Cameroon Operational Update
Released
Released
Announcement PDF
ASX Announcement
29 May 2026
Operational update – Exploration and Processing Advances
Across Cameroon Rutile and HMS Projects
Highlights
• On-site sample processing facility is now fully operational, with shaking table calibrated and
delivering consistent and repeatable results for heavy mineral sands (“HMS”) samples.
• Purpose-built HMS mineral separation laboratory now fully operational in Yaoundé, allowing
for rapid in-country processing of all exploration samples, significantly reducing
turnaround times and the ability to estimate recovered rutile % concentrations rather than
relying solely on total HM percentages.
• Auger drilling program completed across the southern portion of the historically mapped 70 x
15km BRGM high-grade rutile corridor at the Central Rutile Project, a highly prospective,
high-priority target and the only known location in Cameroon where historical mining of
residual rutile has occurred, to test the depth and continuity of near-surface rutile
mineralisation in what represents the first modern, systematic drill testing of this highly
prospective mineralised corridor1
.
• Systematic soil-sampling program well advanced at the newly acquired Yaoundé West licence
package, supporting target generation and future drill targeting.
• Maiden JORC (2012) Exploration Target study for the Douala Basin HMS Project
progressing well, with final results anticipated in the coming weeks.
• Historical sonic drilling completed by previous holder Eramet across the Diwong licence
(forming part of the broader Douala Basin HMS Project) confirmed thick, laterally extensive
HMS mineralisation from surface, with several holes ending in mineralisation, highlighting
the significant scale potential of the system. Standout intercepts include:
o 10m @ 5.0% THM (including 0.34% rutile) from surface (DIB_S00024)
o 12m @ 4.7% THM from surface (DIB_S00018)
o 18m @ 3.7% THM (including 0.4% rutile) from surface, ending in mineralisation (DIB_S00010)
o 18m @ 2.0% THM (including 0.4% rutile) from surface, ending in mineralisation (DIB_S00017)
o 7.25m @ 2.64% THM (including 0.7% rutile and 0.11% zircon) from surface (MIST00011)
• Company remains well funded to advance ongoing exploration and development activities
across its Cameroon portfolio.
1
Refer ASX Announcement 15 December 2025, “Tusker Minerals Progressing Strongly in Cameroon with Major Exploration and
Operational Milestones”
Tusker Minerals Ltd (ASX: TSK, “Tusker” or “Company”) provides the following operational update on
exploration and development activities across its rutile and Heavy Minerals sands (HMS) portfolio in
Cameroon.
Central Rutile Project
HMS Processing Facility and Laboratory
Processing of both soil and auger samples collected during recent exploration programs is well
advanced at Tusker’s wholly-owned sample processing facility in Cameroon. The purpose-built facility
has been designed to support the efficient in-country processing of HMS samples while maintaining full
chain-of-custody control.
The shaking table is now operating consistently following an extensive period of testing, calibration, and
refinement. Optimisation efforts have focused on improving QA/QC protocols and recovery efficiency
to support reliable and repeatable heavy mineral concentrate results across future exploration
programs.
The facility represents a significant strategic advancement in Tusker’s in-country exploration capability,
enabling rapid turnaround of exploration samples and the ability to estimate recovered rutile
concentrations rather than relying solely on total HM percentages.
Auger Drilling Program
Field activities have continued to advance, with a total of 24 auger holes for 305 metres successfully
completed across the southern portion of the high-grade BRGM rutile corridor within the Central Rutile
Project. This historically mapped high-grade BRGM rutile corridor extends over approximately 70km of
strike and up to 15km in width, representing a highly prospective, priority target for the Company and
the only known location in Cameroon where historical mining of residual rutile has occurred. This
program represents the first modern, systematic drill testing undertaken across this highly prospective
mineralised corridor.
The auger drilling program was designed to evaluate the depth and continuity of near-surface rutile
mineralisation within this high-priority target area, which has previously returned some of the strongest
surface rutile expressions identified across the project area.
Further auger drilling and associated field programs across the broader Central Rutile licence area
remain subject to the formal grant of the Company’s exploration licences. The inter-ministerial
committee responsible for licence approvals continues to convene regularly, with licence grants
anticipated over the coming weeks and months.
Figure 1: Geological map showing the current planned and completed hand-auger drillholes which
targeted the historic BRGM mapped residual rutile corridor on the Bounde and Nganda licences.
Figure 2: Map showing the planned and completed soil samples from across the Yaounde West licence
package.
Systematic Soil Sampling Program
The systematic soil-sampling campaign is well advanced across the Yaoundé West licence package,
with approximately 853 samples collected to date. The program represents the first modern, systematic
exploration campaign undertaken across the project area, with all samples to be processed through
Tusker’s Yaoundé HMS laboratory facility.
