Completion of reconnaissance program at the Central Project
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
30 June 2025
Completion of reconnaissance program with further
natural rutile observed at the Central Rutile Project
HIGHLIGHTS
▪
Reconnaissance sampling programme has successfully been completed at the
Central Rutile Project
▪
The reconnaissance sampling programme identified visible natural rutile from
both alluvial and eluvial (residual) sources
▪
At the Bounde licence, the Company has identified a new area with large
residual natural rutile nuggets (2-4cm+). HM and residual rutile mineralisation
now observed over 100km2
▪
The identification of rutile across the entire tenement package is highly
encouraging and reaffirms the Company’s belief that the region is an emerging,
globally significant rutile province
▪
Samples collected from the reconnaissance program are being submitted for
laboratory analysis in Cape Town, South Africa, with results expected in the
September quarter
▪
Exploration at the Central Rutile Project will now move to the next phase with a
systematic soil sampling programme which will be used to rapidly identify areas
of higher-grade residual rutile mineralisation
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce the completion of
the reconnaissance exploration program at the Central Rutile Project, Cameroon. Desktop
studies incorporating detailed geological mapping, geophysics, and known mineral
occurrences, were used to define initial, high priority targets for ground-truthing. The
reconnaissance programme, which consisted of auger sampling, road-cutting channel
sampling, soil sampling and stream sediment sampling, was successful in identifying heavy
mineral (HM) and natural rutile mineralisation across all five tenements that make up the
Central Rutile project.
Rutile nuggets, ranging in size from 1mm+ to 4cm+, were observed in alluvial and eluvial
(residual) sources on all the Company’s 5 licence applications. Samples collected from the
programme are currently being prepared for dispatch to the Company’s laboratory for analysis
in Cape Town, South Africa, with results expected in August 2025.
Cautionary Statement: The visual representation of heavy mineral (HM) and rutile
mineralisation shown in this release is based on preliminary visual reconnaissance with no
sampling results. Assay results are pending and have not yet been verified through laboratory
analysis and expected in August 2025. Investors are cautioned that the information is
indicative only and should not be relied upon as a definitive measure of mineralisation or
economic potential. Further exploration and analytical testing are required to confirm the
extent, grade, and economic viability of the mineralisation
Technical Consultant, Cliff Fitzhenry, commented: “It was great to be on the ground with the
Company’s technical team over the last week to observe the incredible potential of the Central
Rutile project. The reconnaissance programme has been a great success, having identified
visual HM and rutile mineralisation across each licence. What we have uncovered at the
Bounde licence is particularly exciting. I have never seen rutile nuggets of this size before.
We have moved to planning of a regional soil sampling programme across the Central Rutile
project, which will commence shortly, and which should be completed within the next couple
of months. We’re looking forward to the commencement of the programme and believe it will
unlock areas of higher-grade residual rutile mineralisation.”
Completion of reconnaissance exploration program at the Central Rutile
Project
As announced on 5 June 2025, the Company undertook reconnaissance auger and grab
sampling programmes at the Central Rutile and Douala Basin HMS projects, Cameroon. At
the Central Rutile Project, the Company has completed a further 9 auger drill holes (refer
Figure 1), collecting 22 samples in the process, as well as collecting 44 channel samples from
8 road cutting exposures, 13 surface grab samples and 3 stream sediment samples for
analysis (refer Tables 1-4).
Table 1: Reconnaissance auger drill holes completed at the Central Rutile Project showing maximum
visual estimates of HM% from panned concentrate of the 1m samples. Refer to announcement dated
