Quarterly Report & Appendix 5B
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
10 April 2025
Quarterly Activities Report
for the period ended 31 March 2025
Karonga (Base Metals)
•
Karonga licence area was formally granted during the quarter.
•
The licence covers an area of approximately 36km2 and has the potential for copper mineralisation,
as confirmed from preliminary reconnaissance/surveillance work.
•
Preliminary reconnaissance/ surveillance sampling work conducted on the licence area during the
quarter revealed the occurrence of elevated Cu grades, with initial portable XRF results ranging
from 1.4 to 7.8% Cu in rock.* Results are to be verified using standard laboratory-based XRF
analytical assaying methods. 1
•
DY6 has recently acquired and completed reprocessing of historic hyperspectral survey data,
which has been used to map areas with high probability for copper mineralisation. The results from
this exercise correlate well to the mineralisation identified in the sampling work.
•
Historic anomalies from regional airborne geophysical radiometric and magnetic data appear to
correlate with both the hyperspectral probability copper mineralisation mapping and the preliminary
sampling reconnaissance work conducted.
•
Exploration for Cu and other minerals will continue on the licence area.
*Cautionary Statement on pXRF – pXRF (Portable X-Ray Fluorescence) results that are announced in this report
are from uncrushed, rock-chip samples and are preliminary only. The use of pXRF is an indication only of the order
of magnitude of expected final assay results.
Tundulu (REE)
•
DY6 has commissioned preliminary metallurgical testwork to be undertaken on a select bulk
sample from Tundulu to determine the suitability of the Tundulu deposit to produce a separate rare
earth and phosphate concentrate.
•
Initial results of size liberation testwork from this preliminary program, which is being undertaken
by Auralia Metallurgy in Perth, is expected in the coming weeks.
Loyalty Options Entitlement Issue
The Company raised approximately $204,750 pursuant to a fully underwritten loyalty options
entitlement offer (offering 1 unlisted option for every 2 shares held) pursuant to a prospectus dated 19
December 2024.
Heavy rare earths and critical metals explorer DY6 Metals Ltd (ASX: DY6) (“DY6”, “the Company”) is
pleased to present its quarterly activities report for the March 2025 quarter.
1 Refer ASX announcement dated 19 March 2025.
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
OPERATIONS
Karonga Project (Base Metals)
Figure 1. Location map of newly granted Karonga licence
The Karonga Project is located about 440km north of the capital Lilongwe Figure 1. It can easily be
accessed using Karonga-Chitipa M1 Road turning to the west at Kasikisi School signpost along the M1
Road (Figure 2).
Geology and Mineralisation
The Karonga area is associated with a series of NW-SE and N-S trending ridges with metamorphic
Basement complex rocks commonly identified as windows within the Karroo System which overlies the
basement. The Karroo System units are typically sandstones with carbonaceous shale formations.
The eastern part of the licence area is overlain by several patches of Karoo sediments and Cretaceous
to recent lacustrine sediments, the interrelations of which are complex due to unconformities and
faulting (Figure 3A). This area is part of the northern sub-province of the Malawi Province of the
dy6metals.com | ASX:DY6
2
Mozambique belt, active between about 700-400 million years ago. The major lithological components
are gneisses and intrusives of the Misuku Belt, representing the south-eastern extension of the
Ubendian Mobile Belt of south-western Tanzania into Malawi.
On a more local scale, the licence area is comprised of a suite of quartzite rocks, pegmatitic rocks and
amphibole gneisses that intrude into the basement gneissic rocks forming the wall rock of the project
area. The lithologies have a general NW-SE trend and are dipping west / south-west at very steep
angles ranging from 600 to 850.
The presence of base metals and other related metal mineralisation is evident in the pegmatitic rocks
and quartz zone (quartzite) group. The quartzite unit have clear malachite and azurite coexisting with
sulphides minerals indicating the presence of copper and other base metals.
