Quarterly Activities Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
21 July 2025
Quarterly Activities Report
for the period ended 30 June 2025
Acquisition of highly prospective Rutile & HMS projects in Cameroon (includes matters
subsequent to 30 June 2025 Quarter)
•
Acquisition of 100% of 7,554km2 of licences in Cameroon, making up the Douala Basin and
Central Rutile Projects, both highly prospective for Rutile and Heavy Mineral Sands (HMS)
(note this includes acquisition of the Weaver project announced post-30 June 2025).
•
The Central Rutile Project covers an area of 4,974km2 and is contiguous to Peak Minerals’
(ASX:PUA) Minta Rutile Project.
•
Since April the Company has undertaken a series of targeted reconnaissance sampling
programs on both the Central Rutile and Douala Basin Projects identifying visible natural rutile
from both alluvial and eluvial (residual) sources.
•
Systematic soil sampling program underway to identify areas of higher-grade residual rutile
mineralisation.
•
Auger drill program underway at the northern boundary of the Company’s Alamba and Nsimbo
licences, abutting Peak Minerals’ Minta Project.
•
Assay results and mineral assemblage testwork from the recently completed reconnaissance
programs expected by mid-August.
•
Completion of the initial acquisition of the Doula Basin and Central Projects occurred during
the June quarter with completion of the additional Central Project licences (Weaver project)
occurring on 18 July 2025.
High Grade Gallium at Tundulu Project
•
In addition to high-grade rare earths and phosphate, a review of historical drill results at
Tundulu identified the presence of high-grade gallium (Ga) mineralisation from surface
•
Significant intercepts include:
o
74m at 93.26g/t Ga2O3, 1.56% TREO from 72m, including 14m at 202.79g/t Ga2O3
from 89m (TU043), and the highest grade in all assays intersected within this
interval at 310.46 g/t Ga2O3, 5.68% TREO from 97m to 98m
o
53m at 72.79g/t Ga2O3, 1.02% TREO from surface, including 12m at 145.07g/t
Ga2O3 from 25m (TU011)
o
30m at 94.63g/t Ga2O3, 4.03% TREO from surface (TU014)
o
41m at 64.98g/t Ga2O3, 1.61% TREO from 67m, including 8m at 178.94g/t Ga2O3
from 100m (TU033)
o
25m at 64.63g/t Ga2O3, 1.03% TREO from 45m, including 9m at 81.85g/t Ga2O3
from 61m (TU008)
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
•
Only ~40% of the highly prospective area has ever been drill-tested. The target areas
include Nathace and Tundulu hills
•
Gallium mineralisation is open at depth (Figure 4). Though some of the elevated Ga2O3
responses occur within the saprolite clays (TU014: 0-30m; 30m @ 94.63ppm Ga2O3),
others occur at depth within fresh rock (TU043: 72-146m; 74m @ 93.26ppm) or TU043: 89103m; 14m @ 202.79ppm Ga2O3. Deeper gallium potential has not yet been assayed for.
Executive Chairman Appointment
•
Mr Daniel Smith appointed Executive Chairman (transitioning from the role of Non-Executive
Chairman).
R&D Rebate
•
Receipt of A$261,459 research and development (R&D) rebate for expenditure on the
Company’s Machinga HREE project and its Tundulu REE and Phosphate project.
Matters subsequent to the June 2025 Quarter
Capital Raising
•
Subsequent to the June 2025 quarter, the Company has received firm commitments to raise
A$4.625m at an issue price of $0.30 per share (Capital Raising). Euroz Hartleys Limited and
Evolution Capital Pty Ltd acted as Joint Lead Managers to the Capital Raising.
•
Initial tranche of the Capital Raising expected to complete on Tuesday 22 July 2025 (14.6m
shares), with director participation (816,667 shares) and Joint Lead Manager options
(21,900,000) subject to shareholder approval, scheduled for a shareholder meeting to be held
in late August 2025.
•
Proceeds will accelerate exploration at the Company’s Central Rutile Project and Douala Basin
HMS Project in Cameroon.
