Annual Report 2025
Released
Released
Announcement PDF
ABN 91 663 592 318
ANNUAL REPORT
FOR THE PERIOD ENDED 30 JUNE 2025
Page 1
CONTENTS
Directors’ Report ................................................................................................................................. 3
Auditor’s Independence Declaration ................................................................................................ 25
Financial Report…………………………………………………………………………………………………………………………... 26
Consolidated Entity Disclosure Statement ……………………………………………………………………………………57
Directors’ Declaration ....................................................................................................................... 58
Independent Audit Report ................................................................................................................ 59
Shareholder Information ................................................................................................................... 63
Schedule of Tenements ..................................................................................................................... 65
CORPORATE DIRECTORY
Executive Chairman
Mr Daniel Smith
Non-Executive Directors
Dr Nannan He
Mr Myles Campion
Mr John Kay
Chief Executive Officer
Mr Clifford Fitzhenry
Company Secretary
Mr John Kay
Stock Exchange
Australian Securities Exchange –
DY6
Registered Office
Level 8
99 St Georges Terrace
Perth WA 6000
Telephone: (08) 9486 4036
Facsimile: (08) 9486 4799
Email: info@dy6metals.com
Website: www.dy6metals.com
Postal Address:
PO Box 5638
St Georges Terrace
Perth WA 6831
Share Registry
Computershare Investor Services
Level 17
221 St Georges Terrace
Perth WA 6000
Auditors
Moore Australia Audit (WA)
Level 15
2 The Esplanade
Perth WA 6000
Solicitors
HWL Ebsworth
Level 20
240 St Georges Terrace
Perth WA 6000
Page 2
DIRECTORS’ REPORT
CHAIRMAN’S LETTER
Dear Shareholders,
The past year has been a pivotal one for DY6 Metals. We have successfully repositioned the Company as an
emerging leader in critical minerals with the acquisition of a world-class rutile asset in Cameroon. This project is
already demonstrating its potential to be a globally significant deposit, comparable to Tier-1 operations that sit
at the very top of the rutile industry.
Rutile is a strategic mineral, essential to industries powering modern economies — from aerospace and defence
through to renewable energy and electric vehicles. Global demand for high-grade natural rutile continues to
outstrip supply. With our Central Rutile Project spanning nearly 6,000km² across Central Cameroon, we believe
DY6 is uniquely placed to deliver one of the next major rutile developments worldwide.
Exploration results to date have been highly encouraging, with reconnaissance auger and channel sampling
confirming high-grade mineralisation across broad strike lengths. Importantly, these results not only validate
our geological model but also confirm the scale of opportunity. With historical artisanal production and new
data pointing to significant rutile endowment, we are confident in the Project’s ability to emerge as a globally
relevant asset.
DY6 enters this next phase of growth from a position of strength. Post 30 June 2025, we raised $4.6 million from
institutional and sophisticated investors, ensuring the Company is well-funded to accelerate exploration and
development activities across Cameroon and Malawi.
To drive this next chapter, we welcomed Mr Cliff Fitzhenry as Chief Executive Officer. Cliff brings deep
operational and technical experience in Cameroon and will play a central role in executing our strategy on the
ground. Alongside his appointment, we have further expanded our management team with of Dr Moses Ndasi
as In-Country Manager for Cameroon, alongside Mr Troth Saindi’s new role as Exploration Manager, Africa.
These leadership additions provide DY6 with the skills, experience, and local knowledge required to deliver
projects efficiently and responsibly.
Looking ahead, we are focused on generating shareholder value through three clear priorities:
1. Advancing the Central Rutile Project towards resource definition and development.
2. Unlocking the broader potential of our diversified exploration portfolio across Cameroon and Malawi.
3. Maintaining disciplined capital management to ensure that every dollar invested translates into longterm value creation.
