High-grade REE & P trench results returned from Tundulu
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
17 October 2024
High-grade REE & P2O5 trench results
returned from Tundulu to assist with metallurgy
DY6 Metals Ltd (ASX: DY6, “DY6” or the “Company”) is pleased to report the results from its recent
metallurgy sampling program at the Tundulu REE & Niobium carbonatite project in Malawi.
Highlights:
•
A total of 63 metallurgical samples were collected from 37 sample locations along high-grade
historic trench (TUTR10) at Tundulu
•
Sampling results returned up to a high of 3.35% TREO and 27.5% P2O5 over the sampled 83m
length of trench TUTR10:
o an exciting component of the sampling results is the average HREO, being 13% of the TREO
basket
o undetectable to very low levels of deleterious elements including mercury, lead and cadmium in
the phosphorus (P) rich rocks confirms the exceptional grade quality of the phosphate at
Tundulu; and
o the sampling is representative of the mineralised Bastnaesite and Apatite carbonatite rock types
exposed within the trench
•
Selected samples are being collected to form a 150kg composite to be sent for metallurgical
analysis
•
5 bioavailability composite samples were also taken across various historical trenches at Tundulu,
targeting phosphate-rich rocks, to determine the solubility of phosphate in the samples and
understand its potential for direct fertilization
•
Majority of samples showed excellent P solubility (using 2% citric acid) of over 40%, with one
returning solubility of 81%. This is above the industry threshold of 9.4% P2O5 solubility using Citric
Acid as the reagent in the acid leach process
•
9 samples representing predominant lithologies at Tundulu have been collected and will also be
sent to RSC Australia for petrographic examination to validate the historical mineralogical and rock
composition
•
Samples from the Company’s recent reconnaissance soil and rock chip program at the Ngala Hill
PGE, Cu & Ni Project have been submitted to SGS South Africa for analysis, with results expected
towards the end of the month
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
Tundulu REE Project
Tundulu is formed of several hills in a ring around a central vent called Nathace Hill where the majority of
the historic surface sampling and drilling was undertaken. The predominant geology at Nathace Hill is REE
apatite hosting carbonatites and feldspathic breccia and comprises a large inner agglomerate vent. Mineral
rich carbonatite also occurs at Tundulu Hill east of Nathace and Makhanga Hill west of Nathace and is
previously unexplored and prospective for REEs and niobium mineralisation.
REE mineralisation remains open towards southern and western directions of Nathace Hill and potentially
extends beyond the boundaries of the previously established mineralised area over Tundulu Hill. Initial
indications of mineralisation appear to be high in valuable MREEs and low measurable radioactive uranium
(U) and thorium (Th). This compares favourably to Lynas Rare Earths’ Mount Weld Central Lanthanide
Deposit where Th and U concentrations in the ore are approximately 660 ppm and 25 ppm respectively. 1
Figure 1. Map of Tundulu license area (EL0731)
1 Mt Weld Rare Earths Project Mine Closure Plan March 2021, Appx G - Mine Closure Plan.pdf (epa.wa.gov.au)
dy6metals.com | ASX:DY6
2
A total of 63 metallurgical samples were collected from 37 sample locations along high-grade historic trench
(TUTR10) at Tundulu.
Sampling results returned up to a high of 3.35% TREO and 27.5% P2O5 (average of 0.85% TREO and
8.26% P2O5) over the sampled 83m length of trench TUTR10. The average HREO component of the TREO
basket was 13%, with high-value heavy rare earth elements Dy & Tb contributing 2.5%. Undetectable to
very low levels of deleterious elements including mercury, lead and cadmium in the P-rich rocks confirms
the exceptional grade quality of the phosphate at Tundulu.
The sampling is representative of the mineralised Bastnaesite and Apatite carbonatite rock types exposed
within the trench. Select samples are being collected to form a 150kg composite to be sent to for
metallurgical analysis.
5 bioavailability composite samples were also taken across various historical trenches at Tundulu, targeting
phosphate rich rocks. ‘Bioavailability’ is used for analysis on phosphorous rock sources to determine the
solubility of phosphate in soils. This analysis is useful in determining whether a particular phosphate rock
type is suitable for direct fertiliser applications where the phosphate would be applied directly to the soil for
uptake.
The analysis has been undertaken at Nagrom metallurgical and analytical laboratory in Kelmscott, Western
Australia under standard atmospheric conditions using 2% citric acid. The majority of samples showed
excellent phosphorus (P) solubility of over 40%, with one returning solubility of 81%. The exceptional quality
of the phosphate-rich rocks at Tundulu is manifested by their undetectable to very low levels of deleterious
elements including mercury, lead and cadmium.
