Highlights
Cameroon Portfolio
Douala Basin: the Company reported a maiden JORC (2012) Exploration Target for the Diwong
South area of 2.1–2.6 billion tonnes at 2.1–2.3% THM, including indicative grades of 0.3–0.35%
rutile and 0.06–0.07% zircon, confined to ~6% of the broader 2,580km² Douala Basin Project.
Note: the potential quantity and grade of the Exploration Target is conceptual in nature. There
has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further
exploration will result in the estimation of a Mineral Resource. The Exploration Target has been
prepared and reported in accordance with the JORC Code (2012 Edition).
Central Rutile Project: after quarter end, Cameroon’s Inter-ministerial Committee
recommended the Central Rutile exploration licence applications, covering approximately
9,152km² including Yaoundé West, for grant, subject to resubmission of specified documents
and execution of the required exploration contracts. Samples from hand-auger drilling at Boundé
and Nganda and soil sampling at Yaoundé West continue to be processed through the
Company’s in-country Yaoundé HMS laboratory.
Malawi Portfolio – Mzimba Project
Phase 1 results received: 149 regional soil samples and 33 pit-channel samples were
analysed, defining titanium enrichment over a wider area than the original XRD points, including
two broad surface rutile-equivalent responses of approximately 16×2km and 13×2km.
Updated interpretation: results point to an ilmenite-dominant residual titanium system with
localised rutile, rather than a high-grade natural rutile system. Shallow pits did not show rutile
grade persistence with depth.
Corporate
Sale of Green Exploration Limited to AuKing: binding Share Sale Agreement entered into
with AuKing Mining Limited (ASX: AKN) for the sale of 100% of Green Exploration Limited
(GEL), holder of the Machinga, Ngala Hill, Salambidwe and Karonga projects in Malawi, for total
consideration of up to A$4.85 million. Tusker retains the Mzimba project.
Completion after quarter end: on 13 October 2026 the GEL sale completed and Tusker
received A$800,000 cash and 40,000,000 AuKing shares, with a further A$1.3 million in deferred
cash payable and up to A$1.75 million in performance shares.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Annual Report and AGM: the 2026 Annual Report was lodged and the Annual General Meeting
will be held on Thursday, 26 November 2026.
Engage with this announcement at the Tusker Minerals Investor Hub.
Tusker Minerals Ltd (ASX: TSK, ‘Tusker’ or ‘Company’) has released its Quarterly Activities Report for
the period ended 30 September 2026, providing an overview of activities completed during the
quarter.
Chief Executive Officer, Cliff Fitzhenry, commented:
“The September quarter delivered a maiden JORC (2012) Exploration Target at our port-proximal
Douala Basin HMS Project, which begins to quantify the scale of what we believe is an emerging
rutile-bearing mineral sands province in Cameroon.
At Mzimba, the Phase 1 results have given us a clearer picture of the mineralisation style. We will
reassess the model and targeting before committing further capital there, and in the meantime our
field and capital focus remains on Cameroon.
Shortly after quarter end, Cameroon’s Inter-ministerial Committee recommended our Central Rutile
licence applications for grant, an important step for our Cameroon titanium strategy. Our focus now is
on completing the remaining documentation and exploration contract requirements, while progressing
the existing samples through our Yaoundé laboratory.
Completion of the Green Exploration sale to AuKing, shortly after quarter end, has delivered non-
dilutive cash to the Company while retaining exposure to the Malawian assets through our AuKing
shareholding and performance consideration.”
Operational Overview
Cameroon Portfolio
Douala Basin HMS Project
During the quarter the Company reported a maiden JORC (2012) Exploration Target for the Diwong
South area of the Douala Basin HMS Project, prepared by independent consultants Mineral
Technologies (refer announcements 14 July 2026 and 17 July 2026).