I would like to thank our shareholders for their continued support. The opportunity before DY6 is both rare and
exciting: to establish a world-class rutile project that contributes to global critical mineral supply chains, while
delivering value to shareholders.
Yours sincerely,
Dan Smith
Executive Chairman DY6 Metals Ltd
Page 3
DIRECTORS’ REPORT
Your directors present their report together with the financial statements of the Group consisting of DY6 Metals
Ltd (“DY6” or “the Company”) and its controlled entities for the year ending 30 June 2025, the notes to the
financial statements and the auditor’s report thereon.
DIRECTORS
The following persons were Directors of DY6 Metals Ltd during the financial year and up to the date of this report
unless otherwise stated:
Mr Daniel Smith – Executive Chairman (transitioned on 13 June 2025)
Mr John Kay – Non-Executive Director
Dr Nannan He – Non-Executive Director
Mr Myles Campion – Non-Executive Director
MANAGEMENT
Mr Cliff Fitzhenry – Chief Executive Officer (appointed 14 July 2025)
Mr John Kay – Company Secretary
PRINCIPAL ACTIVITIES
The Company’s strategy is centered on unlocking shareholder value through the discovery and development of
world-class mineral deposits in Cameroon and Malawi. Our exploration portfolio targets minerals critical to
global growth sectors such as defence, aerospace, electric vehicles, and renewable energy sectors – markets
forecast to experience long-term demand growth.
RESULTS AND DIVIDENDS
For the year ended 30 June 2025, the Group recorded a net loss of $1,887,749 (2024: net loss $1,536,145),
reflecting a period of significant investment in project acquisition and exploration. There were no dividends paid
or recommended during the financial year ended 30 June 2025 (2024: nil), and capital was strategically allocated
to advance projects expected to deliver shareholder value in the medium to long term.
CORPORATE
Leadership transitions were successfully managed to strengthen execution capacity. On 10 July 2024, Mr Lloyd
Kaiser stepped down as CEO, with Mr Cliff Fitzhenry recently appointed to lead the Company as Chief Executive
Officer (transitioning from the role of Cameroon Technical Consultant), bringing deep operational expertise in
Cameroon.
A major milestone for DY6 during the year (and post the reporting period) was the acquisition of 100% interests
in highly prospective rutile and heavy mineral sands (HMS) projects in Cameroon, positioning the Company in
one of the world’s most attractive emerging rutile provinces. These projects significantly expand our growth
pipeline and align with the strategic focus on critical minerals.
Page 4
DIRECTORS’ REPORT
To support this growth, DY6 has strengthened its management team with key appointments:
•
•
Dr Moses Ndasi – appointed In-Country Manager to oversee Cameroon operations.
Mr Troth Saindi – DY6’s Senior Exploration Geologist and In-Country Manager for Malawi, elevated to
Exploration Manager, Africa, with responsibility for overseeing regional exploration initiatives.
These additions deepen our on-the-ground operational leadership, enhancing project delivery capability and
positioning DY6 to rapidly unlock shareholder value across Africa.
The Company entered into binding agreements to acquire 100% of highly prospective rutile and HMS projects
in Cameroon. Full terms of the agreements are set out in the following ASX announcements: “Highly Prospective
Rutile & HMS Project Acquisition” dated 24 April 2025 and “Significant expansion to Central Rutile Project” dated
8 July 2025. The Company also applied for additional licences adjacent to existing ground to its Central Rutile
Project, refer to ASX announcement “DY6 further expands licence holding at Central Rutile Project” dated 21 July
2025 and the recent acquisition of the Yaounde West Project, adjacent to the existing Central Rutile Project
licences, “DY6 Acquires Previous Rutile Mining Site Expanding Project” as announced on 15 September 2025.