The metallurgical test work will aim to evaluate historical studies undertaken at Tundulu and assess the
findings from a 2017 metallurgical report, completed by the previous operators of the licence. The test work
will initially focus on validating the beneficiation results achieved by the previous laboratory.
Conducting test work at this early stage enables the Company to ascertain the preliminary viability of
producing two product streams: namely a REE commercially saleable concentrate and a mixed phosphate
concentrate containing rare earths.
Ngala Hill PGE, Ni & Cu Project
Samples taken from the Company’s recent reconnaissance soil and rock chip program at the Ngala Hill
PGE, Cu & Ni Project have been submitted to SGS South Africa for analysis. The Company expects to
release results from this program towards the end of the month.
dy6metals.com | ASX:DY6
3
Figure 2. Weighing and collection of samples from Trench 10 (TUTR10)
-ENDSThis announcement has been authorised by the Board of DY6.
dy6metals.com | ASX:DY6
4
Abbreviations
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3,
Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO% = HREO/TREO * 100
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
MREE=Nd, Pr, Dy, Tb
P = Phosphorus
P2O5 = Phosphorus pentoxide
More information
Mr Daniel Smith
Mr John Kay
Mr Luke Forrestal
Chairman
Director & Company Secretary
Investor Relations
dan.smith@dy6metals.com
john.kay@dy6metals.com
+61 411 479 144
Competent Persons Statement
The Information in this announcement that relates to exploration results, mineral resources or ore reserves
is based on information compiled by Mr Allan Younger, who is a Member of the Australasian Institute of
Mining and Metallurgy. Mr Younger is a consultant of the Company. Mr Younger has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to the activity
that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the `Australian
Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr
Younger consents to the inclusion of this information in the form and context in which it appears in this
announcement. Mr Younger holds shares in the Company.
dy6metals.com | ASX:DY6
5
Table 1: DY6 Rock Chip Sample Results – Tundulu Project
Sample ID
Easting
Northing
La (ppm)
Ce (ppm)
Dy
(ppm)
Eu
(ppm)
Nb
(ppm)
Nd
(ppm)
Pr (ppm)
Sm
(ppm)
Tb
(ppm)
Y (ppm)
P2O5
wt%
TREO
(ppm)
PHA0006
801329
8280169
1464
1949
26.76
14.68
1298
735
248
69.2
6.17
110
2.72
5,610
PHA0007
801331
8280169
91.1
167
4.56
2.45
244
68
19.96
9
0.9
24.6
0.72
477
PHA0008
801333
8280168
1661
2355
150
47.52
595
890
284
161
27.82
622
11.96
7,753
PHA0009
801335
8280168
4143
5087
196
54.34
4037
1529
543
196
33.89
852
17.03
15,539
PHA0010
801337
8280167
1290
2013
173
54.06
658
868
258
175
31.53
735
12.29
7,057
PHA0011
801338
8280167
1325
1746
244
65.54
785
847
237
199
43.43
1009
16.34
7,299
PHA0012
801340
8280166
675
881
41.7
11
276
237
78.03
38.1
7
191
3.83
2,673
PHA0013
801342
8280166
820
1135
91.86
30.46
504
533
151
102
16.89
386
5.94
4,099
PHA0014
801344
8280165
1069
1664
162
50.07
388
752
214
160
29.62
653
10.17
6,044
PHA0015
801346
8280165
436
682
53.17
14.82
262
242
68.37
47.8
9.42
223
3.66
2,237
PHA0016
801348
8280164
690
1204
172
45.87
854
508
132
136
30.01
704
12.04
4,681
PHA0017
801350
8280164
1418
2925
235
77.96
2151
1511
416
275
41.82
1129
18.43
10,151
PHA0018
801352
8280163
1610
3119
419
111
2005
1595
440
335
73.52
1645
27.53
11,961
PHA0019
801354
8280163
1617
2450
202
55.94
2610
1098
330
183
35.22
740
11.81
8,406
PHA0021
801356
8280162
657
1225
185
43.71
196
510
135
126
31.79
702
10.71
4,655
PHA0022
801358
8280162
1528
2061
224
54.88
591
899
265
171
37.94
840
12.6
7,671
PHA0023
801360
8280161
526
976
86.92
24.25
408
372
106
73.8
16
