HIGHLIGHTS
Reconnaissance auger and grab sampling programme nearing completion at
the Central Rutile Project, with a detailed soil sampling programme to
commence shortly
Soil sampling programme will be used to rapidly identify areas of higher grade
HM and rutile mineralisation, which will be followed up on with a large auger
drilling campaign in the September quarter
Reconnaissance sampling undertaken across the 5 Central Rutile Project
tenements has identified visible natural rutile from both alluvial and eluvial
(residual) sources
The identification of rutile across the entire tenement package is highly
encouraging and reaffirms the Company’s belief that the region is an emerging,
globally significant rutile province
Samples collected from the reconnaissance program are due to be submitted
for laboratory analysis in the coming weeks, with results expected in the
September quarter
The Company’s reconnaissance program at the Douala Basin HMS Project is
ongoing, with initial results expected in the coming weeks
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce the initial results
from the reconnaissance exploration program at the Central Rutile Project, Cameroon.
Desktop studies incorporating detailed geological mapping, geophysics, and known mineral
occurrences, were used to define initial, high priority targets for ground-truthing. The
reconnaissance programme, which consisted of auger sampling, road-cutting channel
sampling, soil sampling and stream sediment sampling, was successful in identifying heavy
mineral (HM) and natural rutile mineralisation across all five tenements that make up the
Central Rutile project. Rutile nuggets, ranging in size from 1mm+ to 2cm+, were observed in
alluvial and eluvial (residual) sources. Samples collected from the initial exploration
programme are currently being prepped for dispatch to the Company’s laboratory for analysis
in South Africa, with results expected in August 2025.
Cautionary Statement: The Company cautions that, with respect to any visual mineralisation
indicators, visual observations and estimates of mineral abundance are uncertain in nature
and should not be taken as a substitute or proxy for appropriate laboratory analysis. Visual
estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. Assay results from the drilling and sampling programmes will
be required to understand the grade and extent of mineralisation. Initial assay results are
expected in August 2025.
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
Non-executive Chairman, Dan Smith, commented: “The in-country team has done a great job
of mobilising to site so quickly. We are pleased with the initial results from the reconnaissance
program at the Central Rutile project and the confirmation of widespread, natural rutile across
the licences from both residual and alluvial sources. I look forward to the receipt of the assays
in the coming months, as well as results from the ongoing exploration at the Douala Basin
project.”
Technical Consultant, Cliff Fitzhenry, commented: “The Central Rutile project covers a large
(2,140km2) area, so this initial reconnaissance programme has only just scratched the surface
of the potential for this area. We always knew the licences were in the right address, having
the correct underlying geology, deep in-situ weathering profile, and known, historic rutile
occurrences. The solid work of the in-country team, in conjunction with our Senior Exploration
Geologist, Troth Saindi, is already paying dividends. Having achieved our initial goals,
exploration at the Central Rutile project will shift from reconnaissance in nature to that of a
detailed soil sampling programme. This will allow us to achieve greater coverage over the
tenement package and will help to rapidly define zones of higher grade heavy mineral
occurrences, which will be followed up with a large-scale auger sampling programme.
I am excited to get on the ground as soon as possible to help drive the exploration work as
the project story unfolds.”
Reconnaissance exploration at the Central Rutile Project
As announced on 5 June 2025, the Company has commenced reconnaissance auger and
grab sampling programmes at the Central Rutile and Douala Basin HMS projects, Cameroon.
To date, at the Central Rutile Project the Company has completed 3 auger drill holes (refer
Figure 1), collecting 10 samples in the process, as well as collected 42 channel samples from
7 road cutting exposures, 1 surface grab sample and 2 stream sediment samples for analysis
(refer Tables 1-4).
Table 1: Reconnaissance auger drill holes completed to date at the Central Rutile Project showing
maximum visual estimates of HM% from panned concentrate of the 1m samples.
Hole ID
Licence
Coordinate
System
Northing
Easting
EOH
Depth
Max
Visual
Estimate
Comment
GRMAU0001
Nganda
WGS84_32N
417927
748546
2,7m
1-2% HM
Fine grained
HM
430261
183191
2,25m
2% HM
Fine grained
HM and rutile
nuggets
431060
175252
3,0m
1-2% HM
Fine grained
HM
GRMAU0004
GRMAU0006
Nsimbo
WGS84_33N
Cautionary Statement: The Company cautions that, with respect to any visual mineralisation indicators, visual
observations and estimates of mineral abundance are uncertain in nature and should not be taken as a substitute
or proxy for appropriate laboratory analysis. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations. Assay results from the drilling and sampling
programmes will be required to understand the grade and extent of mineralisation. Initial assay results are expected
in August 2025.