FUNDING & CAPITAL MANAGEMENT
DY6 strengthened its balance sheet during the year through a combination of equity initiatives, including;
•
•
•
A fully underwritten loyalty option entitlement offer raising approximately $204,750
A strategic share placement tied to the Cameroon acquisition, raising $400,000
A post-year-end placement to institutional and sophisticated investors (including participation by the
entire Board) raising $4.625m
The Company also received A$261,459 from the Australian Taxation Office as a research and development (R&D)
rebate for expenditure on the Company’s Machinga and Tundulu projects over the 2024 financial year period.
During the year and post reporting period to 30 September 2025, the Company issued a total of 40,048,950
shares, 73,049,978 options and 37,675,000 performance rights. By the end of June 2025, all remaining ASX
imposed escrowed securities were released from their trading restrictions.
Page 5
DIRECTORS’ REPORT
REVIEW OF OPERATIONS
Cameroon
Central Rutile Project
The Central Rutile Project spans 14 exploration permits under valid applications covering 5,901km2 in Central
Cameroon- an emerging globally significant rutile province (Figure 1). Early results confirm the project’s Tier-1
potential, comparable to world-leading deposits such as Sovereign Metal’s Kasiya deposit in Malawi (the world’s
largest primary rutile deposit at 1.8 billion tons at 1.0% rutile).
Post year-end reconnaissance programs returned high-grade rutile intercepts, confirming broad mineralisation
over 41km of strike. These results highlight DY6’s ability to rapidly demonstrate scale and quality, strengthening
the investment case.
The Central Rutile Project borders Lion Rock Mineral’s Minta Rutile Project where initial sampling has revealed
widespread, high-value mineral assemblages with valuable heavy minerals (VHM) up to 93% of total heavy
minerals (THM) and with the dominant VHM’s being rutile (up to 69.8%), monazite (up to 35.6%) and zircon (up
to 21.5%) (see Lion Rock Mineral’s Announcement “First systematic exploration programme discovers significant
rutile province in Cameroon” dated 4 February 2025).
High-grade rutile results from the reconnaissance auger, channel and grab sample campaign at the Central Rutile
Project included:
§
§
§
§
§
High-grade mineralisation of up to 2.1% rutile over 1m at Nsimbo and 1.57% rutile over 1m at Alamba
XRD analysis confirms that rutile is the dominant titanium bearing mineral, highlighting low levels of
ilmenite and no leucoxene present
Significant channel sample intercepts include:
o 3.5m @ 0.78% rutile (5.29% HM) from 0m, including 1m @ 2.1% rutile from 1m (GRMGB0007)
o 5.8m @ 0.47% rutile (6.98% HM) from 0m, including 1m @ 1.57% rutile from surface
(GRMGB0005)
o 4.8m @ 0.3% rutile (4.99% HM) from 0m, including 2m @ 0.46% rutile from surface
(GRMGB0006)
Significant auger intercepts include:
o 2.25m @ 0.6% rutile (8.7% HM), including 0.95m @ 0.96% rutile from surface (GRMAU0004)
o 0.8m @ 0.66% rutile (2.81% HM) from surface (GRMAU0010)
o 1.35m @ 0.84% rutile (1.23% HM) from 0m (GRMAU0013)
High-grade saprolite-hosted rutile mineralisation confirmed over 41km southeast northwest strikelength between Nsimbo and Alamba tenements (Figure 2)
Geological Background
The project area is predominantly underlain by kyanite-bearing mica schist bedrock, which is considered the
primary source of rutile. During in-situ weathering, rutile is liberated from the bedrock and progressively
concentrated and upgraded within the overlying saprolite layer. This forms an in-situ, eluvial saprolite hosted
rutile deposit target type deposit analogous to Sovereign Metal’s Tier 1 Kasiya deposit in Malawi.
The exploration model further proposes that subsequent erosion and fluvial transport rework these materials,
concentrating rutile and other valuable heavy minerals into alluvial deposits. Historical production figures from
the area between 1935 and 1955 have recorded some 15,000 tons of high purity (>95 %) rutile being produced
from artisanal mining of the alluvial deposits around Nanga-Eboko.