11 June 2025 – “Widespread natural rutile observed throughout the Central Rutile tenement package”.
Hole ID
Licence
Coordinate
System
Northing
Easting
EOH
(m)*
Max HM
Visual
Estimate
Comment
GRMAU0001
Nganda
UTM_32N
748546
417927
2.7
1-2%
Fine grained HM
GRMAU0004
Nsimbo
UTM_33N
430261
183191
2.25
2%
Fine grained HM
and rutile nuggets
GRMAU0006
Nsimbo
UTM_33N
431060
175252
3.0
1-2%
Fine grained HM
GRMAU0007
Bounde
UTM_32N
735144
394823
2.00
1-2%
GRMAU0008
Bounde
UTM_32N
731486
404812
2.20
0-1%
GRMAU0009
Bounde
UTM_32N
739738
402619
1.55
1-2%
Fine grained HM
GRMAU0010
Bounde
UTM_32N
747942
408286
0.80
1-2%
Fine grained HM
GRMAU0011
Bounde
UTM_32N
740474
407365
0.85
1-2%
Fine grained HM
and rutile nuggets
GRMAU0012
Bounde
UTM_32N
741038
400326
1.35
1-2%
Fine grained HM
Fine grained HM
and rutile nuggets
Fine grained and
rutile nuggets
*Note: Shallow Auger drilling is not an indication of depth of the weathering profile. Depths were limited due to time
or equipment limitations
Cautionary Statement: The visual representation of heavy mineral (HM) and rutile mineralisation shown in this
release is based on preliminary visual reconnaissance with no sampling results. Assay results are pending and
have not yet been verified through laboratory analysis and expected in August 2025. Investors are cautioned that
the information is indicative only and should not be relied upon as a definitive measure of mineralisation or
economic potential. Further exploration and analytical testing are required to confirm the extent, grade, and
economic viability of the mineralisation
Figure 1: Reconnaissance sampling (hand auger, road cutting channel and stream sediment) locations
at the Central Rutile project showing previously reported samples (refer announcement dated 11 June
2025 – “Widespread natural rutile observed throughout the Central Rutile tenement package”) and new
reported samples.
Figure 2: Hand auger drilling team preparing drill site for GRMAU0008 on the Bounde licence.
Figure 3: One meter hand auger samples laid out next to the drill site of hole GRMAU0008 within
the Bounde licence.
Figure 4: Road cutting exposure and excavated side-face from the Bounde licence within close
proximity to auger hole GRMAU0010 showing the interpreted regolith weathering profile.
Figure 5: Surface wash showing fine grained HM and rutile grains (~1-2mm) accumulating on the
ferruginous layer within the Bounde licence at GRMGRA0010. Cautionary Statement: The visual
representation of heavy mineral (HM) and rutile mineralisation shown in this release is based on
preliminary visual reconnaissance with no sampling results. Assay results are pending and have not yet
been verified through laboratory analysis and expected in August 2025. Investors are cautioned that
the information is indicative only and should not be relied upon as a definitive measure of mineralisation
or economic potential. Further exploration and analytical testing are required to confirm the extent,
grade, and economic viability of the mineralisation.
Figure 6: Fine grained HM and rutile grains and nuggets (~1-5mm) with accessory garnets, quartz and
kyanite from panned concentrate of a stream sediment sample collected from GRMST0003.
Cautionary Statement: The visual representation of heavy mineral (HM) and rutile mineralisation
shown in this release is based on preliminary visual reconnaissance with no sampling results. Assay
results are pending and have not yet been verified through laboratory analysis and expected in August
2025. Investors are cautioned that the information is indicative only and should not be relied upon as a
definitive measure of mineralisation or economic potential. Further exploration and analytical testing
are required to confirm the extent, grade, and economic viability of the mineralisation.
Figure 7: Widespread occurrences of eluvial, coarse-grained rutile were identified within the residual
regolith near a road cutting at the Bounde licence, in the vicinity of sample locations GRMAU0010 and
GRMAU0012. Cautionary Statement: The visual representation of heavy mineral (HM) and rutile
mineralisation shown in this release is based on preliminary visual reconnaissance with no sampling
results. Assay results are pending and have not yet been verified through laboratory analysis and
expected in August 2025. Investors are cautioned that the information is indicative only and should not
be relied upon as a definitive measure of mineralisation or economic potential. Further exploration and
analytical testing are required to confirm the extent, grade, and economic viability of the mineralisation.
Figure 8: Fine grained HM within a quartz matrix from panned concentrate of a 1m auger interval
sampled at GRMAU0007. Cautionary Statement: The visual representation of heavy mineral (HM)
and rutile mineralisation shown in this release is based on preliminary visual reconnaissance with no
sampling results. Assay results are pending and have not yet been verified through laboratory analysis
and expected in August 2025. Investors are cautioned that the information is indicative only and should
not be relied upon as a definitive measure of mineralisation or economic potential. Further exploration
and analytical testing are required to confirm the extent, grade, and economic viability of the
mineralisation.
Figure 9: A coarse rutile nugget (~4cm) with partial thin secondary ferricrete coating was recovered
from residual regolith comprising mainly fine-grained, iron-rich soil and clay near a road cutting at
sample site GRMAU0012. Cautionary Statement: The visual representation of heavy mineral (HM)
and rutile mineralisation shown in this release is based on preliminary visual reconnaissance with no
sampling results. Assay results are pending and have not yet been verified through laboratory analysis
and expected in August 2025. Investors are cautioned that the information is indicative only and should
not be relied upon as a definitive measure of mineralisation or economic potential. Further exploration
and analytical testing are required to confirm the extent, grade, and economic viability of the
mineralisation.
