Quarterly Activities Report
Released
Released
Announcement PDF
ASX Announcement
30 January 2026
Quarterly Update Report
For the period ending 31 December 2025
Highlights
Expansion and exploration advancement of Cameroon Portfolio
• Kasiya-style flake graphite confirmed with dual-commodity advantage emerging:
Confirmed graphite mineralisation highlighting a compelling rutile–graphite system, with
results including 2m @ 0.48% TGC, including 1m @ 0.60%, with multiple thick rutile zones
intersected from surface, including 11m @ 0.49% rutile, including 4m @ 0.63% and 1m @
0.88%.
• Ongoing follow-up exploration: Systematic soil sampling and targeted hand-auger drilling
at Bounde and Nganda to delineate deeper, higher-grade rutile and graphite zones with 608
soil samples collected.
• Strategic expansion: Completed acquisition of the Yaoundé West Rutile tenements,
expanding the Central Rutile Project to ~8,782 km² covering highly prospective geology and
areas of historic residual rutile mining.
• Licensing progress: All required documentation has been submitted, with applications now
awaiting review by the inter-Ministerial technical committee.
Strategic review of Malawi Portfolio and further high-grade results
• Initiated a strategic review to assess value‑realisation options for Tusker’s Malawi rare
earth portfolio.
• Further high-grade results:
o Tundulu’s Nathace Hill surface sampling extended high‑grade gallium mineralisation,
returning values up to 82 g/t Ga₂O₃ alongside strong REE, phosphate and niobium
results.
o Machinga Project surface sampling with 116 rock‑chip and soil samples has confirmed
gallium as a significant high‑value addition to existing HREE and niobium mineralisation,
with high‑grade results up to 75.28 g/t Ga₂O₃.
Corporate Transformation
• Shareholders approved the Company’s name change from DY6 Metals to Tusker Minerals,
marking its evolution into a leading African‑focused explorer with a growing portfolio of critical
mineral assets in Cameroon and Malawi.
• Set-up of a Cameroon office, supporting expanded in-country activities alongside
recruitment and training of a strong Cameroonian workforce.
• Construction of a purpose-built heavy-mineral sands laboratory in Yaoundé, scheduled
for commissioning in early 2026.
• Quarter-end cash position: $2.20m
• Engage with this announcement at the Tusker Minerals Investor Hub.
Tusker Minerals Ltd (ASX: TSK, ‘Tusker’ or ‘Company’) has released the 31 December 2025
Quarterly Update providing an overview of the progress during the quarter and post quarter end.
Chief Executive Officer, Cliff Fitzhenry, commented:
“Tusker’s momentum in Cameroon continues to accelerate, and the work completed over the
December quarter has further strengthened our confidence in the scale and quality of the Central
Rutile Project. Completing over 600 soil samples across the project area marks a major milestone for
the Company, delivering our first robust dataset to support targeted drilling.
Our hand‑auger programme at Bounde and Nganda is also performing extremely well. This is
allowing us to systematically test the extensive 70 × 15 km BRGM‑mapped rutile corridor for the first
time using modern techniques, and we are very encouraged by the operational performance to date.
Importantly, we have now established a in country presence in Cameroon. The rapid build‑out of our
local workforce, the establishment of our corporate office, and establishing our purpose‑built
heavy‑mineral sands laboratory in Yaoundé represent transformational steps for Tusker. Once
commissioned in early 2026, this laboratory will materially reduce assay costs and turnaround times,
enabling large‑scale, continuous exploration with far greater efficiency and control.
With the licensing process progressing although delayed and a substantial 2026 exploration
programme in planning, Tusker is positioning itself as a leading critical minerals explorer in
Cameroon. We look forward to updating shareholders as soil results and hand‑auger assays become
available during the March quarter.”
Operational Overview
Cameroon Portfolio
Central Rutile Project and Doula Basin
Tusker has made significant progress across both Central Rutile and the Doula Basic Projects with
exploration advancing alongside expanded tenements.