Page 6
DIRECTORS’ REPORT
Figure 1: Map of Central Cameroon showing DY6’s Central Rutile Project which encompasses 5,901km2 of
prime geological terrain highly prospective for residual, natural rutile mineralisation.
Figure 2: Zoomed in geological map of the Nsimbo and Alamba licences showing the recently completed
reconnaissance sampling campaign.
Page 7
DIRECTORS’ REPORT
Douala Rutile Project
The Douala Basin HMS Project consists of three granted exploration permits and three exploration permits under
valid applications. The Edea Sud licence is a fully granted permit covering an area of 440km2 whilst the five
licence applications (Mbanga, Maleke, Mungo, Diwong, and Mbongo) cover an area of 2,140km2 giving the total
project package a land endowment of 2,580km2 across the Douala Basin of Western Cameroon. The tenements
are all located within 50km of the deep-water port city of Douala.
Geologically the Douala Basin is a coastal sedimentary basin consisting of a package of mainly marine
sedimentary formations of Cretaceous to Quaternary in age. Thick, preserved sequences of sandy material are
known to exist across the tenement package and these are thought to represent palaeo-placer coastline dune
deposits. These sedimentary environments are prospective for classic aeolian placer HMS deposits which
normally host accumulations of valuable heavy minerals such as ilmenite, zircon, rutile and monazite. The
Diwong licence was previously known as the Missole Project was held by the French multinational Eramet.
Eramet drilled some 60 sonic holes on the Project for 1,080m (582 samples) with 39 hand auger holes for 190m
(39 samples) specially targeting rutile and zircon. The drilling intersected thick sequences of sands and confirmed
the presence of rutile and zircon within the valuable heavy mineral assemblage. Eramet discontinued the Project
when it exited Cameroon in 2023 primarily due to the unsuitable setting of the mineralisation within its core
Central Cameroon project Akonalinga (which targeted alluvial placer rutile deposits within the lower lying river
systems).
Figure 3: DY6’s Douala Basin Project comprises 6 licence blocks proximal to the port city of Douala along
Cameroon’s coast.
Page 8
DIRECTORS’ REPORT
Malawi
Tundulu (REE, Phosphate and Gallium)
During the year, the Company announced a review of historical drilling at the Tundulu Rare Earth and Phosphate
project, Malawi, uncovering high-grade gallium mineralisation from surface.
Figure 4: Tundulu Project Location Map and Historical Drill Hole locations over Nathace Hill
Significant intercepts include:
•
74m at 93.26g/t Ga2O3, 1.56% TREO from 72m, including 14m at 202.79g/t Ga2O3 from 89m (TU043),
and the highest grade in all assays intersected within this interval at 310.46 g/t Ga2O3, 5.68% TREO from
97m to 98m;
•
53m at 72.79g/t Ga2O3, 1.02% TREO from surface, including 12m at 145.07g/t Ga2O3 from 25m (TU011);
•
30m at 94.63g/t Ga2O3, 4.03% TREO from surface (TU014);
Page 9
DIRECTORS’ REPORT
•
41m at 64.98g/t Ga2O3, 1.61% TREO from 67m, including 8m at 178.94g/t Ga2O3 from 100m (TU033);
and
•
25m at 64.63g/t Ga2O3, 1.03% TREO from 45m, including 9m at 81.85g/t Ga2O3 from 61m (TU008).
Only ~40% of the highly prospective area has ever been drill-tested. The target areas include Nathace and
Tundulu hills (Figures 1 & 2). Gallium mineralisation is open at depth. Though some of the elevated Ga2O3
responses occur within the saprolite clays (TU014: 0-30m; 30m @ 94.63ppm Ga2O3), others occur at depth within
fresh rock (TU043: 72-146m; 74m @ 93.26ppm) or TU043: 89-103m; 14m @ 202.79ppm Ga2O3. Deeper gallium
potential has not yet been assayed for.
