underpinning those results continue to apply and have not materially changed. The Company confirms that the
form and context in which the Competent Person's findings are presented have not been materially modified from
the original market announcements.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking statements, opinions
and estimates are only predictions and are subject to risks, uncertainties and assumptions which are outside the
control of Tusker Minerals. Past performance is not necessarily a guide to future performance and no
representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking
statements, opinions or estimates. Actual values, results or events may be materially different to those expressed
or implied in this announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements, opinions or
estimates. Any forward-looking statements, opinions or estimates in this announcement speak only at the date of
issue of this announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules,
Tusker Minerals does not undertake any obligation to update or revise any information or any of the forward-
looking statements, opinions or estimates in this announcement or any changes in events, conditions or
circumstances on which any such disclosures are based.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Annexure 1 – Tenements
In accordance with Listing Rule 5.3.3, TSK advises the details of the tenements currently held by the Company or its
subsidiaries as at 30 June 2026.
Cameroon
Project Tenement Status Acquired during
quarter
Disposed during
quarter
Held at end of
quarter
Douala Mungo Granted - - 100%
Douala Mbanga Granted - - 100%
Douala Maleke Application - - 100%
Douala Diwong Application - - 100%
Douala Mbongo Application - - 100%
Douala Edea Sud Granted - - 100%
Douala Nganda Application - - 100%
Central Nsimbo Application - - 100%
Central Kombo Application - - 100%
Central Bounde Application - - 100%
Central Alamba Application - - 100%
Central Biyan Application - - 100%
Central Nlong Application - - 100%
Central Awae Application - - 100%
Central Ayene II Application - - 100%
Central Assi Application - - 100%
Central Bissoua_II Application - - 100%
Central Soleye Application - - 100%
Central Soleye_W Application - - 100%
Central Ayene Application - - 100%
Central Matomb Application - - 100%
Central Makak Application - - 100%
Central Mapan Application - - 100%
Central Lobo Application - - 100%
Central Lipombe Application - - 100%
Central Dibang Application - - 100%
Central Ekoundindi Application - - 100%
Malawi
Project Tenement Status Acquired during
quarter
Disposed during
quarter
Held at end of
quarter
Machinga (Main) EPL0529 Granted - - 100%
Machinga
(Extended Area)
EPL0705 Granted - - 100%
Salambidwe EPL0518 Granted - - 100%
Ngala Hill EPL0510 Granted - - 100%
Tundulu EL0731 Granted - - (see note) 100% (subject to
AuKing earn-
in/divestment)
Mzimba (West) EL0784 Granted - - 100%
Mzimba (Central) EL0732 Granted - - 100%
Mzimba (South) EL0783 Granted - - 100%
Karonga EL0782/24 Granted - - 100%