The Company successfully completed its project-wide soil sampling programme across the Central
Rutile Project, collecting 608 samples. All samples have been processed and are currently undergoing
p-XRF analysis at the Company’s new heavy-mineral sands laboratory in Yaoundé.
This dataset will form the first systematic geochemical framework for the project, enabling the Company
to delineate higher-grade rutile zones for follow-up drilling.
The ongoing hand-auger drilling programme across the Bounde and Nganda licences is progressing
well. The auger drilling has been achieving targeted depths of 12–16m, aided by Tusker’s heavy-duty
tungsten-carbide reinforced equipment and skilled in-house team.
The programme is systematically testing the historic BRGM-mapped 70 × 15 km high-grade residual
rutile corridor, representing the first modern evaluation of this highly prospective zone.
Figure 1. Map of Cameroon showing Tusker Mineral’s Central Rutile Project in green, and the Douala
Basin Project in blue, encompassing +11,000km2
of highly prospective tenure.
Figure 2. Map of the Central Rutile Project showing the completed soil sampling to date.
Figure 3. Geological map showing the hand-auger drill programme currently in progress at the
Bounde and Nganda licences targeting the historic BRGM mapped residual rutile corridor.
Figure 4. Tusker Minerals hand auger drilling activities showing sample collection process.
Cautionary Statement: The images shown are for illustrative purposes only, depicting auger drilling and sampling techniques. This is not indicative of any
mineralisation, resources or reserves, and should not be relied upon as a measure of economic potential. Assay results from the drilling and sampling
programmes will be required to understand the grade and extent of mineralisation. Initial assay results are expected in Q1 2026.
Malawi Portfolio
In mid-October, Tusker Minerals confirmed a strategic review to explore potential value realisation
pathways for its Malawi rare earth portfolio. To assist the company with this process, Tusker secured
the services of a consultant with deep sector knowledge and networks.
The review comes at a pivotal time for the critical minerals sector with continued newsflow on the back
of an announced Australia–U.S. strategic partnership covering rare earths and critical minerals as well
as due to the growing geopolitical importance of securing diversified, non-China supply chains.
Figure 5. Malawi Portfolio Overview.
Malawi - Tundulu Project (REE, Phosphate and Gallium)
The Tundulu project, located in southern Malawi, is a large, alkaline intrusive complex hosting rare
earths, phosphate and gallium mineralisation. Gallium was recently recognised as a key commodity
following a review of historical drilling data.
The latest sampling programme focused on expanding the understanding of surface mineralisation
across Nathace Hill, with particular emphasis on areas that remained largely untested. Samples were
collected at 50–100m intervals along north–south lines spaced 50m apart, targeting approximately 60%
of the project area that has not previously been systematically sampled or drill tested.
Results confirm that high-grade gallium mineralisation is continuous across the entirety of Nathace Hill,
significantly extending the known mineralised system beyond previously identified zones. The strong
association with REE, phosphate and niobium further supports the interpretation of a large, robust and
multi-commodity mineral system.
Figure 6. Tundulu Project Location Map and Historical Drill Hole locations over Nathace Hill.
Malawi - Mzimba/Machinga/Ngala Hill/Karonga & Salambidwe
The Machinga Project hosts heavy rare earth, niobium and zirconium mineralisation. This recent soil
and rock-chip sampling was designed to test the continuity of mineralisation and assess a large 2.7km-
long radiometric anomaly approximately 3km southeast of previous drilling (Figure 7).
A total of 116 samples were collected which included 77 rock chips and 39 soil samples at a sample
grid of 400m by 200m (Figure 12).
Sampling was completed on a 400m by 200m grid, returning strong gallium results alongside
encouraging REE and niobium values. The identification of gallium within the radiometric anomaly adds
a new layer of value and exploration optionality to the project
Figure 7. Machinga Project Location Map showing U Radiometric Anomalies & historical Geochem
anomalies.