Historical diamond and RC drilling, conducted during 2014 by Mota Engil Minerals & Mining was assayed for
gallium. A total of 4901 assays for gallium were completed with 27.7% of the assays containing >40 g/t Ga2O3.
Samples from drillholes JMT01 to JMT024 (Figure 2) from previous drilling by Japanese International
Cooperation Agency (JICA) in 1980 were not analysed for Gallium. Significant intersections have been calculated
from the significant TREO intersections of grade of >5,000ppm over 5 metres in DY6 announcement of 27th May
2024, and the Ga2O3 results in conjunction with the TREO intersections are set out in Appendix 1 of the
Company’s announcement “Updated Announcement - High Grade Gallium Potential” dated 1 May 2025.
Figure 5: Gallium assayed and non-assayed Historical Drill Hole locations
Page 10
DIRECTORS’ REPORT
In addition, during the year the Company commissioned preliminary metallurgical test work on select bulk
samples from Tundulu to determine the suitability of the Tundulu deposit to produce a separate rare earth and
phosphate concentrate.
Mazimba & Karonga (Base Metals)
During the year, a small reconnaissance sampling and geological mapping programs were undertaken at Mzimba
and Karonga projects. In addition, the Karonga licence area was formally granted.
The Karonga licence covers an area of approximately 36km2 and has the potential for copper mineralisation, as
confirmed from preliminary reconnaissance/surveillance work. Preliminary reconnaissance/ surveillance
sampling work conducted on the licence area during the quarter revealed the occurrence of elevated Cu grades,
with initial portable XRF results ranging from 1.4 to 7.8% Cu in rock. Results are to be verified using standard
laboratory-based XRF analytical assaying methods.
DY6 acquired and completed reprocessing of historic hyperspectral survey data, which has been used to map
areas with high probability for copper mineralisation. The results from this exercise correlate well to the
mineralisation identified in the sampling work. Historic anomalies from regional airborne geophysical
radiometric and magnetic data appear to correlate with both the hyperspectral probability copper
mineralisation mapping and the preliminary sampling reconnaissance work conducted. Exploration for Cu and
other minerals will continue on the licence area.
Ngala Hill (PGE, Cu & Ni)
The Company undertook a reconnaissance soil and rock chip program at the Ngala Hill PGE, Cu & Ni Project to
follow up on known high grade areas and to expand the zone of mineralisation. A total of 52 samples including
soil and rock chips were taken. Assays included: 2.5g/t 2PGE+Au on a pyroxenite sample NGE002, 23% of the
samples returned 0.2 g/t 2PGE+Au. Mineralisation is hosted in variants of pyroxenites in the licence area.
Elevated zinc grade at 3.5% Zn with associated 0.7% Cu on a meta-pyroxenite sample NGE011.
Machinga & Salambidwe
No substantive work was conducted on these Projects during the year. Post financial year end, the Company
announced the commencement of a soil and rock chip sampling program at Machinga to follow up on priority
targets identified through radiometrics.
Page 11
DIRECTORS’ REPORT
Figure 6: Location of the Company’s Projects in Malawi
OUTLOOK
Looking ahead, DY6 is uniquely positioned to deliver shareholder value through a high-quality pipeline of rutile,
HMS, rare earth, gallium, and base metals projects. Ongoing exploration in Cameroon and Malawi is expected
to yield further catalysts in the coming financial year, supported by a strong cash position and an experienced
leadership team.
Page 12
DIRECTORS’ REPORT
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
In the opinion of the Directors there were no significant changes in the state of affairs of the Group that occurred
during the financial period not otherwise disclosed in this report.
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL YEAR
The Company reporting the acquisition and the application for additional ground expanding the landholding of
its Central Rutile Project in Cameroon. The Company also reported initial results of select sampling and auger
drilling at the Central Rutile Project.
