Half Year Accounts
Released
Released
Announcement PDF
ABN 91 663 592 318
FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2023
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Contents
Corporate Information...................................................................................................................................... 2
Directors’ Report .............................................................................................................................................. 3
Auditor’s Independence Declaration .............................................................................................................. 22
Consolidated Statement of Profit or loss and other comprehensive income................................................. 23
Consolidated Statement of Financial Position ................................................................................................ 24
Consolidated Statement of Changes in Equity................................................................................................ 25
Consolidated Statement of Cash Flows .......................................................................................................... 26
Notes to the Financial Statements ................................................................................................................. 27
Directors’ Declaration ..................................................................................................................................... 32
Auditor’s Independent Review Report ........................................................................................................... 33
Page 1
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Corporate Information
This financial report includes the consolidated financial statements of DY6 Metals Ltd and its controlled
entities (‘Group’). The Group’s functional presentation currency is AUD ($).
A description of the Group’s operations and of its principal activities is included in the review of operations
and activities in the Director’s Report.
Directors
Mr Daniel Smith – Non-Executive Chairman
Dr Nannan He – Non-Executive Director
Mr Myles Campion – Non-Executive Director
Mr John Kay – Non-Executive Director
Chief Executive Officer
Mr Lloyd Kaiser
Company Secretary
Mr John Kay
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
Principal Place of Business
Level 8, 99 St Georges Terrace
Perth WA 6000
Stock Exchange
Australian Securities Exchange
Level 40, Central Park
152-158 St George’s Terrace
Perth WA 6000
ASX Code: DY6
Share Registry
Computershare Investor Services
Level 17, 221 St Georges Terrace
Perth WA 6000
Website
www.dy6metals.com
Auditors
Moore Australia Audit (WA)
Level 15, 2 The Esplanade
Perth WA 6000
Solicitors
HWL Ebsworth
Level 20, 240 St Georges Terrace
Perth WA 6000
Page 2
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Directors’ Report
The directors present their report on the Group at the end of, or during, the half-year ended 31 December
2023.
Directors
The persons who were directors of the Group during the half-year and up to the date of this report are:
Mr Daniel Smith (Non-Executive Chairman)
Dr Nannan He (Non-Executive Director)
Mr Myles Campion (Non-Executive Director)
Mr John Kay (Non-Executive Director)
Results
The statement of profit or loss and other comprehensive income shows a net loss for the half-year ended 31
December 2023 of $756,921 (31 December 2022: $38,933).
Review of Operations for the Half-Year ended 31 December 2023
Machinga HREE & Nb Project
During the half-year the Company completed a maiden reverse circulation (“RC”) and diamond drilling (“DD”)
campaign at its flagship Machinga Project (Northern Zone) in southern Malawi for a total of 4,543m. In
addition, adjoining ground at Machinga which was previously under application, was granted increasing the
total area at Machinga to 197km2.
Results from recent drilling to date confirm a strongly mineralised hydrothermal breccia system striking NWSE and dipping shallowly ~35° to the NE. Pleasingly, very high-grade zones have been intersected from the
diamond drill holes, as well as the suggestion of the mineralised zones thickening at depth and continuous
into the new licence area NE of the recent drilling. Significant drill intercepts received from the final batch of
assays are included in DY6’s ASX Announcement dated 29 December 2023. Significant intercepts include:
•
•
•
•
15.1m @ 1.01% TREO, 0.36% Nb2O5 from 23.9m (3.71% DyTb/TREO) incl. 4m @ 1.75% TREO, 0.63%
Nb2O5 from 33m (3.8% Dy/Tb/TREO) (MDD007);
9m @ 0.70% TREO, 0.3% Nb2O5 from 3m (3.84% DyTb/TREO) incl. 2m @ 1.2% TREO, 0.58% Nb2O5
from 6m (3.64% Dy/Tb/TREO) and 5.2m @ 1.61% TREO, 0.66% Nb2O5 from 41.4m (3.99% DyTb/TREO)
incl. 1m @ 2.67% TREO, 1.01% Nb2O5 from 44m (3.9% Dy/Tb/TREO) (MDD006);
6.1m @ 1.09% TREO, 0.4% Nb2O5 from 22.5m (3.78% DyTb/TREO) (MDD004);
and
9m @ 1.11% TREO, 0.41% Nb2O5 from 41m (3.72% DyTb/TREO) incl. 3m @ 1.56% TREO, 0.49% Nb2O5
from 45m (4.1% Dy/Tb/TREO) (MDD008).