Figure 8: Map of the sampled Nathace Hill (Tundulu Project) showing the sample locations and high-
grade results.
Figure 9: Map showing the surface distribution of wide-spread Gallium mineralisation at Nathace Hill,
Tundulu Project.
Figure 10. Map showing the surface distribution of Phosphate mineralisation at Nathace Hill, Tundulu
Project.
Figure 11. Map showing the surface distribution of Gallium mineralisation at the Machinga Project.
Figure 12. Map of the Machinga Project showing planned & sampled locations across the large U radiometric
anomaly that has returned up to 0.79% TREO.
Key Planned Milestones
Tusker outlines the following key upcoming milestones for investors.
Tenement Schedule
This section is provided in compliance with ASX Listing Rule 5.3. Please refer to Annexure 1 for a
complete list of tenements currently held by the Company.
Changes in Tenements held during the Quarter:
Tenement
Interest at
quarter start
Change in
quarter
Interest at
quarter end
Country
Matomb NIL Acquired 100% Cameroon
Makak NIL Acquired 100% Cameroon
Mapan NIL Acquired 100% Cameroon
Lobo NIL Acquired 100% Cameroon
Lipombe NIL Acquired 100% Cameroon
Dibang NIL Acquired 100% Cameroon
Ekoundindi NIL Acquired 100% Cameroon
Corporate
During the quarter, Tusker advanced several key corporate and operational initiatives that have
strengthened the Company’s profile and position for growth. The Company officially adopted its new
name, Tusker Minerals, following shareholder approval at the Annual General Meeting, reflecting its
broader strategic focus. Additionally, it launched a refreshed Investor Hub to enhance transparency,
accessibility, and engagement with shareholders.
Operationally, the Company continued to establish a robust foundation in Cameroon, including the
recruitment and training of a highly capable Cameroonian workforce, and the construction of a
purpose-built heavy-mineral sands laboratory in Yaoundé, which remains on track for commissioning
in early 2026. This laboratory will play a critical role in supporting continuous exploration and materially
reducing reliance on external assay providers. Tusker’s investments in in-house drilling capacity,
technical expertise, and local infrastructure ensure the Company is well positioned for accelerated,
cost-efficient exploration throughout 2026.
Together, these initiatives have strengthened shareholder engagement, broadened market visibility,
and reinforced Tusker’s long-term growth strategy while laying the groundwork for a transformative year
ahead.
As part of completion of the Yaounde West transaction, the Company issued 5m ordinary shares and
10m performance rights to the vendors. Refer to the Company’s announcement dated 31 December
2025 for further information.
Cash at the end of the quarter ~A$2.2 million.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, the Company reports that there was A$0.96 million in direct
exploration expenditure incurred during the December 2025 quarter.
Note 6 of Appendix 5B
Payments to related parties of the entity and their associates: during the December 2025 quarter
A$96,577 was paid to directors and associates for director, consulting, company secretarial and
accounting fees. The Company continues to evaluate new project opportunities that may complement
its existing portfolio.
-ENDS-
This announcement has been authorised by the Board of Tusker Minerals.
More information
Mr Daniel Smith Mr Cliff Fitzhenry Jessica Fertig
Executive Chairman Chief Executive Officer Media and Investor Relations
dan@tuskerminerals.com cliff@tuskerminerals.com jessica@taumedia.com.au
About Tusker Minerals
Tusker Minerals is an African-focused explorer advancing a world-class portfolio of critical mineral
assets across Cameroon & Malawi. Tusker’ projects include the Central Rutile Project and Douala Basin
HMS Project in Cameroon and the Tundulu, Machinga, and Salambidwe REE Projects in Malawi.