The Company also announced a share placement raising $4.625m and various management and in-country
appointments, as noted above.
CORPORATE GOVERNANCE
The Company’s Corporate Governance Statement is available on its website www.dy6metals.com.
LIKELY DEVELOPMENTS AND EXPECTED RESULTS
Likely future developments in the operations of the Group and the expected results of those operations in
subsequent financial years are consistent with those reported for the current period.
ENVIRONMENTAL REGULATIONS
The Company is required to carry out its activities in accordance with the Mining Laws and regulations in the
areas in which it undertakes its exploration activities. The Company is not aware of any matter which requires
disclosure with respect to any significant environmental regulation in respect of its operating activities.
COMPETENT PERSON STATEMENT - CAMEROON
The information contained in this report that relates to geological information and exploration results at the Central Rutile and Douala
Basin Projects, is based on information compiled by Mr Clifford Fitzhenry, a Competent Person who is a Registered Professional Natural
Scientist with the Council for Natural Scientific Professionals (SACNASP). Mr Fitzhenry is the Company’s CEO and has sufficient experience
which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Fitzhenry consents to the inclusion in this announcement of the matters based on his information in
the form and context in which it appears.
The exploration results contained in this report were first announced by the Company on 11 June 2025, 23 June 2025, 11 August 2025,
and 2 September 2025. The Company confirms that it is not aware of any new information or data that materially affects the information
included in these announcements.
COMPETENT PERSON STATEMENT - MALAWI
The information in this report that relates to exploration results, mineral resources or ore reserves at the Malawian projects is based on
information compiled by Mr Allan Younger, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Younger is a
consultant of the Company. Mr Younger has sufficient experience which is relevant to the style of mineralisation and type of deposits
under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the
`Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr Younger consents to the
inclusion of this information in the form and context in which it appears in this report. Mr Younger holds shares in the Company.
The exploration results contained in this report were first reported by the Company in its prospectus dated 3 April 2023 and announced
to ASX on 27 June 2023, 6 July 2023, 12 September 2023, 3 October 2023, 10 October 2023, 26 October 2023, 4 December 2023, 11
December 2023, 15 December 2023, 29 December 2023, 3 January 2024, and 29 April 2025. The results were reported in accordance
Page 13
DIRECTORS’ REPORT
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. The Company
confirms that it is not aware of any new information or data that materially affects the information included in the Prospectus or these
subsequent announcements.
With respect to the Tundulu Project, Mr Younger has not yet visited the site or conducted an in-depth due diligence of the data presented
in this announcement. Mr Younger confirms the information in this market announcement is an accurate representation of the available
data for the exploration areas mentioned herein, but that further investigation is ongoing. The Information in this report that relates to
Exploration Results for the Tundulu Project is extracted from the Company’s announcement titled: “Additional historical drilling results
confirms Tundulu REE potential”, dated 27 May 2024 and announcement dated 29 April 2025. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the above original market announcement.
CAUTIONARY STATEMENT – TUNDULU PROJECT
Information is this release is considered as historical by nature, and while all care has been taken to review previous reports and available
literature, ground testing and confirmation work is yet to be completed by the Company. The historical laboratory analysis was conducted
on a range of drill core by reputable laboratories in South Africa. However, there is no guarantee that these results are representative of
the Tundulu deposit until further sampling, drilling, assaying and processing test work is conducted by the Company. The Company
confirms that it is not aware of any new information or data that materially affects the information included in this release.
Drilling results (Exploration Results) presented in this release have not been reported previously by the former owners and operators of
the Tundulu project. As a result, the reported Exploration Results have not been reported in accordance with the JORC Code 2012 and
may not conform with the JORC Code 2012. A Competent Person has not done sufficient work to disclose the Exploration Results in
accordance with the JORC Code 2012. It is possible that following further evaluation and/or exploration work that the confidence in the
prior reported Exploration Results may be reduced when reported under the JORC Code 2012.