CEO Appointment
•
Appointment of leading rutile industry executive, Cliff Fitzhenry to CEO, transitioning from the
role of Technical Consultant
Critical metals explorer DY6 Metals Ltd (ASX: DY6) (“DY6”, “the Company”) is pleased to present its
quarterly activities report for the June 2025 quarter.
OPERATIONS
Cameroon - Central Rutile and Douala Basin Projects
With the acquisition of the six Weaver licence applications, the newly expanded Central Rutile Project
now includes a total of 11 exploration licences under application covering a total landholding of
4,974km2. This project is predominantly underlain by the same kyanite-bearing mica schist unit which
is interpreted to be the primary source of the rutile in this region. The Central Cameroon area has long
been known to contain rutile with historical production of high purity (>95 %) rutile recorded from
artisanal mining of the alluvial deposits around Nanga-Eboko between 1935 and 1955.
Recent studies have highlighted the similarities of the region to the Lilongwe Plain of Central Malawi
where Sovereign Metals is busy developing the Tier 1 Kasiya Project, which is currently noted as the
world largest primary rutile deposit with a resource of 1.8 billion tons at 1.0% rutile. Similar to Kasiya,
dy6metals.com | ASX:DY6
2
the Central Cameroon region has the same high grade metamorphic bed rock geology, in the form of a
kyanite-bearing mica schist, as well as a deep in-situ saprolitic weathering profile. These factors make
this region highly prospective for residual, in-situ, saprolite hosted natural rutile deposits, analogous to
Kasiya.
Figure 1: Map of Central Cameroon showing DY6’s newly acquired six Weaver licences to the south-east which
will be incorporated into the Central Rutile Project together with the company’s original 5 licences.
Figure 2: Regional geological map of Central Cameroon showing DY6’s Central Rutile Project, along with Peak
Minerals’ Minta Project, both underlain by a sequence of high-grade paragneisses and schists.
dy6metals.com | ASX:DY6
3
Malawi - Tundulu Project (REE, Phosphate and Gallium)
During the quarter the Company announced that a review of historical drilling at the Tundulu Rare Earth
and Phosphate project, Malawi, uncovering high-grade gallium mineralisation from surface.
Figure 3: Tundulu Project Location Map and Historical Drill Hole locations over Nathace Hill
Significant intercepts include:
•
74m at 93.26g/t Ga2O3, 1.56% TREO from 72m, including 14m at 202.79g/t Ga2O3 from 89m (TU043),
and the highest grade in all assays intersected within this interval at 310.46 g/t Ga2O3, 5.68% TREO from
97m to 98m
•
53m at 72.79g/t Ga2O3, 1.02% TREO from surface, including 12m at 145.07g/t Ga2O3 from 25m (TU011)
•
30m at 94.63g/t Ga2O3, 4.03% TREO from surface (TU014)
dy6metals.com | ASX:DY6
4
•
41m at 64.98g/t Ga2O3, 1.61% TREO from 67m, including 8m at 178.94g/t Ga2O3 from 100m (TU033)
•
25m at 64.63g/t Ga2O3, 1.03% TREO from 45m, including 9m at 81.85g/t Ga2O3 from 61m (TU008)
Only ~40% of the highly prospective area has ever been drill-tested. The target areas include Nathace
and Tundulu hills (Figures 1 & 2). Gallium mineralisation is open at depth. Though some of the elevated
Ga2O3 responses occur within the saprolite clays (TU014: 0-30m; 30m @ 94.63ppm Ga2O3), others
occur at depth within fresh rock (TU043: 72-146m; 74m @ 93.26ppm) or TU043: 89-103m; 14m @
202.79ppm Ga2O3. Deeper gallium potential has not yet been assayed for.
Historical diamond and RC drilling, conducted during 2014 by Mota Engil Minerals & Mining was
assayed for gallium. A total of 4901 assays for gallium were completed with 27.7% of the assays
containing >40 g/t Ga2O3. Samples from drillholes JMT01 to JMT024 from previous drilling by
Japanese International Cooperation Agency (JICA) in 1980 were not analysed for Gallium.
Significant intersections have been calculated from the significant TREO intersections of grade of
>5,000ppm over 5 metres in DY6 announcement of 27th May 2024, and the Ga2O3 results in conjunction
with the TREO intersections are set out in Appendix 1 of the Company’s announcement “Updated
Announcement - High Grade Gallium Potential” dated 1 May 2025.
Figure 4: Gallium assayed and non-assayed Historical Drill Hole locations
dy6metals.com | ASX:DY6
5
As announced 17 October 2024, DY6 has commissioned preliminary metallurgical testwork to be
undertaken on a select bulk sample from Tundulu to determine the suitability of the Tundulu deposit to
produce a separate rare earth and phosphate concentrate, which is being undertaken by Auralia
Metallurgy in Perth. Further testwork is ongoing and will be announced in due course.
Malawi - Mzimba/Machinga/Ngala Hill/Karonga & Salambidwe
No substantive work was conducted on these Projects during the quarter.
Figure 5: Location of the Company’s Projects in Malawi
dy6metals.com | ASX:DY6
6
Corporate
Acquisitions - Cameroon Rutile & HMS Projects
As referred to above, the Company entered into binding agreements to acquire 100% of highly
prospective rutile and HMS projects in Cameroon. Full terms of the agreements are set out in the
following ASX announcements: “Highly Prospective Rutile & HMS Project Acquisition” dated 24 April
2025 and “Significant expansion to Central Rutile Project” dated 8 July 2025.
Board and Management Appointments
As part of the acquisition of the Cameroon projects, Daniel Smith was appointed Executive Chairman
(transitioning from the role of Non-Executive Chairman, and subsequent to the June Quarter, Mr Cliff
Fitzhenry was appointed as the Company’s Chief Executive Officer (transitioning from the role of
Cameroon Technical Consultant).
R&D Rebate
During the quarter, the Company received A$261,459 from the Australian Taxation Office as a research
and development (R&D) rebate for expenditure on the Company’s Machinga and Tundulu projects for
the 2024 financial year period.
Securities
During the quarter, the Company issued:
•
10,000,000 shares at $0.04 per share as part of a share placement to new and existing
shareholders as part of the initial Cameroon rutile and HMS acquisition;
•
5,000,000 shares and 15,000,000 performance rights to the vendors subject to various
milestones on settlement of the initial Cameroon rutile and HMS projects;
•
962,500 shares to certain option holders upon the exercise of 962,500 options exercisable at
$0.08 per share;
•
1,175,000 Performance Rights to employees of the Company (being 800,000 Performance
Rights to Senior Exploration Geologist Troth Saindi, and 375,000 Performance Rights to chief
financial officer Michelle Sung) subject to various milestones pursuant to the Company’s
Employee Incentive Plan; and
•
8,000,000 performance rights to the Directors subject to various milestones pursuant to the
Company’s Employee Incentive Plan.
Subsequent to the quarter end, the Company issued 181,187 shares to certain option holders upon the
exercise of 181,187 options exercisable at $0.08 per share and 2,000,000 shares to the vendors on
completion of the acquisition of the additional Cameroon Projects (Weaver Projects).
In addition to the above, during the quarter the Company released a total of 8,089,167 shares from
escrow.
dy6metals.com | ASX:DY6
7
Shareholder Meeting
A meeting of shareholders was convened on 11 June 2025 to consider approval to issue consideration
securities to the vendors of the Cameroon rutile and HMS transaction and issue of performance rights
to directors. All resolutions were passed by poll.
Finance and Use of Funds
Pursuant to ASX Listing Rule 5.3.4, the Company provides a comparison of its actual expenditure
against the estimated expenditure on items set out in Section 1.6 of the Company’s IPO prospectus.