The program is expected to establish a robust geochemical dataset for the project area and assist in
identifying anomalous rutile and REE zones for focused follow-up drilling and future exploration
targeting.
Douala Basin Project
At the Douala Basin HMS Project, independent consultants Minerals Technologies are continuing
detailed technical work on the maiden JORC (2012) Exploration Target2. This study incorporates all
available historical and recent exploration data across the project area and is progressing well, with
results anticipated in the coming weeks.
The Douala Basin Project represents a large-scale HMS opportunity within the highly prospective
Douala coastal basin in Cameroon. Covering a substantial portion of this underexplored basin system,
the project has already demonstrated significant exploration potential through historical sonic and auger
drilling completed by previous holder Eramet across the Diwong licence (forming part of Tusker’s
broader project package). Historical drilling confirmed thick HMS mineralisation from surface, with
several holes ending in mineralisation, highlighting the potential scale of the system. Standout historical
intercepts include:
• 10m @ 5.0% THM (including 0.34% rutile) from surface (DIB_S00024)
• 18m @ 3.7% THM (including 0.4% rutile) from surface, ending in mineralisation (DIB_S00010)
• 7.25m @ 2.64% THM (including 0.7% rutile and 0.11% zircon) from surface (MIST00011)
The Exploration Target study is expected to assist the Company in evaluating the potential scale and
development potential of the Douala Basin HMS Project and in guiding future exploration and resource
definition programs.
Chief Executive Officer, Mr Cliff Fitzhenry, commented:
“This update reflects strong operational momentum building across Tusker’s Cameroon portfolio. At
Central Rutile, our purpose-built in-country HMS processing facility is now operational and delivering
reliable and repeatable results, representing a major advancement in the Company’s exploration
capability through rapid sample turnaround and enhanced data quality.
The recently completed auger drilling program marks the first modern, systematic drill testing of the
historically mapped BRGM high-grade rutile corridor, which remains one of the Company’s highest-
2
Refer ASX Announcement 8 May 2026, “Tusker Outlines High-Grade, Near-Surface HMS Potential at Douala Basin, Cameroon”.
Note: The potential quantity and grade of any Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
priority exploration targets. We believe this corridor has the potential to emerge as a significant rutile
system within Cameroon.
At Douala Basin, the maiden Exploration Target study remains on schedule and is expected to provide
an important first step in understanding the broader scale potential of this highly prospective HMS basin
system.
Overall, we continue to see exceptional prospectivity and scale potential across our Cameroon portfolio
and look forward to delivering further exploration results and project milestones over the coming
months.”
Tusker remains well funded to advance its ongoing exploration and development activities in Cameroon
and believes the country remains significantly underexplored for residual rutile systems, despite hosting
favourable geological settings analogous to major rutile provinces elsewhere in Africa.
Figure 3: Map of Cameroon showing Tusker Mineral’s Central Rutile Project in green, and the Douala
Basin Project in blue, encompassing +11,000km2 of highly prospective tenure.
-ENDS-
This announcement has been authorised by the Board of Tusker Minerals.
More information
Mr Daniel Smith Mr Cliff Fitzhenry Jessica Fertig
Executive Chairman Chief Executive Officer Media and Investor Relations
dan@tuskerminerals.com cliff@tuskerminerals.com jessica@taumedia.com.au
About Tusker Minerals
Tusker Minerals is an African-focused explorer advancing a world-class portfolio of critical mineral
assets across Cameroon & Malawi. Tusker’s projects include the Central Rutile and Douala Basin HMS
Projects in Cameroon and the Machinga HREE and Salambidwe Projects in Malawi.
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration results at
the Central Rutile Project, is based on information compiled by Mr Clifford Fitzhenry, a Competent Person who is
a Registered Professional Natural Scientist with the Council for Natural Scientific Professionals (SACNASP). Mr
Fitzhenry is the Company’s CEO and has sufficient experience which is relevant to the style of mineralization and
type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’. Mr Fitzhenry consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the above original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking statements, opinions
and estimates are only predictions and are subject to risks, uncertainties and assumptions which are outside the
control of Tusker Minerals. Past performance is not necessarily a guide to future performance and no
representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking
statements, opinions or estimates. Actual values, results or events may be materially different to those expressed
or implied in this announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements, opinions or
estimates. Any forward-looking statements, opinions or estimates in this announcement speak only at the date of
issue of this announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules,
Tusker Minerals does not undertake any obligation to update or revise any information or any of the forward-
looking statements, opinions or estimates in this announcement or any changes in events, conditions or
circumstances on which any such disclosures are based.
Share your feedback
Discover