350
4.98
3,198
PHA0024
801362
8280161
644
1171
119
29.34
542
424
123
86
21.25
435
6.55
3,871
PHA0025
801364
8280160
190
394
19.03
5.07
218
117
35.71
17.5
3.15
81.2
1.6
1,075
PHA0026
801366
8280160
232
504
98.44
23.13
361
195
50.49
57.5
17.74
368
5.62
2,029
PHA0027
801367
8280159
1815
3442
106
51.24
270
1530
460
205
22.05
410
6.01
9,891
PHA0028
801369
8280159
3268
4446
98.94
40.92
295
1329
476
154
20.33
377
5.99
12,461
dy6metals.com | ASX:DY6
6
Sample ID
Easting
Northing
La (ppm)
Ce (ppm)
Dy
(ppm)
Eu
(ppm)
Nb
(ppm)
Nd
(ppm)
Pr (ppm)
Sm
(ppm)
Tb
(ppm)
Y (ppm)
P2O5
wt%
TREO
(ppm)
PHA0029
801371
8280158
1834
2970
137
52.83
397
1252
387
186
26.91
490
8.37
9,079
PHA0030
801373
8280158
1831
3481
133
55.41
404
1414
450
206
26.31
496
7.8
10,003
PHA0031
801375
8280157
1845
3554
87.29
53.56
2514
1629
479
230
18.76
301
4.8
10,052
PHA0032
801377
8280157
1854
2766
135
57.63
216
1311
371
222
26.86
465
7.17
8,924
PHA0033
801383
8280155
4853
5614
122
64.83
77
1699
583
249
25.56
415
5.87
16,603
PHA0034
801385
8280154
7949
8553
96.58
56.8
77
2091
812
225
20.98
336
4.58
24,355
PHA0035
801387
8280154
827
1358
48.75
18.58
22
427
133
65.7
9.11
182
2.92
3,782
PHA0036
801389
8280153
1246
2062
85.89
30.61
94
673
204
107
16.28
319
6.82
5,867
PHA0037
801391
8280153
1014
1640
42.55
17.59
69
515
160
69.5
8.29
167
7.6
4,455
PHA0039
801393
8280152
1289
2006
60.57
24.45
92
571
182
85.3
11.99
218
6.29
5,469
PHA0040
801394
8280152
1491
2523
61.89
25.4
98
737
234
96.8
12.04
245
7.02
6,649
PHA0041
801396
8280151
10000
10000
211
147
109
4985
1000
628
51.45
647
7.17
33,597
PHA0042
801398
8280151
2429
3828
123
62.06
194
1769
523
259
24.6
435
5.62
11,601
PHA0043
801400
8280150
2614
3933
153
61.01
243
1635
504
242
28.41
534
9.41
11,944
PHA0044
801402
8280150
2514
3814
130
58.81
261
1671
504
240
25.66
441
5.83
11,540
dy6metals.com | ASX:DY6
7
Table 2: DY6 Bioavailability Sample Results – Tundulu Project
SAMPLE
ID
Easting
Northing
Mass
(kg)
Moisture
(%)
Ce
(ppm)
Y
(ppm)
U
(ppm)
Th
(ppm)
P2O5
(%)
P
Extraction
(%)
CaO
(%)
Al2O3
(%)
Fe2O3
(%)
MgO
(%)
SiO2
(%)
S (%)
F
(ppm)
Cl
(%)
Cd
(ppm)
Pb
(%)
Hg
(ppm)
PHA001
801356.01
8280200.36
0.252
2.16
816
274
9.5
70.0
4.906
41.49
6.80
7.96
18.49
0.13
41.40
3.465
2800
<0.01
2
0.030
<0.01
PHA002
801342.83
8280193.89
0.253
3.64
1330
547
6.0
114.5
10.543
16.26
10.50
0.67
27.38
0.07
26.68
5.239
4400
0.01
<1
0.043
<0.01
PHA003
801356.37
8280203.35
0.253
0.78
1141
68
7.5
73.5
2.400
71.45
5.42
12.51
7.33
0.18
51.78
0.540
600
0.01
2
0.006
<0.01
PHA004
801313.88
8280131.15
0.248
0.71
888
53
5.5
48.5
1.272
80.50
2.61
14.22
5.60
0.26
58.16
0.044
<200
<0.01
1
0.004
0.03
PHA005
801311.69
8280087.32
0.254
0.78
1044
79
8.0
67.0
1.086
61.30
1.30
11.59
7.16
0.09
64.31
0.007
400
<0.01
2
0.002
0.01
dy6metals.com | ASX:DY6
8
Annexure A: JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
•
•
•
•
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are Material
to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverized to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
•
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer,
•
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
Drill sample
recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
•
•
•
Field rock chip samples of outcrop were taken by field staff from
outcrops utilising a geo-pick and hand tool. Samples are
photographed and stored in labelled clear plastic bags for transport
to the lab for analysis. Results are attached.
Samples were selected more on the basis of understanding
lithotypes rather than being fully representative of mineralisation.
No recent drilling is utilised on this program or reported in this
announcement. Previous exploration included 2874m of diamond
drilling and 6172m of RC drilling.