Nothing has come to the attention of the Company that causes it to question the accuracy or reliability of the former owner’s Exploration
Results; but The Company has not independently validated the former owner’s Exploration Results and therefore is not to be regarded
as reporting, adopting or endorsing those results.
Abbreviations
§
HMS = Heavy Mineral Sands
§
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3,
Lu2O3, Y2O3
§
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
§
HREO% = HREO/TREO * 100
§
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
§
P2O5 = Phosphorus pentoxide
Page 14
DIRECTORS’ REPORT
INFORMATION ON DIRECTORS
Mr Daniel Smith
-
Executive Chairman
Qualifications
-
BA, GradDipACG, FCIS, FGIA, RG146
Experience
Interest in Shares and Options
Mr Smith is a chartered governance professional with over 17 years’
primary and secondary capital markets expertise. He is a director
and co-founder of Minerva Corporate, a boutique corporate
services and advisory firm. He has advised on and been involved in
over a dozen IPOs/RTOs on the ASX and AIM.
-
Current directorships
12,115,689 ordinary shares
16,225,000 options (ex $0.08 and ex $0.25)
4,250,000 performance rights (various milestones)
Europa Metals Ltd (AIM:EUZ), QX Resources Ltd (ASX:QXR), Nelson
Resources Ltd (ASX:NES), Rapid Critical Minerals Ltd (ASX:RCM)
Former directorships held in past
three years
-
Alien Metals Ltd (AIM:UFO), Artemis Resources Ltd (ASX:ARV),
Lachlan Star Ltd (ASX:LSA), Oceana Lithium Ltd (ASX:OCN), White
Cliff Minerals Ltd (ASX:WCN)
Mr John Kay
-
Non-Executive Director and Company Secretary
Qualifications
-
LLB, RG146
Mr Kay is admitted to practice as a lawyer in Western Australia and
England & Wales. He is an experienced corporate lawyer and
corporate adviser with over 17 years’ experience in equity capital
markets, M&A and resources gained through both private practice
and inhouse roles in Australia and the UK. He has previously held a
number of non-executive and company secretarial roles for ASX
listed mining and energy companies and has advised on over a
dozen IPOs/RTOs on the ASX.
-
4,171,667 ordinary shares
Experience
Interest in Shares and Options
3,942,500 options (ex $0.08 and ex $0.25)
750,000 performance rights (various milestones)
Nil
Current directorships
Former directorships held in past
three years
-
Nil
Page 15
DIRECTORS’ REPORT
INFORMATION ON DIRECTORS
Dr Nannan He
-
Non-Executive Director
Qualifications
-
PhD Geochemistry
Experience
Interest in Shares and Options
Dr He has over 10 years’ experience in geosciences, chemical
material trading, exploration and resources investment. Via her
investment vehicle, Woodsouth Asset Management, she has been
actively examining exploration and resource projects worldwide and
has built strong networks, particularly in the Southeast Asian
market.
-
Current directorships
1,592,223 ordinary shares
4,611,496 options (ex $0.08 and ex $0.25)
500,000 performance rights (various milestones)
Nil
Former directorships held in past
three years
-
Nil
Mr Myles Campion
-
Non-Executive Director
Qualifications
-
BSc Geology (Hons), MSc Minex
Experience
Mr Campion has over 30 years’ experience in the natural resources
sector, including exploration geology, resource analysis, fund
management, equities research and project and debt financing.
He started his career as an exploration and mining geologist in
Australia covering base metals and gold, that included being the
Project Geologist at LionOre responsible for the exploration,
discovery and BFS completion of the Emily Ann Nickel Sulphide
Mine. Mr Campion’s financial experience ranges from Australian
and UK equities research through to project and debt financing in
London and Fund Manager for the OEIC Australian Natural
Resources Fund for 5 years in Perth.
Interest in S
Share your feedback
Discover