Table 1: Douala Basin HMS Project – JORC (2012) Exploration Target*.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Parameter Exploration Target Range
Tonnage 2.1–2.6 Bt
THM Grade 2.1–2.3%
Indicative Rutile Grade 0.3–0.35%
Indicative Zircon Grade 0.06–0.07%
Contained HM 48–55 Mt
Indicative Contained Rutile 7–8 Mt
Indicative Contained Zircon 1.4–1.7 Mt
*Note: Exploration Target reported at a cut-off grade range of 0.5% and 1.5% THM. Contained rutile and zircon
figures are derived from the reported 48–55 Mt contained HM range and the modelled grand-total mineral
assemblage of approximately 15% rutile and 3% zircon of THM. Indicative in-situ rutile and zircon grades are
derived from the reported THM grade range and modelled grand-total mineral assemblage and are conceptual
in nature.
Cautionary Statement: The potential quantity and grade of the Exploration Target reported in this
announcement is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource,
and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The Exploration
Target has been prepared and reported in accordance with the JORC Code (2012 Edition).
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Figure 1: Diwong South Exploration Target showing modelled THM distribution on the left and rutile
as a percentage of THM on the right.
The current Exploration Target is confined to the modelled ~152km² Diwong South area, representing
only ~6% of Tusker’s broader 2,580km² Douala Basin Project. The target is vertically constrained by
an interpreted basement surface, while much of the historical drilling terminated at approximately 18–
24 metres, with mineralisation remaining open at end of hole in numerous areas.
The project is located within approximately 40km of the Port of Douala, providing access to
established export infrastructure, existing road access, power, telecommunications, industrial services
and skilled labour.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Figure 2: Douala Basin Project tenure relative to the Port of Douala, showing indicative 25km and
50km logistics catchment zones and the Project’s strategic proximity to critical export infrastructure.
Mineral Technologies’ independent review has established a program of exploration activities
designed to test the Exploration Target. The Exploration Target is conceptual in nature. There is no
certainty that further exploration will result in the estimation of a Mineral Resource. Tusker intends to
pursue the following activities:
Priority infill and step-out drilling on the highest-confidence portions of the current
Exploration Target (upper aeolian plateaus) to support resource conversion;
Deeper drilling to test extensions below the historical ~18–24m depth limit where
mineralisation remains open;
Expanded mineralogical and metallurgical test work focused on rutile, zircon and kyanite
recovery and product characteristics; and
Updated geological and block modelling incorporating new drilling and technical data.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
These activities are expected to commence following grant of the Diwong permit and applicable
approvals, with timing subject to drilling outcomes and assay turnaround.
The Diwong South Exploration Target lies within the Diwong application area (refer Events
Subsequent to Quarter End below).
Central Rutile Project
During the quarter, samples from the earlier reconnaissance soil and auger programmes across the
Central Rutile Project and Yaoundé West continued to be processed at the Company’s Yaoundé
heavy-mineral laboratory. Initial Central Rutile results have taken longer to deliver than previously
anticipated, reflecting the additional processing, mineral separation and QA/QC work required as
laboratory procedures have been refined.
The Company is working with Mineral Technologies to support completion of the current sample
batches, including a review of the laboratory set-up, separation flowsheet, chain-of-custody
procedures and QA/QC protocols. The Company intends to release results progressively as individual
batches complete processing, technical review and QA/QC.
After quarter end, the Central Rutile licence applications were recommended for grant by Cameroon’s
Inter-ministerial Committee (refer Events Subsequent to Quarter End below).
Malawi Portfolio
Mzimba Phase 1 Sampling Results
Following completion of the Phase 1 field program in the June quarter, the Company reported results
from regional soil sampling and shallow pit testing at the Mzimba Project, comprising the Mzimba
West (EL0784), Mzimba Central (EL0732) and Mzimba South (EL0783) licences (refer announcement
30 September 2026).
Historical TiO anomalies were confirmed to contain rutile by XRD. Follow-up work comprised 149
₂
regional soil samples, collected on an approximate 2km × 2km grid, and 33 one-metre pit-channel
samples from hand-dug pits generally to 5–6m depth. Heavy-mineral concentrates were magnetically
split and both fractions analysed by XRF at the Geological Survey Department, Zomba.