Competent Person Statement
The exploration results contained in this report were reported by the Company in its ASX announcements made
on 25/11/25, 15/12/25 and 19/12/25 that contained a Competent Person Statement.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the above original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking statements, opinions
and estimates are only predictions and are subject to risks, uncertainties and assumptions which are outside the
control of Tusker Minerals. Past performance is not necessarily a guide to future performance and no
representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking
statements, opinions or estimates. Actual values, results or events may be materially different to those expressed
or implied in this announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements, opinions or
estimates. Any forward-looking statements, opinions or estimates in this announcement speak only at the date of
issue of this announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules,
Tusker Minerals does not undertake any obligation to update or revise any information or any of the forward-
looking statements, opinions or estimates in this announcement or any changes in events, conditions or
circumstances on which any such disclosures are based.
Annexure – Tenements
In accordance with Listing Rule 5.3.3, TSK advises the details of the tenements currently held by the Company
or its subsidiaries as at 31 December 2025.
Cameroon:
Tenement
Name
Project Name Holder Application
Date
Area Granted
Date
Mungo Douala Rhino Resources Ltd 29/06/2022 483km2 14/12/2022
Mbanga Douala Rhino Resources Ltd 29/06/2022 468km2 14/12/2022
Maleke Douala Rhino Resources Ltd 30/01/2024 491km2 N/A
Diwong Douala Rhino Resources Ltd 30/01/2024 484km2 N/A
Mbongo Douala Rhino Resources Ltd 30/09/2022 214km2 N/A
Edea Sud Douala Rhino Resources Ltd 29/06/2022 440km2 14/12/2022
Nganda Central Gorilla Mining Ltd 19/02/2025 396km2 N/A
Nsimbo Central Gorilla Mining Ltd 19/02/2025 495km2 N/A
Kombo Central Gorilla Mining Ltd 19/02/2025 460km2 N/A
Bounde Central Gorilla Mining Ltd 19/02/2025 425km2 N/A
Alamba Central Gorilla Mining Ltd 19/02/2025 348km2 N/A
Biyan Central Gorilla Mining Ltd 18/07/2025 261km2 N/A
Nlong Central Gorilla Mining Ltd 18/07/2025 371km2 N/A
Awae Central Weaver Resources Ltd 07/07/2025 462km2 N/A
Ayene II Central Weaver Resources Ltd 07/07/2025 497km2 N/A
Assi Central Weaver Resources Ltd 07/07/2025 488km2 N/A
Bissoua _II Central Weaver Resources Ltd 07/07/2025 441km2 N/A
Soleye Central Weaver Resources Ltd 23/06/2025 466km2 N/A
Soleye_W Central Weaver Resources Ltd 23/06/2025 496km2 N/A
Ayene Central Weaver Resources Ltd 07/07/2025 295km2 N/A
Matomb Yaounde West Zebra Minerals Ltd 15/02/2023 499km2 N/A
Makak Yaounde West Zebra Minerals Ltd 15/02/2023 369km2 N/A
Mapan Yaounde West Zebra Minerals Ltd 18/07/2025 459km2 N/A
Lobo Yaounde West Zebra Minerals Ltd 18/07/2025 459km2 N/A
Lipombe Yaounde West Zebra Minerals Ltd 18/07/2025 417km2 N/A
Dibang Yaounde West Zebra Minerals Ltd 18/07/2025 315km2 N/A
Ekoundindi Yaounde West Zebra Minerals Ltd 18/07/2025 370km2 N/A
Malawi:
Project/Tenement
Name
Tenement
Details
Status
Acquired
during
quarter
Disposed
of during
quarter
Held at
end of
quarter
Machinga (Main) EPL0529 Granted - - 100%
Machinga (Extended
Area)
EPL0705 Granted - - 100%
Salambidwe EPL0518 Granted - - 100%
Ngala Hill EPL0510 Granted - - 100%
Tundulu EL0731 Granted - - 100%
Mzimba (West) EL0784 Granted - - 100%
Mzimba (Central) EL0732 Granted - - 100%
Mzimba (South) EL0783 Granted - - 100%
Karonga EL0782/24 Granted - - 100%