Figure 10: A selection of coarse rutile nuggets (2-5cm) recovered from residual regolith near a road
cutting at the Bounde licence, in the vicinity of sample locations GRMAU0010 and GRMAU0012.
Cautionary Statement: The visual representation of heavy mineral (HM) and rutile mineralisation
shown in this release is based on preliminary visual reconnaissance with no sampling results. Assay
results are pending and have not yet been verified through laboratory analysis and expected in August
2025. Investors are cautioned that the information is indicative only and should not be relied upon as a
definitive measure of mineralisation or economic potential. Further exploration and analytical testing
are required to confirm the extent, grade, and economic viability of the mineralisation.
Figure 11: Course rutile nuggets (1-4cm) found within residual regolith comprising fine-grained quartz
iron rich soil and clay in close proximity to GRMGRA00013. Cautionary Statement: The Company
cautions that, with respect to any visual mineralisation indicators, visual observations The visual
representation of heavy mineral (HM) and rutile mineralisation shown in this release is based on
preliminary visual reconnaissance with no sampling results. Assay results are pending and have not yet
been verified through laboratory analysis and expected in August 2025. Investors are cautioned that
the information is indicative only and should not be relied upon as a definitive measure of mineralisation
or economic potential. Further exploration and analytical testing are required to confirm the extent,
grade, and economic viability of the mineralisation.
Background on the Projects
Central
The Central Rutile Project consists of 5 exploration permits (Nganda, Bounde, Kombo, Alamba
and Nsimbo) under valid applications covering 2,140km2 across an area rapidly emerging as
a globally significant rutile province within Central Cameroon. The project area is
predominantly underlain by kyanite-bearing mica schist bedrock, which is considered the
primary source of rutile. During in-situ weathering, rutile is liberated from the bedrock and
progressively concentrated and upgraded within the overlying saprolite layer. This forms an
in-situ, eluvial saprolite hosted rutile deposit target type deposit analogous to Sovereign
Metal’s Tier 1 Kasiya deposit in Malawi (the world’s largest primary rutile deposit at 1.8 billion
tons at 1.0% rutile).
The exploration model further proposes that subsequent erosion and fluvial transport rework
these materials, concentrating rutile and other valuable heavy minerals into alluvial deposits.
Historical production figures from the area between 1935 and 1955 have recorded some
15,000 tons of high purity (>95 %) rutile being produced from artisanal mining of the alluvial
deposits around Nanga-Eboko. The Central Rutile Project borders Peak Mineral’s Minta Rutile
Project where initial sampling has revealed widespread, high-value mineral assemblages with
valuable heavy minerals (VHM) up to 93% of total heavy minerals (THM) and with the
dominant VHM’s being rutile (up to 69.8%), monazite (up to 35.6%) and zircon (up to 21.5%)
(see PUA Announcement “First systematic exploration programme discovers significant rutile
province in Cameroon” dated 4 February 2025).
Figure 12: DY6’s Central Rutile Project comprises 5 licence blocks which border Peak Mineral’s Minta
Project in Central Cameroon.
-ENDS-
This announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith
Mr John Kay
Mr Cliff Fitzhenry
Executive Chairman
Director & Company
Secretary
Technical Consultant
dan.smith@dy6metals.com
john.kay@dy6metals.com
Clifford.fitzhenry@dy6metals.com
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Central Rutile Project, is based on information compiled by Mr Richard Stockwell, a
Competent Person who is a Fellow of The Australian Institute of Geoscientists. Mr Stockwell is a
consultant to the company and has sufficient experience which is relevant to the style of mineralization
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Stockwell consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to historical exploration results at the Central Rutile
and Douala Basin projects in Cameroon, were first reported by the Company on 24 April 2025. The
Company confirms it is not aware of any new information or data that materially affects the information
included in the original announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Appendix:
Table 1: Tenement details of the Central Rutile (Gorilla Mining) and the Douala Basin Projects (Rhino Resources).
Tenement Name
Project Name
Holder
Application
Date
Area
Mungo
Douala
Rhino Resources Ltd
29/06/2022
483Km2
14/12/2022
29/06/2022
468Km
2
14/12/2022
491Km
2
N/A
484Km
2
N/A
214Km
2
N/A
440Km
2
14/12/2022
2
N/A
Mbanga
Douala
Maleke
Douala
Diwong
Douala
Mbongo
Douala
Edea Sud
Douala
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
30/01/2024
30/01/2024
30/09/2022
29/06/2022
Granted
Date
Nganda
Central
Gorilla Mining Ltd
19/02/2025
396Km
Nsimbo
Central
Gorilla Mining Ltd
19/02/2025
495Km2
N/A
Kombo
Central
Gorilla Mining Ltd
19/02/2025
460Km2
N/A
19/02/2025
425Km
2
N/A
348Km
2
N/A
Bounde
Central
Alamba
Central
Gorilla Mining Ltd
Gorilla Mining Ltd
19/02/2025
Table 2: Reconnaissance channel samples completed at the Central Rutile Project showing maximum visual
estimates of HM% from panned concentrate of the 1m samples across the channel length. Refer to announcement
dated 11 June 2025 - Widespread natural rutile observed throughout the Central Rutile tenement package.