The soils define titanium enrichment over a wider area than the original XRD points, including two
broad surface rutile-equivalent responses of approximately 16×2km and 13×2km, with peak
calculated rutile-equivalent values of 0.69–0.71% and 0.61–0.70% respectively. Mean soil rutile-
equivalent is approximately 0.08%. Calculated ilmenite-equivalent is more widespread and reaches
higher values (soil mean approximately 0.55%, maximum 3.37%), with magnetic titanium exceeding
rutile-equivalent in 112 of 149 soil samples (Figure 3).
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Calculated rutile-equivalent in pit channels peaked at 0.10% (PIT03, 0–1m) and was commonly at or
below 0.08% in the upper metres, falling further or remaining negligible with depth in several pits. The
pits do not support an immediate rutile-focused drill programme on the Phase 1 anomalies.
Figure 3: Interpolated calculated rutile-equivalent bulk (left) and ilmenite-equivalent bulk (right) from
the regional soil sampling programme, Mzimba Project.
The working interpretation is now an ilmenite-dominant residual titanium system with localised rutile,
rather than a high-grade natural rutile occurrence with minimal ilmenite. The initial rutile occurrences
are confirmed and consistent with the regional results, but do not define a continuous licence-scale
rutile system (Figure 4).
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Figure 4: Regional soil sampling results shown together with the earlier XRD-rutile occurrences,
Mzimba Project.
Next steps at Mzimba:
Reassess the Mzimba geological model and targeting using the Phase 1 dataset, including
whether rutile remains the primary target or whether titanium more broadly should be treated as
the exploration thesis.
No drilling is planned at Mzimba pending that reassessment, with near-term capital and technical
resources directed to the Company’s Cameroon projects.
A decision on the three Mzimba exploration licences (EL0784, EL0732 and EL0783) will follow
the reassessment and the Company’s broader portfolio priorities.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Corporate
Sale of Green Exploration Limited to AuKing Mining
During the quarter the Company agreed to sell 100% of Green Exploration Limited (GEL), its
Malawian subsidiary holding the Machinga REE (EPL 0529 and EPL 0705), Ngala Hill, Salambidwe
and Karonga projects, to AuKing Mining Limited (ASX: AKN) under a binding Share Sale Agreement
announced on 18 August 2026. The agreement replaced the proposed sale of the Machinga REE
Project alone, announced on 4 August 2026. The Mzimba licences were excluded from the sale and
are retained by Tusker.
The sale completed shortly after quarter end, on 13 October 2026, for total consideration of up to
A$4.85 million in cash and AuKing shares (refer Events Subsequent to Quarter End below).
Issue of Shares on Conversion of Performance Rights
During the quarter the Company issued 5,000,000 fully paid ordinary shares on conversion of
performance rights issued to the vendors as part consideration for the Yaoundé West acquisition and
lodged a cleansing notice under section 708A(5)(e) of the Corporations Act on 20 August 2026.
Exercise of Loyalty Options
During the quarter 2,142 quoted Loyalty Options (ASX: TSKO) were exercised at $0.15 each, and the
resulting shares were quoted on 20 August 2026.
Cessation of Securities
During the quarter 1,000,000 performance rights lapsed on 17 September 2026 as their vesting
conditions were not met. On 27 August 2026 the Company also notified the lapse of 5,000,000
performance rights (13 December 2025) and the expiry of 3,000,000 unquoted options (23 June
2026).
Annual Report and Annual General Meeting
On 30 September 2026 the Company lodged its 2026 Annual Report, Corporate Governance
Statement and Appendix 4G. The Company’s Annual General Meeting will be held on Thursday, 26
November 2026 at 3:00pm (AWST).
Events Subsequent to Quarter End
Completion of Sale of Green Exploration Limited to AuKing
On 13 October 2026 the Company completed the sale of 100% of GEL to AuKing. AuKing now holds
the Machinga, Ngala Hill, Salambidwe and Karonga projects, and Tusker retains the Mzimba project.
Consideration received at Completion:
A$800,000 cash; and
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
40,000,000 fully paid AuKing shares, issued at a deemed price of $0.025 per share and subject
to 12-month voluntary escrow.