Not recorded in historic data. Further review needs to be
undertaken by the Company.
dy6metals.com | ASX:DY6
9
Logging
Criteria
Sub-sampling
techniques and
sample
preparation
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
JORC Code explanation
•
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
•
Qualitative geological logging of rock chips and outcrops is
completed in the field.
Commentary
Mineral Resource estimation, mining studies and metallurgical •
studies.
Whether logging is qualitative or quantitative in nature. Core (or
•
costean, channel, etc) photography.
The total length and percentage of the relevant intersections
logged. If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The nature, quality and appropriateness of the assaying and
•
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
•
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
The sampling technique used to obtain rock chip samples from
outcrops manually is in line with industry standards and standard
exploration practices.
Rock chip sample data is not for use in resource in resource
estimation.
Recent assays reported in this announcement were completed as
a four-acid digest with MS determination approaching a total
digest and is an appropriate exploration approach.
Historical analyses are defined only as being ICP; digestion
methods are not specified in available data. Additional research is
required.
dy6metals.com | ASX:DY6
10
Verification of
sampling and
assaying
Location of data
points
•
The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Criteria
•
•
•
Orientation of
•
data in relation to
geological
structure
•
Sample security
Audits or reviews
Field data is collated and sent back to DY6 geological staff and/or
contractors where it is checked and verified.
•
No recent drilling is utilised on this program or reported in this
announcement.
DY6 sample points were located using handheld GPS.
•
JORC Code explanation
•
Data spacing
and distribution
•
•
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Commentary
•
No recent drilling is utilised on this program or reported in this
announcement
Whether the orientation of sampling achieves unbiased
•
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Not recorded. Core is reportedly available for inspection at Malawi
Geological Survey Head Office in Zomba.
The measures taken to ensure sample security.
•
•
Company staff collected all laboratory samples.
Contractors affiliated to the laboratory were used for the transport
of the samples to the lab.
• The results of any audits or reviews of sampling
techniques and data.
•
No audit of data has been completed to date.
dy6metals.com | ASX:DY6
11
Criteria
JORC Code explanation
Mineral tenement and
land tenure status
•
•
Exploration done by
other parties
Commentary
Type, reference name/number, location and ownership
•
including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence to
operate in the area.
• Acknowledgment and appraisal of exploration by other
parties.
The Tundulu tenure is pending grant with the relevant government
authorities and there are no known impediments to operation in
the project area.
•
•
•
•
Historical exploration is known to have been conducted by JICA
(Japanese International Cooperation Agency) from 1988-91. Full
details are being researched.
The Tundulu licence area was explored for REE during 2014/15.
Most of the known exploration data has been obtained by DY6
however further review and investigation will be required.
Small scale phosphate mining was also undertaken by unknown
parties in 2014.
A full literature search continues to be undertaken by DY6 staff
to acquire all relevant data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Geology
• Deposit type, geological setting and style of mineralisation.
•
Tundulu is a carbonatite ring complex forming part of the Chilwa
Alkaline Province in southern Malawi. The geological structure
of the Tundulu Ring Complex comprises of three igneous
centres. The first comprises a circular aureole of fenitization
about a 2 km diameter plug of syenite. The second carbonatite
ring structure centred on Nathace Hill has a diameter of 500600m. Wrench faulting prior to emplacement of the third centre
displaced the western half of the Nathace Hill ring structure
250m to the north. The third centre comprises small plugs and
thin sheets of meta-nephelinite and beforsite.
dy6metals.com | ASX:DY6
12
• No recent drilling has been undertaken on the project since 2014
Drill hole Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes: o easting and northing of the drill hole collar o
elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole o down hole length
and interception depth o hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
• No aggregation methods were used and no metal equivalents are
techniques, maximum and/or minimum grade truncations
reported.
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the
• No new mineralisation widths are being reported. Historical results
reporting of Exploration Results.
are included for context.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
as reported in this announcement.
dy6metals.com | ASX:DY6
13
Criteria
JORC Code explanation
Commentary
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Diagrams
• Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant
discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and
appropriate sectional views.
• Please see maps and diagrams included in the announcement
text, that provide locations for the claims and their location
relative to other projects in the area, with known geology from
government mapping.
Balanced reporting
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• The release is considered to be balanced and is based on current
available data for the project area
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be • The historical data currently available to the Company is known to
reported including (but not limited to): geological
be incomplete and requires further investigation.
observations; geophysical survey results; geochemical
• Attempts will be made to obtain and collate the full historical
survey results; bulk samples – size and method of
exploration data.
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Further work
The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or largescale step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
• The Company intends to continue explore the tenements initially
with a comprehensive grid-controlled rock chip sampling program
and resampling of accessible old trenches.
• Historical data will be integrated after validation.
dy6metals.com | ASX:DY6
14
Share your feedback
Discover