Hole ID
Licence
Coordinate
System
Northing
Easting
Channel
Length
(m)
Max
Visual
Estimate
Comment
GRMGB0001
Nganda
UTM_32N
400512
757809
7.4
1-2% HM
Fine grained HM
GRMGB0002
Nsimbo
UTM_33N
429379
191280
3.65
1-2% HM
Fine grained HM
GRMGB0003
Nsimbo
UTM_33N
432461
179671
5.35
1-2% HM
Fine grained HM
GRMGB0004
Nsimbo
UTM_33N
431260
183043
6.4
1% HM
Fine grained HM
GRMGB0005
Alamba
UTM_33N
431949
167591
4.8
0-1% HM
Fine grained HM
GRMGB0006
Alamba
UTM_32N
439861
819510
5.8
0-1% HM
Fine grained HM
GRMGB0007
Nsimbo
UTM_33N
427676
192262
3.5
0-1% HM
Fine grained HM
GRMGB0008
Bounde
UTM_32N
747546
406551
1.4
1-2% HM
Fine grained and
with nuggets
Table 3: Reconnaissance grab samples completed at the Central Rutile Project showing maximum visual
estimates of HM% from panned concentrate. Refer to announcement dated 11 June 2025 - Widespread natural
rutile observed throughout the Central Rutile tenement package.
Hole ID
Licence
Coordinate
System
Northing
Easting
Max Visual
Estimate
Comment
GRMGRA 0001
Kombo
UTM_32N
797044
408093
5-8% HM
1-2% Rutile
Abundance of heavy mineral
with many visible rutile
grains
GRMGRA 0002
Bounde
UTM_32N
739042
407842
2-5% HM
Coarse rutile grains
GRMGRA 0003
Bounde
UTM_32N
740305
409564
4-8% HM
Coarse rutile grains
GRMGRA 0004
Bounde
UTM_32N
741844
409686
5-10% HM
Coarse rutile grains
GRMGRA 0005
Bounde
UTM_32N
746159
409681
5-10% HM
Coarse rutile grains
GRMGRA 0006
Bounde
UTM_32N
747549
406011
5-10% HM
Coarse rutile grains
GRMGRA 0007
Bounde
UTM_32N
748756
400610
5-10% HM
Coarse rutile grains
GRMGRA 0008
Bounde
UTM_32N
746124
402998
5-10% HM
Coarse rutile grains
GRMGRA 0009
Bounde
UTM_32N
741038
400326
5-10% HM
Coarse rutile grains (~1mm2cm)
GRMGRA 0010
Bounde
UTM_32N
739738
402619
5-10% HM
Sub-angular, coarse and few
rounded rutile grains (~1mm3cm)
GRMGRA 0011
Bounde
UTM_32N
747633
406180
5-10% HM
Coarse rutile grains
GRMGRA 0012
Bounde
UTM_32N
747295
407851
3-8% HM
Coarse rutile grains with
oxidised surfaces
GRMGRA 0013
Bounde
UTM_32N
747468
406375
5-0% HM
Sub-angular, coarse rutile
grains
Table 4: Reconnaissance stream sediment samples completed at the Central Rutile Project showing maximum
visual estimates of HM% from panned concentrate. Refer to announcement dated 11 June 2025 - Widespread
natural rutile observed throughout the Central Rutile tenement package.
Hole ID
Licence
Coordinate
System
Northing
Easting
Max Visual
Estimate
GMRST0001
Bounde
UTM_32N
740998
407024
5-8% HM
3-5% Rutile
GMRST0002
Kombo
UTM_32N
800862
425529
5-7% HM
1-2% Rutile
GMRST0003
Bounde
UTM_32N
739907
407308
5-10% HM
2-5% Rutile
Comment
Abundance of visible rutile
grains (2-7mm) fine to medium,
angular in shape
Visible rutile, subangular in
shape, fine to medium grain
size
Visible rutile, subangular in
shape, fine to medium grain
size
Cautionary Statement:
The visual representation of heavy mineral (HM) and rutile mineralisation shown in this release is based on
preliminary visual reconnaissance with no sampling results. Assay results are pending and have not yet been
verified through laboratory analysis and expected in August 2025. Investors are cautioned that the information is
indicative only and should not be relied upon as a definitive measure of mineralisation or economic potential.