Consideration still to be received:
A$50,000 cash within 90 days of Completion;
A$1,250,000 cash on the first anniversary of Completion; and
up to A$1,750,000 in AuKing shares, payable if a JORC Mineral Resource of at least 10Mt at
0.65% TREO is announced at Machinga (A$1,250,000) or Ngala Hill drilling meets specified
grade thresholds (A$500,000), in each case within three years.
The Completion cash supports the Company’s rutile and heavy mineral sands work in Cameroon and
at Mzimba without dilution to Tusker shareholders, while the AuKing shares and performance
consideration retain exposure to the Malawian assets.
The Company will continue to look for additional opportunities that complement its existing projects.
Central Rutile Licensing Update
On 30 October 2026 the Company announced that Cameroon’s Inter-ministerial Committee has
recommended the Central Rutile exploration licence applications for grant. The Central Rutile Project
comprises 22 exploration licence applications covering approximately 9,152km², including the
Yaoundé West package acquired in December 2025.
The recommendations remain subject to resubmission of specified corporate, fiscal and administrative
documents and completion of the required exploration contract process before the ministerial orders
can be signed. Formal grant instruments have not yet been issued, the applications remain pending
until these steps are completed, and a firm timetable for completion is not currently available. Tusker
is working with its in-country advisers and the relevant authorities to complete these requirements.
At the Douala Basin HMS Project, the Mungo, Mbanga and Edéa Sud permits are granted and
currently subject to renewal, while the Maleke, Diwong and Mbongo permits remain under application.
The Diwong South Exploration Target lies within the Diwong application area, and follow-up drilling
remains subject to grant of the Diwong permit and applicable approvals.
Systematic exploration on the application areas remains subject to formal grant and applicable
approvals; work completed to date has been reconnaissance in nature.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Figure 5: Central Rutile Project licensing status, covering approximately 9,152km² of tenure
prospective for residual rutile mineralisation.
Tenement Schedule
This section is provided in compliance with ASX Listing Rule 5.3. Please refer to Annexure 1 for a
complete list of tenements currently held by the Company.
During the quarter, the Tundulu licence was disposed of by the Company. Following quarter end, the
Machinga (EPL0529 and EPL0705), Salambidwe (EPL0518), Ngala Hill (EPL0510) and Karonga
(EL0782/24) licences were disposed of on Completion of the GEL sale on 13 October 2026.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, the Company reports that exploration expenditure incurred
during the September 2026 quarter was A$562,585 (item 2.1(d)). There were no mining production
and development activities during the quarter.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Cash Position
Cash at the end of the quarter: ~A$0.52 million. After quarter end, the Company received A$800,000
cash from AuKing on Completion of the GEL sale, with a further A$3.5 million in deferred cash to be
received over the next 12 months from the Tundulu and GEL transactions (A$2.2 million from Tundulu
and A$1.3 million from GEL).
Note 6 of Appendix 5B
Payments to related parties of the entity and their associates: during the September 2026 quarter
A$65,189 was paid to directors and associates for director, consulting, company secretarial and
accounting fees.
-ENDS-
This announcement has been authorised by the Board of Tusker Minerals.
More information
Mr Daniel Smith Mr Cliff Fitzhenry
Executive Chairman Chief Executive Officer
dan@tuskerminerals.com cliff@tuskerminerals.com
About Tusker Minerals
Tusker Minerals is an African-focused explorer advancing a high-quality portfolio of critical mineral assets
across Cameroon & Malawi. Tusker's projects include the Central Rutile Project and Douala Basin HMS Project
in Cameroon and the Mzimba HMS Project in Malawi.
Competent Person Statement
The information in this report that relates to the Exploration Target for the Douala Basin HMS Project is
extracted from the Company's ASX announcement titled “Douala Basin Emerges as Globally Significant Rutile
Project” dated 14 July 2026, as amended by the announcement titled “Amended Announcement Douala Basin
Exploration Target” dated 17 July 2026. The information in this report that relates to Exploration Results for the
Mzimba Project is extracted from the Company's ASX announcement titled “Mzimba Phase 1 Sampling Results”
dated 30 September 2026. These announcements are available at www.asx.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in those original market announcements and, in the case of the Exploration Target, that all material
assumptions and technical parameters underpinning the Exploration Target in the original market
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person's findings are presented have not been materially modified from the
original market announcements.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking statements,
opinions and estimates are only predictions and are subject to risks, uncertainties and assumptions which are
outside the control of Tusker Minerals. Past performance is not necessarily a guide to future performance and
no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-
looking statements, opinions or estimates. Actual values, results or events may be materially different to those
expressed or implied in this announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements, opinions
or estimates. Any forward-looking statements, opinions or estimates in this announcement speak only at the
date of issue of this announcement. Subject to any continuing obligations under applicable law and the ASX
Listing Rules, Tusker Minerals does not undertake any obligation to update or revise any information or any of
the forward-looking statements, opinions or estimates in this announcement or any changes in events,
conditions or circumstances on which any such disclosures are based.
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Annexure 1 – Tenements
In accordance with Listing Rule 5.3.3, TSK advises the details of the tenements held by the Company or its
subsidiaries as at 30 September 2026.
Cameroon
Project Tenement Status Acquired during
quarter
Disposed during
quarter
Held at end of
quarter
Douala Mungo Granted - - 100%
Douala Mbanga Granted - - 100%
Douala Edéa Sud Granted - - 100%
Douala Maleke Application - - 100%
Douala Diwong Application - - 100%
Douala Mbongo Application - - 100%
Central Nsimbo Granted - - 100%
Central Kombo Application - - 100%
Central Boundé Application - - 100%
Central Alamba Application - - 100%
Central Biyan Application - - 100%
Central Nlong Application - - 100%
Central Awae Application - - 100%
Central Ayene II Application - - 100%
Central Assi Application - - 100%
Central Bissoua II Application - - 100%
Central Soleye Application - - 100%
Central Soleye W Application - - 100%
Central Ayene Application - - 100%
Central Matomb Application - - 100%
Central Makak Application - - 100%
Central Mapan Application - - 100%
Central Nganda Application - - 100%
Central Lobo Application - - 100%
Central Lipombe Application - - 100%
Central Dibang Application - - 100%
Central Nkolbot Konanga Application - - 100%
Central Okola Application - - 100%
Malawi
Project Tenement Status Acquired during
quarter
Disposed during
quarter
Held at end of
quarter
Machinga (Main) EPL0529 Granted - - 100% (see note)
Machinga
(Extended Area)
EPL0705 Granted - - 100% (see note)
Ground Floor, 8 St Georges Terrace,
Perth WA 6000
+61 8 9486 4036
tuskerminerals.com ABN: 91 663 592 318
Project Tenement Status Acquired during
quarter
Disposed during
quarter
Held at end of
quarter
Salambidwe EPL0518 Granted - - 100% (see note)
Ngala Hill EPL0510 Granted - - 100% (see note)
Mzimba (West) EL0784 Granted - - 100%
Mzimba (Central) EL0732 Granted - - 100%
Mzimba (South) EL0783 Granted - - 100%
Karonga EL0782/24 Granted - - 100% (see note)
Note: The Machinga, Salambidwe, Ngala Hill and Karonga licences were held by GEL, which was
sold to AuKing on 13 October 2026 (after quarter end). The Mzimba licences are excluded from that
sale and are to be transferred to Tusker.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Tusker Minerals Limited
ABN Quarter ended (“current quarter”)
91 663 592 318 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs - -
(e) administration and corporate costs (246) (246)
1.3 Dividends received (see note 3) - -
1.4 Interest received 2 2
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(244) (244)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (562) (562)
(e) investments - -
(f) other non-current assets - -
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(562) (562)
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(10) (10)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
(10) (10)
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,331 1,331
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(244) (244)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(562) (562)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(10) (10)
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
515 515
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 515 1,331
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
515 1,331
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
65
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
- Director/company secretarial fees/accounting/consulting fees $65,189.
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (244)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(562)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (806)
8.4 Cash and cash equivalents at quarter end (item 4.6) 515
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 515
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.64
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as
“N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: No. Near-term operating and exploration cash outflows are expected to be lower
than the September quarter. Following the divestment of the Malawian projects,
exploration activity and expenditure will be prioritised towards the Cameroon
projects.
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
Share your feedback
Discover