Figure 2. Topographical map of the Karonga licence EL0782/24
Surveillance/Initial Reconnaissance Work Done
1. Surveillance Site Visit
Four samples (Table 1) were collected on a recent reconnaissance visit to the site. The visit targeted
an anomaly which was identified using a combination of geology and aeromagnetic data (Figures 3A &
B). The samples were collected on a mineralised quartzite zone, which displayed disseminated
mineralisation of malachite and azurite with sulfides. These samples were analysed using an
Olympus Avanta Portable XRF (pXRF) machine.
dy6metals.com | ASX:DY6
3
Table 1: Samples collected on surveillance site visit Cu analytical results (pXRF-based)
Sample ID
Longitude
Latitude
Altitude (m)
Cu (%) – pXRF Reading
KARS022
8898932
594735.6
577.49
1.4
KARS022B
8898988
594714.62
572.51
6.1
KARS022C
8898977
594714.15
581.93
7.5
KARS022D
8898992
594715.84
576.97
7.8
Results showed elevated Cu grades ranging from 1.4% to 7.8% Cu (Table 1 & Figure 3B). These
samples were collected on a 60cm thick zone of an exposed portion of a 40 – 50m long quartzite zone.
The samples will be sent to SGS Randfontein laboratory in South Africa for a standard XRF analytical
procedure to verify the Cu grades and other minerals grades obtained from the pXRF.
Figure 3: A – Geology of the Karonga Licence & B – Aeromagnetic signature of the Karonga
Licence
Next Steps
•
Further exploration work is currently planned to follow the anomalies identified in the surveillance
activities, including geochemical analysis of the four collected samples at SGS Randfontein
laboratory in South Africa to verify and validate the results obtained from the pXRF machine;
•
Detailed geological mapping of the licence area; and
•
Detailed geochemical sampling of surface outcrop rock chips, soils and where possible trenching
to be considered.
The outcome of the activities above will lead to target generation for a future drill program, which will in
turn be used for mineral resource and reserve estimations.
dy6metals.com | ASX:DY6
4
Tundulu Project (REE)
•
During the quarter, DY6 commissioned preliminary metallurgical testwork to be undertaken on a
select bulk sample from Tundulu to determine the suitability of the Tundulu deposit to produce a
separate rare earth and phosphate concentrate.
•
Initial results of size liberation testwork from this preliminary program, which is being undertaken
by Auralia Metallurgy in Perth, is expected in the coming weeks.
Figure 4. Map of the Tundulu licence
Mzimba/Machinga/Ngala Hill & Salambidwe
No work was conducted on these Projects during the quarter.
dy6metals.com | ASX:DY6
5
Figure 5. Location of the Company’s Projects in Malawi
Corporate
Securities
On 21 January 2025, a total of 29,249,978 unlisted options exercisable at $0.07 each expiring on or
before 21 January 2029 were issued to participants and underwriters pursuant to the Company’s fully
underwritten loyalty option entitlement offer. The entitlement issue raised ~$204,000 (before costs).
dy6metals.com | ASX:DY6
6
Finance and Use of Funds
Pursuant to ASX Listing Rule 5.3.4, the Company provides a comparison of its actual expenditure
against the estimated expenditure on items set out in Section 1.6 of the Company’s IPO prospectus.
The analysis below reflects the period from 1 June 2023 to 31 March 2025:
Activity Description
Exploration –
Machinga (2 years)
Exploration –
Salambidwe (2 years)
Exploration – Ngala
Hill (2 years)
Administration (2
years)
Working Capital (2
years)
New Project
Evaluation
Expenses of the
Offer1
TOTAL
Prospectus
Actual (from 1 June
23 to 31 March 25)
Variance
$2,450,000
$2,455,897
($5,897)
$1,000,000
$199,336
$800,664
$475,000
$57,418
$417,582
$750,000
$1,143,809
($393,809)
$1,565,000
$822,638
$742,362
$800,000
$505,270
$294,730
$665,000
$441,260
$223,740
$7,705,000
$5,625,628
$2,079,372
1Note: certain expenses of the Offer as part of the Company’s IPO were also paid out prior to 1 June
2023 and therefore not accounted for in the above table.
In respect of the variances above, the Company provides the following commentary: since listing the Company has
applied for additional licence areas in Malawi being Tundulu, Karonga and Mzimba to complement its existing
project portfolio. Given tough market conditions for junior exploration companies, the Company’s predominate
focus has been advancing exploration at the Machinga project and progressing the newly granted Tundulu project.