Figure 1: Reconnaissance sampling (hand auger, road cutting channel and stream sediment)
locations at the Central Rutile project.
Figure 2: Hand auger drilling team at the drill site for GRMAU0001.
Figure 3: One meter hand auger samples laid out next to the drill site (from hole GRMAU0006).
Figure 4: Road cutting exposure from the GRMBG0001 locality showing a classic deep in-situ
weathering profile (the full surface exposure is ~10m). Note: reconnaissance auger holes ended in the
ferruginous layer. The Company expects HM mineralisation to continue through the mottled and
saprolite zones.
Figure 5: Surface wash showing visible HM on the Kombo licence (GRMGRA0001). The visual
representation of heavy mineral (HM) and rutile mineralisation shown in this release is based on
preliminary visual reconnaissance with no sampling results. Assay results are pending and have not yet
been verified through laboratory analysis. Investors are cautioned that the information is indicative only
and should not be relied upon as a definitive measure of mineralisation or economic potential. Further
exploration and analytical testing are required to confirm the extent, grade, and economic viability of
the mineralisation.
Figure 6: Fine grained HM and rutile grains/nuggets (1-5mm) from panned concentrate of a grab
sample from the site shown in Figure 5 (GRMGRA0001). The visual representation of heavy mineral
(HM) and rutile mineralisation shown in this release is based on preliminary visual reconnaissance with
no sampling results. Assay results are pending and have not yet been verified through laboratory
analysis. Investors are cautioned that the information is indicative only and should not be relied upon
as a definitive measure of mineralisation or economic potential. Further exploration and analytical
testing are required to confirm the extent, grade, and economic viability of the mineralisation.
Figure 7: Fine grained HM concentrate from panned 1m channel sample from the GRMGB0002 locality.
The visual representation of heavy mineral (HM) and rutile mineralisation shown in this release is based
on preliminary visual reconnaissance with no sampling results. Assay results are pending and have not
yet been verified through laboratory analysis. Investors are cautioned that the information is indicative
only and should not be relied upon as a definitive measure of mineralisation or economic potential.
Further exploration and analytical testing are required to confirm the extent, grade, and economic
viability of the mineralisation.
Figure 8: Fine grained HM and rutile nuggets grains (~1mm) from panned concentrate of 1m samples
from the GRMAU0004 auger hole. The visual representation of heavy mineral (HM) and rutile
mineralisation shown in this release is based on preliminary visual reconnaissance with no sampling
results. Assay results are pending and have not yet been verified through laboratory analysis. Investors
are cautioned that the information is indicative only and should not be relied upon as a definitive
measure of mineralisation or economic potential. Further exploration and analytical testing are required
to confirm the extent, grade, and economic viability of the mineralisation.
Figure 9: Course rutile nuggets (1-5mm) from GRAMAU0004. The visual representation of heavy
mineral (HM) and rutile mineralisation shown in this release is based on preliminary visual
reconnaissance with no sampling results. Assay results are pending and have not yet been verified
through laboratory analysis. Investors are cautioned that the information is indicative only and should
not be relied upon as a definitive measure of mineralisation or economic potential. Further exploration
and analytical testing are required to confirm the extent, grade, and economic viability of the
mineralisation.
Figure 10: Coarse rutile nuggets from panned stream sediment concentrate from site GRMST0001.
The visual representation of heavy mineral (HM) and rutile mineralisation shown in this release is based
on preliminary visual reconnaissance with no sampling results. Assay results are pending and have not
yet been verified through laboratory analysis. Investors are cautioned that the information is indicative
only and should not be relied upon as a definitive measure of mineralisation or economic potential.
Further exploration and analytical testing are required to confirm the extent, grade, and economic
viability of the mineralisation.
Figure 11: Rutile nugget (22mm) collected up-stream (UTM_84_32N 739273 408418) from stream
sediment sample GRMST0001. The visual representation of heavy mineral (HM) and rutile
mineralisation shown in this release is based on preliminary visual reconnaissance with no sampling
results. Assay results are pending and have not yet been verified through laboratory analysis. Investors
are cautioned that the information is indicative only and should not be relied upon as a definitive
measure of mineralisation or economic potential. Further exploration and analytical testing are required
to confirm the extent, grade, and economic viability of the mineralisation.
Figure 12 Fine grained HM and rutile grains/nuggets (1-2mm) from panned stream sediment
concentrate from site GRMST0002. The visual representation of heavy mineral (HM) and rutile
mineralisation shown in this release is based on preliminary visual reconnaissance with no sampling
results. Assay results are pending and have not yet been verified through laboratory analysis. Investors
are cautioned that the information is indicative only and should not be relied upon as a definitive
measure of mineralisation or economic potential. Further exploration and analytical testing are required
to confirm the extent, grade, and economic viability of the mineralisation.
Background on the Projects
Central
The Central Rutile Project consists of 5 exploration permits (Nganda, Bounde, Kombo, Alamba
and Nsimbo) under valid applications covering 2,140km2 across an area rapidly emerging as
a globally significant rutile province within Central Cameroon. The project area is
predominantly underlain by kyanite-bearing mica schist bedrock, which is considered the
primary source of rutile. During in-situ weathering, rutile is liberated from the bedrock and
progressively concentrated and upgraded within the overlying saprolite layer. This forms an
in-situ, eluvial saprolite hosted rutile deposit target type deposit analogous to Sovereign
Metal’s Tier 1 Kasiya deposit in Malawi (the world’s largest primary rutile deposit at 1.8 billion
tons at 1.0% rutile).
The exploration model further proposes that subsequent erosion and fluvial transport rework
these materials, concentrating rutile and other valuable heavy minerals into alluvial deposits.
Historical production figures from the area between 1935 and 1955 have recorded some
15,000 tons of high purity (>95 %) rutile being produced from artisanal mining of the alluvial
deposits around Nanga-Eboko. The Central Rutile Project borders Peak Mineral’s Minta Rutile
Project where initial sampling has revealed widespread, high-value mineral assemblages with
valuable heavy minerals (VHM) up to 93% of total heavy minerals (THM) and with the
dominant VHM’s being rutile (up to 69.8%), monazite (up to 35.6%) and zircon (up to 21.5%)
(see PUA Announcement “First systematic exploration programme discovers significant rutile
province in Cameroon” dated 4 February 2025).
Figure 12: DY6’s Central Rutile Project comprises 5 licence blocks which border Peak Mineral’s Minta
Project in Central Cameroon.
Douala
The Douala Basin HMS Project consists of 3 granted exploration permits and 3 exploration
permits under valid applications. The Edea Sud licence is a fully granted permit covering an
area of 440km2 whilst the 5 licence applications (Mbanga, Maleke, Mungo, Diwong, and
Mbongo) cover an area of 2,140km2 giving the total project package a land endowment of
2,580km2 across the Douala Basin of Western Cameroon. The tenements are all located within
50km of the deep-water port city of Douala.
Geologically the Douala Basin is a coastal sedimentary basin consisting of a package of
mainly marine sedimentary formations of Cretaceous to Quaternary in age. Thick, preserved
sequences of sandy material are known to exist across the tenement package and these are
thought to represent palaeo-placer coastline dune deposits. These sedimentary environments
are prospective for classic aeolian placer HMS deposits which normally host accumulations
of valuable heavy minerals such as ilmenite, zircon, rutile and monazite. The Diwong licence
was previously known as the Missole Project was held by the French multinational Eramet.
Eramet drilled some 60 sonic holes on the Project for 1,080m (582 samples) with 39 hand
auger holes for 190m (39 samples) specially targeting rutile and zircon. The drilling intersected
thick sequences of sands and confirmed the presence of rutile and zircon within the valuable
heavy mineral assemblage. Eramet discontinued the project when it exited Cameroon in 2023
primarily due to the unsuitable setting of the mineralisation within its core Central Cameroon
project Akonalinga (which targeted alluvial placer rutile deposits within the lower lying river
systems).
Figure 13: DY6’s Douala Basin Project comprises 6 licence blocks proximal to the port city
of Douala along Cameroon’s coast.
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith
Mr John Kay
Non-Executive Chairman
Director & Company Secretary
dan.smith@dy6metals.com
john.kay@dy6metals.com
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Central Rutile Project, is based on information compiled by Mr Clifford Fitzhenry, a
Competent Person who is a Registered Professional Natural Scientist with the Council for Natural
Scientific Professionals (SACNASP). Mr Fitzhenry is a consultant to the Company and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Fitzhenry consents to the inclusion in this announcement of the matters based on his information in
the form and context in which it appears.
The information in this announcement that relates to historical exploration results at the Central Rutile
and Douala Basin projects in Cameroon, were first reported by the Company on 24 April 2025. The
Company confirms it is not aware of any new information or data that materially affects the information
included in the original announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Appendix: Tenement Details
Tenement
Name
Project
Name
Mungo
Douala
Mbanga
Douala
Maleke
Douala
Diwong
Douala
Mbongo
Douala
Edea Sud
Douala
Nganda
Central
Nsimbo
Central
Kombo
Central
Bounde
Central
Alamba
Central
Holder
Rhino
Resources Ltd
Rhino
Resources Ltd
Rhino
Resources Ltd
Rhino
Resources Ltd
Rhino
Resources Ltd
Rhino
Resources Ltd
Gorilla Mining
Ltd
Gorilla Mining
Ltd
Gorilla Mining
Ltd
Gorilla Mining
Ltd
Gorilla Mining
Ltd
Application
Date
Area
Granted
Date
29/06/2022
483Km2
14/12/2022
29/06/2022
468Km2
14/12/2022
30/01/2024
491Km2
N/A
30/01/2024
484Km2
N/A
30/09/2022
214Km2
N/A
29/06/2022
440Km2
14/12/2022
19/02/2025
396Km2
N/A
19/02/2025
495Km2
N/A
19/02/2025
460Km2
N/A
19/02/2025
425Km2
N/A
19/02/2025
348Km2
N/A
Table 2: Reconnaissance channel samples completed to date at the Central Rutile Project showing maximum
visual estimates of HM% from panned concentrate of the 1m samples across the channel length.
Max
Coordinate
Channel
Hole ID
Licence
Northing Easting
Visual
System
Length
Estimate
Comment
GRMGB 0001
Nganda
WGS1984_32N
400512
757809
7.4
1-2% HM
Fine grained HM
GRMGB 0002
Nsimbo
WGS1984_33N
429379
191280
3.65
1-2% HM
Fine grained HM
GRMGB 0003
Nsimbo
WGS1984_33N
432461
179671
5.35
1-2% HM
Fine grained HM
GRMGB0004
Nsimbo
WGS1984_33N
431260
183043
6.4
1% HM
Fine grained HM
GRMGB0005
Alamba
WGS1984_33N
431949
167591
4.8
0-1% HM
Fine grained HM
GRMGB0006
Alamba
WGS1984_32N
439861
819510
5.8
0-1% HM
Fine grained HM
GRMGB0007
Nsimbo
WGS1984_32N
427676
192262
3.5
0-1% HM
Fine grained HM
Table 3: Reconnaissance grab samples completed to date at the Central Rutile Project showing maximum
visual estimates of HM% from panned concentrate.
Hole ID
Licence
Coordinate
System
Northing
Easting
GRMGRA
0001
Kombo
WGS1984_32N
408093
797044
Max Visual
Estimate
Comment
5-8% HM
1-2% Rutile
Abundance of heavy
mineral with many
visible rutile grains
Table 4: Reconnaissance stream sediment samples completed to date at the Central Rutile Project
showing maximum visual estimates of HM% from panned concentrate.
Hole ID
Licence
Coordinate
System
Northing
Easting
GMRST0001
Bounde
WGS1984_32N
407024
740998
GMRST0002
Kombo
WGS1984_32N
425529
800862
Max
Visual
Estimate
5-8% HM
3-5%
Rutile
5-7% HM
1-2%
Rutile
Comment
Abundance of visible
rutile grains (2-7mm) fine
to medium, angular in
shape
Visible rutile, subangular
in shape, fine to medium
grain size
JORC Code, 2012 Edition – Table 1 report
Section 1 – Sampling Techniques and Data
Criteria
Sampling Techniques
JORC Code explanation
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Commentary
Grab samples
•
Grab samples were collected within the
tenement. The grab samples can be
subjected to bias.
•
Industry-standard practice was used in the
processing of samples for assay
Auger Drilling
•
Samples collected using a manual hand
auger with a 75 mm diameter bit.
•
Drilling targeted weathered saprolite
profiles
•
Samples taken at regular 1 m intervals
downhole from surface to refusal
(maximum ~3 m).
•
No lithological (horizons) were crossed in
sampling.
•
Industry-standard practice was used in the
processing of samples for assay.
Channel sampling
•
Channel samples were collected along
exposed road cuttings
•
Channels were cleared of loose debris,
weathered material, and vegetation prior to
sampling.
•
Samples collected at consistent 1 m
intervals
•
no lithological (horizons) were crossed
while sampling
•
Industry-standard practice was used in the
processing of samples for assay.
Stream sediment sampling
•
Sediment samples were collected from
active high and low stream channels.
•
Targeted locations included inner bends,
sediment traps
•
~1 kg of sediment collected using a shovel
or trowel.
•
Sample information was recorder at the
time of sampling included, colour, lithology,
texture, stream location and mineralization.
•
Coarse clasts and organic matter were
removed
•
Industry-standard practice was used in the
processing of samples for assay
Historical
•
No historical sampling has been carried out
Cautionary statement.
The visual representation of heavy mineral
(HM) and rutile mineralisation shown in this
release is based on preliminary visual
reconnaissance with no sampling results. Assay
results are pending and have not yet been
verified through laboratory analysis. Investors
are cautioned that the information is indicative
only and should not be relied upon as a
definitive measure of mineralisation or
economic potential. Further exploration and
analytical testing are required to confirm the
extent, grade, and economic viability of the
mineralisation
Drilling techniques
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc)
Drill sample recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
Sub- sampling
techniques and
sample preparation
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Auger drilling
•
Vertical hand auger drilling conducted
using a manually rotated auger with 75 mm
diameter bit.
•
Drilling continued until blade refusal,
typically at ferruginous layer.
•
Maximum hole depth varied by terrain and
ferruginous layer (generally <3 m).
•
No drilling fluids, casing, or downhole
equipment used.
•
Drilling suitable for near-surface
geochemical sampling in deeply weathered
terrain.
Auger Drilling
•
Hand auger drilling does not provide
continuous core; recovery is based on
volume retrieved per 1m interval.
•
Sample quality and recovery were
monitored in the field and deemed
acceptable; any compromised samples
were noted and excluded if necessary.
•
No specific measures (e.g., twin holes,
weights, or drilling additives) were used to
improve recovery, as hand auger is a basic
geochemical technique.
Grab samples
•
Sample information recorded at the time of
sampling included colour, lithology, texture,
moisture and visible HM mineralization.
•
GPS coordinates recorded at each site
using handheld GPS (±5 m accuracy).
Auger Drilling
•
Sample information was recorded at the
time of sampling included, colour, lithology,
texture, moisture and visible HM
mineralization.
•
GPS coordinates recorded at each site
using handheld GPS (±5 m accuracy).
Channel sampling
•
Sample information was recorded at the
time of sampling included, colour, lithology,
texture, moisture and visible HM
mineralization.
•
GPS coordinates recorded at each site
using handheld GPS (±5 m accuracy).
Stream sediment sampling
•
Sample information was recorder at the
time of sampling included, colour, lithology,
texture, stream location and visible HM
mineralization.
•
GPS coordinates recorded at each site
using handheld GPS (±5 m accuracy).
Auger, Channel, Streams and Grabs
samples were panned in the field
•
Material was manually panned in the field
to produce a heavy mineral concentrate
(~200g).
•
Panning aimed to concentrate rutile and
other heavy minerals for visible
assessment
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have
been established
Verification of
sampling and
assaying
Historical data
•
XRF analysis as per industry standard.
Total analysis.
•
Total of 14 blanks included in assay run of
621 samples. And 25 duplicates. No
external laboratory checks recorded. 7
YOOA standards for HMS work. 18 ERA
standards for magnetic separation work.
Total of 37 standards and 9 blanks
included in XRF sample run. No in-depth
analysis of results is presented.
•
Not applicable for the reconnaissance data
The verification of significant intersections by
either independent or alternative company
personnel.
•
•
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
No third-party verification recorded.
No twinned boreholes were drilled.
Not recorded in the documentation
provided to the consultant.
No adjustments to data have been
recorded.
Discuss any adjustment to assay data.
Location of data
points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Data spacing and
distribution
Quality and adequacy of topographic control
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
Hand-held Garmin G65S GPS.
•
UTM WGS84 Sector 32N.
•
UTM WGS84 Sector 33N.
Historical
•
DGPS used on 5 test collars to compare
hand-held GPS. Mean X and Y error +/2m. Mean elevation (Z) error+/-13.5m.
•
•
•
Hole and hand auger spacing irregular
along accessible tracks. South Sector – 70
b/h per 100 km2. North Sector 15 b/h per
100 km2.
Not applicable at this time.
Samples were composited on length
weighted basis to calculate weighted
average grades downhole
Share your feedback
Discover