The analysis below reflects the period from 1 June 2023 to 30 June 2025:
Activity Description
Exploration –
Machinga (2 years)
Exploration –
Salambidwe (2 years)
Exploration – Ngala
Hill (2 years)
Administration (2
years)
Working Capital (2
years)
New Project
Evaluation
Expenses of the
Offer1
TOTAL
Prospectus
Actual (from 1 June
23 to 30 June 25)
Variance
$2,450,000
$2,455,897
($5,897)
$1,000,000
$199,336
$800,664
$475,000
$57,418
$417,582
$750,000
$1,143,809
($393,809)
$1,565,000
$822,638
$742,362
$800,000
$505,270
$294,730
$665,000
$441,260
$223,740
$7,705,000
$5,625,628
$2,079,372
1Note: certain expenses of the Offer as part of the Company’s IPO were also paid out prior to 1 June
2023 and therefore not accounted for in the above table.
In respect of the variances above, the Company provides the following commentary: since listing the Company has
applied for additional licence areas in Malawi being Tundulu, Karonga and Mzimba to complement its existing
project portfolio. The Company’s predominate focus in Malawi has been advancing exploration at the Machinga
project and progressing the Tundulu project.
Summary of Mining Exploration Activities Expenditure
During the June quarter, the Company made the following payments in relation to mining exploration
activities:
-
Title management and other consultants: $14,520
-
Mapping and sampling: $3,075
-
Drilling and assaying: $13,675
-
Field supplies, vehicles, travel and other: $47,872
-
New project expenditures: $457,544
Appendix 5B Disclosures
At 30 June 2025, the Company had cash on hand of approximately $1.51m.
dy6metals.com | ASX:DY6
8
As announced on 14 July 2025, the Company has received firm commitments to raise $4.625m as part
of a Capital Raising. Settlement of the first tranche ($4,380,000) is scheduled to occur on 22 July 2025
with the remaining $245,000 from director participation subject to shareholder approval in late August
2025.
Note 6 to Appendix 5B:
Payments to related parties of the entity and their associates: during the June quarter a total of $86,344
was paid to Directors and associates for director, company secretarial, accounting and consulting fees.
New Opportunities
The Company continues to evaluate new project opportunities that may complement its existing
portfolio.
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith
Mr Clifford Fitzhenry
Executive Chairman
CEO
dan.smith@dy6metals.com
clifford.fitzhenry@dy6metals.com
Abbreviations
HMS = heavy mineral sands
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3,
Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO% = HREO/TREO * 100
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
MREE=Nd, Pr, Dy, Tb
P = Phosphorus
P2O5 = Phosphorus pentoxide
dy6metals.com | ASX:DY6
9
Competent Person Statement – Cameroon Projects
The information contained in this announcement that relates to geological information and exploration
results at the Central Rutile and Douala Basin Projects, is based on information compiled by Mr Clifford
Fitzhenry, a Competent Person who is a Registered Professional Natural Scientist with the Council for
Natural Scientific Professionals (SACNASP). Mr Fitzhenry is the Company’s CEO and has sufficient
experience which is relevant to the style of mineralization and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Fitzhenry consents to the inclusion in this announcement of the matters based on his information in
the form and context in which it appears.
For further information with respect to exploration results during the June quarter (and matters
subsequent to the 30 June quarter), please refer to ASX announcements:
•
“Highly Prospective Rutile & HMS Project Acquisition” dated 24 April 2025;
•
“DY6 to commence exploration in Cameroon” dated 14 May 2025;
•
“Reconnaissance exploration underway in Cameroon” dated 5 June 2025;
•
“Widespread natural rutile observed at Central Rutile Project” dated 11 June 2025
•
“Completion of Cameroon HMS & Rutile Transaction” dated 13 June 2025;
•
“Thick zones of HM mineralisation observed across Douala” dated 23 June 2025;
•
“Completion of reconnaissance program at the Central Project” dated 30 June 2025;
•
“Significant expansion to Central Rutile Project” dated 8 July 2025;
•
“Reconnaisance Programme Extended at Central Project” dated 10 July 2025; and
•
“Soil Sampling Campaign Commences at Central Project” dated 11 July 2025.