The Company has also recently conducted reconnaissance and sampling programs at Ngala Hill and its Karonga
and Mzimba licences. In addition, the Company will also continue to evaluate new project opportunities that may
complement its existing portfolio. The Company continues to monitor its corporate and overhead costs given market
conditions.
dy6metals.com | ASX:DY6
7
Summary of Mining Exploration Activities Expenditure
During the March quarter, the Company made the following payments in relation to mining exploration
activities:
-
Title management and other consultants: $13,007
-
Mapping and sampling: $38,232
-
Drilling and assaying: $12,000
-
Field supplies, vehicles, travel and other: $14,368
-
New project expenditures: $69,280
Appendix 5B Disclosures
At 31 March 2025, the Company had cash on hand of approximately $1.6m.
Note 6 to Appendix 5B:
Payments to related parties of the entity and their associates: during the March quarter a total of
$64,444 was paid to Directors and associates for director, company secretarial, accounting and
consulting fees.
New Opportunities
The Company continues to evaluate new project opportunities that may complement its existing
portfolio. The Company continues to monitor its corporate and overhead costs given market conditions.
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Dan Smith
Mr John Kay
Mr Luke Forrestal
Non-Executive Chairman
Director & Company Secretary
Investor Relations
dan.smith@dy6metals.com
john.kay@dy6metals.com
+61 411 479 144
Abbreviations
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3,
Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO% = HREO/TREO * 100
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
dy6metals.com | ASX:DY6
8
MREE=Nd, Pr, Dy, Tb
P = Phosphorus
P2O5 = Phosphorus pentoxide
Competent Persons Statement
The information in this report that relates to exploration results, mineral resources or ore reserves is
based on information compiled by Mr Allan Younger, who is a Member of the Australasian Institute of
Mining and Metallurgy. Mr Younger is a consultant of the Company. Mr Younger has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration and
to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of
the `Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the
JORC Code). Mr Younger consents to the inclusion of this information in the form and context in which
it appears in this report. Mr Younger holds shares in the Company.
For further information with respect to exploration results during the March quarter, please refer to ASX
announcement dated 19 March 2025.
Cautionary Statement
Visual observations of the presence of rock or mineral types and abundance should never be
considered a proxy or substitute for petrography and laboratory analyses where mineral types,
concentrations or grades are the factor of principal economic interest. Visual observations and
estimates also potentially provide no information regarding impurities or deleterious physical properties
relevant to valuations. At this stage it is too early for the Company to make a determinative view on the
abundances of any of these minerals. These abundances will be determined more accurately through
petrography, assay, and XRF analysis. The observed presence of known copper-bearing minerals does
not necessarily equate to copper mineralisation. It is not possible to estimate the concentration of
copper by visual estimation and this will be determined by chemical analysis.
dy6metals.com | ASX:DY6
9
Annexure 1. Tenements held directly by DY6 Metals Ltd or subsidiary companies as at 31 March
2025:
Granted
Acquired
during
quarter
-
Disposed
of during
quarter
-
Held at
end of
quarter
100%
EPL0705
Granted
-
-
100%
Malawi
EPL0518
Granted
-
-
100%
Malawi
Ngala Hill
EPL0510
Granted
-
-
100%
Malawi
Tundulu
EL0731
Granted
-
-
100%
Malawi
Mzimba (West)
APL0540
Application
-
-
100%
Malawi
Mzimba (Central)
EL0732
Granted
-
-
100%
Malawi
Mzimba (South)
APL0538
Application
-
-
100%
Malawi
Karonga
EL0782/24
Granted
-
-
100%
Malawi
Project
Tenement
Details
Status
Machinga (Main)
EPL0529
Machinga
(Extended Area)
Salambidwe
State/Country
Malawi
dy6metals.com | ASX:DY6
10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
DY6 Metals Limited
ABN
Quarter ended (“current quarter”)
91 663 592 318
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(150)
(523)
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
1
22
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(149)
(501)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(147)
(646)
(e) investments
-
-
(f)
-
-
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(147)
(646)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
205
205
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(11)
(20)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(3)
(23)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
190
161
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,704
2,584
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(149)
(501)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(147)
(646)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
190
161
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
1,598
1,598
Current quarter
$A’000
Previous quarter
$A’000
1,598
1,704
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,598
1,704
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Current quarter
$A'000
64
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
-
Director/company secretarial fees/accounting/consulting fees $64,444.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(149)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(147)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(296)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,598
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,598
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.40
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
10 April 2025
The board of directors
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover