Preliminary metallurgical testwork - Tundulu
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
14 August 2025
Metallurgical Update – Tundulu Rare Earth
Project
HIGHLIGHTS
Preliminary metallurgical testwork undertaken on a 120kg composite sample from
a high-grade historic trench (TUTR10) at Tundulu.
The composite trench sample returned grades of 1.88% TREO and 9.07% P2O5.
The REE mineralogy is dominated by bastnaesite and synchysite which are finely
distributed in an apatite carbonate gangue, closely resembling the mineralogy of
the nearby Songwe Hill Project (Mkango Resources), thereby supporting regional
metallurgical familiarity.
Flotation testwork undertaken by DY6 to date has been limited, with only 16
flotation tests undertaken. The Company considers that through further testwork,
it will be possible to achieve a concentrate grade suitable for treatment via a
centralised hydrometallurgical plant.
The elevated phosphate grades of the deposit are also amenable to being
upgraded into a flotation concentrate, thereby providing the potential opportunity of
developing a fast and cheap direct fertiliser product from the near-surface high
grade phosphate zones within the deposit. This offers a staged approach to overall
project development from an initial low risk and low CAPEX investment.
Bioavailability test work targeting phosphate-rich rocks, in order to determine the
solubility of phosphate in the samples and to understand its potential for direct
fertilization, showed excellent P solubility (using 2% citric acid) of over 40%, with
one test returning solubility of 81%. This is above the industry threshold of 9.4%
P2O5 solubility using citric acid as the reagent in the acid leach process.
Ongoing workstreams to include additional trenching and sampling for further
metallurgical testwork, as well as follow-up sampling on high-grade gallium zones,
are currently being planned for the project.
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to report the results from ongoing
preliminary metallurgical testwork at the Tundulu REE & Phosphate carbonatite project in Malawi. Under
the guidance of Gavin Beer at Met-Chem Pty Ltd (“Met-Chem”) and Lu Zhang at MinPro Consulting,
the Company undertook preliminary metallurgical testwork on a 120kg composite sample from a highgrade historic trench (TUTR10) at Tundulu at Auralia Metallurgy in Perth, Australia.
CEO, Cliff Fitzhenry, commented: “These preliminary metallurgical testwork results, while in no way
exhaustive, are encouraging. The fine-grained nature of the dominant REE minerals (bastnaesite and
synchysite) hosted within an apatite carbonate gangue has highlighted the need to undertake additional
testwork to produce a high grade concentrate suitable for processing within a hydrometallurgical plant.
Additionally, the high phosphate grades lend a co-product phosphoric acid grade flotation concentrate
opportunity. We are confident that, with carefully planned follow-up testwork we will be able to further
unlock the significant co-product opportunity that exists at Tundulu.”
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
Tundulu REE Project
Tundulu comprises several hills in a ring structure around a central vent called Nathace Hill, where the
majority of the historic surface sampling and drilling was undertaken. The predominant geology at
Nathace Hill is REE apatite hosting carbonatites along with feldspathic breccia and it comprises a large
inner agglomerate vent. Mineral rich carbonatite also occurs at Tundulu Hill, east of Nathace, and at
Makhanga Hill, west of Nathace, and is previously unexplored and prospective for REEs and niobium
mineralisation.
Figure 1: Map of Tundulu license area (EL0731)
REE mineralisation remains open towards southern and western directions from Nathace Hill and
potentially extends beyond the boundaries of the previously established mineralised area over Tundulu
Hill. Initial indications of mineralisation appear to be high in valuable magnet rare earth elements
(MREEs) with low radioactive uranium (U) and thorium (Th) content. This compares favourably to Lynas
Rare Earths’ Mount Weld Central Lanthanide Deposit where Th and U concentrations in the ore are
approximately 660 ppm and 25 ppm respectively. 1
In addition to high-grade rare earths and phosphate, a review of historical drill results at Tundulu
identified the presence of high-grade gallium (Ga) mineralisation from surface. Significant intercepts
1 Mt Weld Rare Earths Project Mine Closure Plan March 2021, Appx G - Mine Closure Plan.pdf (epa.wa.gov.au)
dy6metals.com | ASX:DY6
2
range from 25m to 74m mineralised zones grading at a range of 64.63g/t Ga2O3 to 310.46g/t Ga2O3
with TREO grades ranging from 1.03% to 5.68% within portions of the zones.
Metallurgical Testwork Overview
Under the guidance of MinPro and Met-Chem, a total of 63 metallurgical samples were collected from
37 sample locations (Table 1) along high-grade historic trench (TUTR10) at Tundulu 2 (Figure 2).
Sample results returned up to 3.35% TREO and 27.5% P2O5 (average of 0.85% TREO and 8.26% P2O5)
over the sampled 83m length of trench TUTR10 (Figure 2). Undetectable to very low levels of
deleterious elements including mercury, lead and cadmium in the P-rich rocks confirms the exceptional
grade quality of the phosphate at Tundulu.
The sampling is representative of the mineralised bastnaesite and apatite carbonatite rock types
exposed within the trench. Select samples were used to form a 120kg composite for preliminary
metallurgical analysis.
Figure 2: Map of Tundulu license area (EL0731) showing location of Trench TUTR10.
Sample Selection and Composition
Four bags of pre-crushed sample material were used for this testwork program and this material was
deemed representative of the whole orebody of the Tundulu deposit with relatively high phosphorus
pentoxide (P2O5) and total rare earth oxides (TREO) grades.
2
3
Refer ASX Announcement dated 17 October 2024 titled “High-grade REE & P2O5 trench results at Tundulu to assist with metallurgy”
Refer ASX Announcement dated 29 April 2025 titled “High Grade Gallium Potential discovered at Tundulu Project”
dy6metals.com | ASX:DY6
3
Assay and Mineralogy
The Master Composite Sample (AM246) returned a TREO grade of 1.88%, a neodymium and
praseodymium oxide (NdPrO) grade of 0.29%, and a P2O5 grade of 9.07%.
One Quantitative X-ray Powder Diffraction (XRD) test was performed on the Master Composite Sample
to quantify the mineralogy and the results are summarised below:
•
•
•
•
•
REE mainly hosted in synchysite and bastnaesite.
Main phosphate mineral identified to be apatite.
Major minerals include quartz, apatite, dolomite/ankerite, calcite and goethite.
Iron hosting mineral mainly goethite.
The mineralogy suggests an apatite/Ca-carbonates system and REE seem to intergrow within
the apatite.
Flotation Testwork
A sighter flotation testwork program was performed on the composite sample with the aim to produce
separate REE and phosphate concentrates or a combined REE and phosphate concentrate. The
flotation tests were undertaken with different flotation reagents and dosage rates, different circuit
configurations and feed grind sizes.
Overall, the flotation testwork yielded promising results with >85% TREO and >90% P2O5 recoveries
achieved. However, tests to date could not produce a high grade concentrate due to the mineralogy
and fine-grained nature of the target minerals. The results to date suggested similar mineral
associations of this sample to historical samples analysis, that is, the REE bearing minerals
(bastnaesite and synchysite), occur as fine fibrous crystals amongst the interstitial quartz and calcite
and is closely associated with apatite. Given the reasonably high TREO and P2O5 grade, the Company
believes there is significant potential to further improve the flotation performance and concentrate
grade.
Further collector and depressants screening tests should be carried to confirm the most suitable
reagents combination for the rejection of Ca-carbonate, iron and silica minerals.
While some mineralogical understanding exists, further mineralogical analysis is recommended for both
the head sample flotation products to better assist in designing subsequent metallurgical testing.
Recommendations for ongoing testwork
The future work plan recommended by the Company’s consultants includes:
1. Undertaking a detailed mineralogical analysis using quantitative modal techniques such as
QEMSCAN and TIMA.
2. Expanding the beneficiation testwork program, specifically with regards to ore preparation (ore
sorting, desliming etc) prior to flotation.
3. Commence sighter concentrate refining (i.e. hydrometallurgy) testwork to identify opportunities
and limiting factors associated with the Tundulu mineralisation.
-ENDSThis announcement has been authorised by the Company Secretary.
dy6metals.com | ASX:DY6
4
More information
Mr Daniel Smith
Mr Cliff Fitzhenry
Executive Chairman
Chief Executive Officer
dan.smith@dy6metals.com
Clifford.fitzhenry@dy6metals.com
Competent Persons Statement
The Information in this announcement that relates to exploration results, mineral resources or ore
reserves is based on information compiled by Mr Allan Younger, who is a Member of the Australasian
Institute of Mining and Metallurgy. Mr Younger is a consultant of the Company. Mr Younger has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration and
to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of
the `Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the
JORC Code). Mr Younger consents to the inclusion of this information in the form and context in which
it appears in this announcement. Mr Younger holds shares in the Company.
The information in this release that relates to metallurgical testwork is based on information compiled
and / or reviewed by Mr Gavin Beer who is a Member and Chartered Professional of The Australasian
Institute of Mining and Metallurgy. Mr Beer is a consulting metallurgist with sufficient experience
relevant to the activity which he is undertaking to be recognised as competent to compile and report
such information. Mr Beer consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears in this announcement. Mr Beer does not hold shares in the
Company.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Abbreviations
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3,
Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
HREO% = HREO/TREO * 100
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
MREE=Nd, Pr, Dy, Tb
P = Phosphorus
P2O5 = Phosphorus pentoxide
dy6metals.com | ASX:DY6
5
Table 1: DY6 Rock Chip Sample Locations & Individual Assay Results – Tundulu Project
Sample ID
Easting
Northing
PHA0006
PHA0007
PHA0008
PHA0009
PHA0010
PHA0011
PHA0012
PHA0013
PHA0014
PHA0015
PHA0016
PHA0017
PHA0018
PHA0019
PHA0021
PHA0022
PHA0023
PHA0024
PHA0025
PHA0026
PHA0027
PHA0028
PHA0029
PHA0030
PHA0031
PHA0032
PHA0033
PHA0034
PHA0035
PHA0036
PHA0037
PHA0039
PHA0040
PHA0041
PHA0042
PHA0043
PHA0044
801329
801331
801333
801335
801337
801338
801340
801342
801344
801346
801348
801350
801352
801354
801356
801358
801360
801362
801364
801366
801367
801369
801371
801373
801375
801377
801383
801385
801387
801389
801391
801393
801394
801396
801398
801400
801402
8280169
8280169
8280168
8280168
8280167
8280167
8280166
8280166
8280165
8280165
8280164
8280164
8280163
8280163
8280162
8280162
8280161
8280161
8280160
8280160
8280159
8280159
8280158
8280158
8280157
8280157
8280155
8280154
8280154
8280153
8280153
8280152
8280152
8280151
8280151
8280150
8280150
La
(ppm)
1464
91.1
1661
4143
1290
1325
675
820
1069
436
690
1418
1610
1617
657
1528
526
644
190
232
1815
3268
1834
1831
1845
1854
4853
7949
827
1246
1014
1289
1491
10000
2429
2614
2514
Ce
(ppm)
1949
167
2355
5087
2013
1746
881
1135
1664
682
1204
2925
3119
2450
1225
2061
976
1171
394
504
3442
4446
2970
3481
3554
2766
5614
8553
1358
2062
1640
2006
2523
10000
3828
3933
3814
Dy
(ppm)
26.76
4.56
150
196
173
244
41.7
91.86
162
53.17
172
235
419
202
185
224
86.92
119
19.03
98.44
106
98.94
137
133
87.29
135
122
96.58
48.75
85.89
42.55
60.57
61.89
211
123
153
130
Eu
(ppm)
14.68
2.45
47.52
54.34
54.06
65.54
11
30.46
50.07
14.82
45.87
77.96
111
55.94
43.71
54.88
24.25
29.34
5.07
23.13
51.24
40.92
52.83
55.41
53.56
57.63
64.83
56.8
18.58
30.61
17.59
24.45
25.4
147
62.06
61.01
58.81
Nb
(ppm)
1298
244
595
4037
658
785
276
504
388
262
854
2151
2005
2610
196
591
408
542
218
361
270
295
397
404
2514
216
77
77
22
94
69
92
98
109
194
243
261
Nd
(ppm)
735
68
890
1529
868
847
237
533
752
242
508
1511
1595
1098
510
899
372
424
117
195
1530
1329
1252
1414
1629
1311
1699
2091
427
673
515
571
737
4985
1769
1635
1671
Pr
(ppm)
248
19.96
284
543
258
237
78.03
151
214
68.37
132
416
440
330
135
265
106
123
35.71
50.49
460
476
387
450
479
371
583
812
133
204
160
182
234
1000
523
504
504
Sm
(ppm)
69.2
9
161
196
175
199
38.1
102
160
47.8
136
275
335
183
126
171
73.8
86
17.5
57.5
205
154
186
206
230
222
249
225
65.7
107
69.5
85.3
96.8
628
259
242
240
Tb
(ppm)
6.17
0.9
27.82
33.89
31.53
43.43
7
16.89
29.62
9.42
30.01
41.82
73.52
35.22
31.79
37.94
16
21.25
3.15
17.74
22.05
20.33
26.91
26.31
18.76
26.86
25.56
20.98
9.11
16.28
8.29
11.99
12.04
51.45
24.6
28.41
25.66
Y
(ppm)
110
24.6
622
852
735
1009
191
386
653
223
704
1129
1645
740
702
840
350
435
81.2
368
410
377
490
496
301
465
415
336
182
319
167
218
245
647
435
534
441
P2O5
wt%
2.72
0.72
11.96
17.03
12.29
16.34
3.83
5.94
10.17
3.66
12.04
18.43
27.53
11.81
10.71
12.6
4.98
6.55
1.6
5.62
6.01
5.99
8.37
7.8
4.8
7.17
5.87
4.58
2.92
6.82
7.6
6.29
7.02
7.17
5.62
9.41
5.83
TREO
(ppm)
5,610
477
7,753
15,539
7,057
7,299
2,673
4,099
6,044
2,237
4,681
10,151
11,961
8,406
4,655
7,671
3,198
3,871
1,075
2,029
9,891
12,461
9,079
10,003
10,052
8,924
16,603
24,355
3,782
5,867
4,455
5,469
6,649
33,597
11,601
11,944
11,540
dy6metals.com | ASX:DY6
6
Annexure 1 A: JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
•
Drilling
techniques
Drill sample
recovery
Logging
Field rock chip samples were taken by field staff from outcrops utilizing a
geo-pick and hand tool. Bulk samples from historical trench TUTR10
were collected, with material pre-crushed to -10mm and homogenised
prior to delivery to the lab.
•
Sample representivity was confirmed by taken samples on a 83m long
trench on dip for all the representative hosting lithologies & lithological
zones on the orebody subcropping & outcropping to surface.
•
No recent drilling is utilised on this program or reported in this
announcement.
•
No recent drilling reported in this announcement. Therefore, no drill
sample recovery to report.
•
Qualitative geological logging of rock chips was completed in the field,
dy6metals.com | ASX:DY6
7
Criteria
JORC Code explanation
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Commentary
•
and the completed rock chips log supported the metallurgical studies
or test work, which the objective of this sampling exercise.
Photographs of the individual rock chip samples were taken before
crushing and compositing.
•
The sampling technique used to obtain rock chip samples from
outcrops manually is in line with industry standards and standard
exploration practices
•
The samples were combined to form one single composite which was
crushed to 100% passing 3.35mm and homogenised to form the
Master Composite Sample, designated as “AM246 Master
Composite”.
•
This composite sample representative of all the in situ hosting
lithologies in the orebody.
•
As a Quality Control procedure to maximise representativity of
samples, the samples were homogenised after crushing, then
composited. The final 120 kg was a split from the well homogenised
bulk sample.
• The pXRF analysis technique used to test / analyse the samples
inhouse is considered partial.
• Two subsamples of the Master Composite Sample were submitted for
head assay analysis for REE and other key elements at Auralia
Metallurgy laboratory. This technique completed at Auralia Laboratory
in Perth included - REO+Y, U, Th, K, Na, Fe, P, Al, Ca, Si, Mg, Sr,
Ba, Mn, S, Ti, Ta, Nb, Sc, & F and is considered a total technique.
• Details and parameters of the pXRF machine used:
o Make & Model: Olympus Vanta C Series
o Profile used is Geochem 3 (comprising of 3 test beams)
o Reading Times for:
• Beam 1: 20 seconds
dy6metals.com | ASX:DY6
8
Criteria
JORC Code explanation
Commentary
• Beam 2: 20 seconds
• Beam 3: 10 seconds
o Calibration Factors Applied & Derivation
• No calibration or user factor applied
• Accuracy is within +/- 3 sigma
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• No drilling undertaken therefore no verification of sampling
intersections required.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
• Sampling was of a reconnaissance nature only and was designed to
achieve unbiased sampling.
• Albeit not to be used in Mineral resource Estimation, all rock chip
sample locations determined by handheld GPS using WGS 84 datum
in Zone 36S.
• Individual sample collection points spaced at 2m interval from each
other over the 83m trench.
• Sample spacing covered all the ore hosting lithologies & zones,
therefore sufficient to establish both geological & grade continuity,
however not suitable for Mineral Resource & Ore Reserve estimation
because these are rock chip samples.
• Sample compositing was applied, all individual crushed samples
composited to one master composite before dispatch to the laboratory
for metallurgical test work.
• No drilling reported in this announcement.
• Samples were bagged in the field, labelled and dispatched to DY6
Metals core & sample processing warehouse by DY6 staff.
dy6metals.com | ASX:DY6
9
Criteria
JORC Code explanation
Commentary
• A Chain of Custody was completed and signed by the dispatcher of
samples in the field and the receiver of the samples at the sample
processing warehouse.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews have been undertaken by DY6 Metals staff.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• New Granted Exploration Licence No EL0731/24 for Tundulu. Licence
is wholly owned by DY6 Metals Ltd through Malawian vehicle Green
Exploration Ltd (GEL).
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties.
• 1956: Anglo American Corporation completed 10 trenches and drilled
9 drillholes totalling 260m
• 1970: Geological Survey of Nyasaland drilled 5 diamond holes at 450
on the eastern side of Nathace hill
• 1986 – 1988: JICA (Japan International Cooperation Agency):
o Collected 152 rock chip samples
o Completed 500m of trenching
o Drilled 27 vertical holes totalling 1350m up to 50m depth on
Nathace Hill
• 2014: Mota Engil drilled a combination of 55 RC and diamond
drillholes at a total meterage of 7002m
Geology
• Deposit type, geological setting and style of mineralisation.
•
• No known impediments to jeopardise licence to operate.
The Tundulu Complex is a carbonatite intrusion on the south eastern
shore of Lake Chilwa in Southern Malawi and forms part of the Chilwa
dy6metals.com | ASX:DY6
10
Criteria
JORC Code explanation
Commentary
Akaline Province.
Drill hole
Information
Data
aggregation
methods
Relationship
between
mineralisation
widths and
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
•
The Complex is a ring structure that intruded into the Basement
Complex country rocks comprising granite and gneisses.
•
The Apatite – carbonatite and bastnaesite/ synchysite – carbonatite
hosts the economically important phosphate, Rare Earth Elements
and other potential minerals such as gallium.
• No recent drilling undertaken and therefore no drillhole information is
being reported in this announcement.
• No data aggregation methods are being used.
• No recent drilling undertaken and therefore no mineralisation widths
have been reported in this announcement.
dy6metals.com | ASX:DY6
11
Criteria
JORC Code explanation
intercept
lengths
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Balanced
reporting
Other
substantive
exploration
data
Further work
Commentary
• Location maps of project and samples taken are within the release
with location details contained.
• The reporting of exploration results is considered balanced by the
competent person. The locations of samples are included in this
release.
• Metallurgical test work results for