Competent Persons Statement – Malawi Projects
The information in this report that relates to exploration results, mineral resources or ore reserves in
relation to the Company’s Malawi based projects is based on information compiled by Mr Allan Younger,
who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Younger is a consultant of
the Company. Mr Younger has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity that he is undertaking to qualify as a Competent
Person as defined in the 2012 edition of the `Australian Code for Reporting Exploration Results, Mineral
Resources and Ore Reserves’ (the JORC Code). Mr Younger consents to the inclusion of this
information in the form and context in which it appears in this report. Mr Younger holds shares in the
Company.
For further information with respect to exploration results during the June quarter, please refer to ASX
announcement “Updated Announcement - High Grade Gallium Potential” dated 1 May 2025.
Cautionary Statement
The Company cautions that, with respect to any visual mineralisation indicators, visual observations
and estimates of mineral abundance and uncertain in nature and should not be taken as a substitute or
proxy for appropriate laboratory analysis. Visual estimates also potentially provide no information
regarding impurities or deleterious physical properties relevant to valuations. Assay results from the
drilling and sampling programmes will be required to understand the grade and extent of mineralisation.
dy6metals.com | ASX:DY6
10
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
dy6metals.com | ASX:DY6
11
Annexure 1. Tenements held directly by DY6 Metals Ltd or subsidiary companies as at 30 June 2025:
Malawi:
Granted
Acquired
during
quarter
-
Disposed
of during
quarter
-
Held at
end of
quarter
100%
EPL0705
Granted
-
-
100%
EPL0518
Granted
-
-
100%
Ngala Hill
EPL0510
Granted
-
-
100%
Tundulu
EL0731
Granted
-
-
100%
Mzimba (West)
EL0784
Granted
-
-
100%
Mzimba (Central)
EL0732
Granted
-
-
100%
Mzimba (South)
EL0783
Granted
-
-
100%
Karonga
EL0782/24
Granted
-
-
100%
Disposed of
during
quarter
-
Held at
end of
quarter
100%
Project
Tenement
Details
Status
Machinga (Main)
EPL0529
Machinga (Extended
Area)
Salambidwe
Cameroon:
Project
Tenement
Name
Status
Douala
Mungo
Granted
Acquired
during
quarter
100%
Douala
Mbanga
Granted
100%
-
100%
Douala
Maleke
Application
100%
-
100%
Douala
Diwong
Application
100%
-
100%
Douala
Mbongo
Application
100%
-
100%
Douala
Edea Sud
Granted
100%
-
100%
Central
Nganda
Application
100%
-
100%
Central
Nsimbo
Application
100%
-
100%
Central
Kombo
Application
100%
-
100%
Central
Bounde
Application
100%
-
100%
Central
Alamba
Application
100%
-
100%
Central
Awae
Application
100%
-
100%
Central
Ayene II
Application
100%
-
100%
Central
Assi
Application
100%
-
100%
Central
Bissoua _II
Application
100%
-
100%
Central
Soleye
Application
100%
-
100%
Central
Soleye_W
Application
100%
-
100%
dy6metals.com | ASX:DY6
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
DY6 Metals Limited
ABN
Quarter ended (“current quarter”)
91 663 592 318
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(281)
(804)
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
1
23
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
261
261
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(19)
(520)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(116)
(116)
(b) tenements
-
-
(c) property, plant and equipment
-
-
(427)
(1,073)
(e) investments
-
-
(f)
-
-
(a) entities
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(543)
(1,189)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
404
609
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
73
73
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(20)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(23)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
477
639
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,598
2,584
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(19)
(520)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(543)
(1,189)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
477
639
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
1,513
1,513
Current quarter
$A’000
Previous quarter
$A’000
1,513
1,598
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,513
1,598
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Current quarter
$A'000
86
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
-
Director/company secretarial fees/accounting/consulting fees $86,344.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(19)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(427)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(446)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,513
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,513
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.39
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
21 July 2025
The board of directors
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corpora
Share your feedback
Discover