Further exploration and analytical testing are required to confirm the extent, grade, and economic viability of the
mineralisation.
JORC Code, 2012 Edition – Table 1 report
Section 1: Sampling Techniques and Data
Criteria
Sampling Techniques
JORC Code explanation
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Commentary
Grab samples
•
Grab samples were collected within the tenement. The grab samples can be
subjected to bias.
•
Industry-standard practice was used in the processing of samples for assay
Auger Drilling
•
Samples collected using a manual hand auger with a 75 mm and 100mm
diameter bit.
•
Drilling targeted coastline dune deposits
•
Samples taken at regular 1 m intervals downhole from surface (maximum ~9 m).
•
No lithological (horizons) were crossed in sampling.
•
Industry-standard practice was used in the processing of samples for assay.
Channel sampling
•
Channel samples were collected along exposed road cuttings and in the filed
•
Channels were cleared of loose debris, weathered material, and vegetation prior
to sampling.
•
Samples collected at consistent 1 m intervals
•
No lithological (horizons) were crossed while sampling
•
Industry-standard practice was used in the processing of samples for assay.
Stream sediment sampling
•
Sediment samples were collected from active high and low stream channels.
•
Targeted locations included inner bends, sediment traps
•
~1 kg of sediment collected using a shovel or trowel.
•
Coarse clasts and organic matter were removed
•
Industry-standard practice was used in the processing of samples for assay
Previous releases
Refer to announcement dated 11 June 2025 - Widespread natural rutile observed
throughout the Central Rutile tenement package, for previous sample locations and
information related to this release regarding auger, channel, soil, grab and stream
sediment sampling
Cautionary statement.
The visual representation of heavy mineral (HM) and rutile mineralisation shown in
this release is based on preliminary visual reconnaissance with no sampling results.
Assay results are pending and have not yet been verified through laboratory analysis
and expected in August 2025. Investors are cautioned that the information is
indicative only and should not be relied upon as a definitive measure of
mineralisation or economic potential. Further exploration and analytical testing are
required to confirm the extent, grade, and economic viability of the mineralisation.
dy6metals.com | ASX:DY6
14
Drilling techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face- sampling bit or other type,
whether core is oriented and if so, by what method, etc)
Auger drilling
•
Vertical hand auger drilling conducted using a manually rotated auger with
75 mm and 100mm diameter bit.
•
Drilling continued until blade refusal.
•
Maximum hole depth varied by terrain (generally <9 m).
•
No drilling fluids, casing, or downhole equipment used.
•
Drilling suitable for near-surface geochemical sampling.
Drill sample recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Auger Drilling
•
Hand auger drilling does not provide continuous core; recovery is based on
volume retrieved per 1m interval.
•
Sample quality and recovery were monitored in the field and deemed
acceptable; any compromised samples were noted and excluded if necessary.
•
No specific measures (e.g., twin holes, weights, or drilling additives) were used
to improve recovery, as hand auger is a basic geochemical technique.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Grab samples
•
Sample information was recorded at the time of sampling included colour,
lithology, texture, alteration, moisture and mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
Auger Drilling
•
Sample information was recorded at the time of sampling included colour,
lithology, texture, alteration, moisture and mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
Channel sampling
•
Sample information was recorded at the time of sampling included colour,
lithology, texture, alteration, moisture and mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
Stream sediment sampling
•
Sample information was recorded at the time of sampling included, colour,
lithology, texture, stream location and mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
dy6metals.com | ASX:DY6
15
Sub- sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
Auger, Channel, Streams and Grab samples were panned in the field
•
Material was manually panned in the field to produce a heavy mineral
concentrate (~200g).
•
Panning aimed to concentrate rutile and other heavy minerals for visible
assessment
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for field
duplicate/second-half sampling.
Quality of assay data and
laboratory tests
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
•
•
Not applicable in this release
Assays pending
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established
Verification of sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
•
•
•
•
No third-party verification recorded.
No twinned boreholes were drilled.
Not recorded in the documentation provided to the consultant.
No adjustments to data have been recorded.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Location of data points
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Auger, Channel, Grab and stream sediment sampling
•
Hand-held Garmin G65S GPS.
•
UTM WGS84 Sector 32N.
•
UTM WGS84 Sector 33N.
Specification of the grid system used.
Quality and adequacy of topographic control
dy6metals.com | ASX:DY6
16
Data spacing an
Share your feedback