(Results returned an average of 29% HREO:TREO and 3.6% DyTb:TREO at a cutoff grade of >0.25%TREO)
Diamond drill holes MDD006, MDD007 and MDD008 were drilled downdip to obtain sufficient sample
material to initiate the metallurgical test work program in Q1, 2024. The assay results are positive and
significant for the Company as they continue to demonstrate continuity of mineralisation down dip and along
strike of Machinga with excellent width and grade of mineralisation for a heavy rare earth rich deposit. As
part of the upcoming metallurgical test work program, using core from this campaign for mineral
Page 3
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
characterisation, the Company will assess the amenability of the mineralisation to be treated through a
relatively simple beneficiation process.
Figure 1. Machinga Project location in Southern Malawi (U radiometric).
The diamond drill program consisted of 5 holes to 150m and 3 holes to 50m depths to determine the
structural setting and geology of the Machinga deposit and to obtain material for mineralogical investigation
and commence preliminary metallurgical test work.
The first 5 holes were to understand the geological nature of the deposit, its structural configuration and
obtain contextual data to the results of the RC drillholes, both recent and historical.
Page 4
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Figure 2. Drill collar locations at Machinga North prospect – 8 DD hole collars.
The diamond holes confirmed the shallow northeasterly dips (Figure 3) inferred from the RC drilling with
several of the zones showing downdip consistency (DY6 Metals ASX releases 10th Oct and 26th Oct, 2023) with
numerous apparently more discontinuous mineralisation zones.
The visual mineralised zones have been geologically logged as hydrothermal breccias; no petrological work
has been undertaken as yet, samples for QEMSCAN analysis and interpretation are being collected from a
selection of ¼ core for investigation by ALS in Perth in Q1, 2024. XRD of selected RC samples containing high
to low rare earth mineralisation and host rocks is under review and to be reported in Q1. The mineralogy and
quantitative assessment of minerals contained in the core will provide valuable liberation characteristics of
target minerals to guide the Company in formulating a preliminary metallurgical test program.
Page 5
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Figure 3. Drill Section DY6 Metals holes MDD004, 007 & 008, RC hole MR002 with historical intersections from Globe
MARC005, 015, 016, 029 & 030.
Holes MDD001-005 were drilled at -55o to southwest attempting to intersect the mineralised zones at right
angles; hence intersections within these holes approximate the true width of the mineralised zones at that
location. Holes MDD006, MDD007 and MDD008 were drilled at -45o to the east and northeast, being down
the estimated dip of the mineralisation. This was to maximise material available for the initial test work
program.
The core is shown in the photographs of the half core in Figure 4 from hole MDD007.
These photographs show gneissic foliation approximately 45o to the core axis suggesting a near vertical dip
in the sequence foliation, whereas the mineralisation, the pink and tan zones, are irregularly orientated
suggesting hydrothermal alteration. The core being too fractured for downhole orientation.
Rare earth rich mineralisation within the hydrothermal breccia were intersected in drillhole MDD007 from
23.9m for 15.1m with high TREO grade zones of 1.79wt% TREO @ 29m to 30m, 1.31wt% TREO @ 33m to
34m, 1.89wt% TREO @ 34m to 35m and 2.12wt% TREO from 35m to 36m (Figure 5).
The TREO distribution of this exceptional 15.1m intersection of MDD007 has shown a high proportion of
heavy rare earth oxides (HREO) at 27.7% HREO/TREO and 3.7% DyTb:TREO along with valuable magnetic rare
earths NdPr oxide of 15.2%.
The high proportion of Nd+Pr+Dy+Tb oxides identified at Machinga is highly valuable and critical to the EV
permanent magnets and renewable industries, with a basket price of US$28 per kg TREO (using a 2500ppm
Page 6
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
TREO cutoff). The Company believes this compares very favourable relative to peers that are focussed
predominately on light rare earth projects1.
The initial focus of DY6 during the maiden drilling program was to test the known strike of the confirmed
historic drill results in the northern anomalous zone. The next stage of the exploration program is already
underway with further rock chip sampling at Machinga focused on stepping out NW of the phase 1 drilling
campaign and along the southern zone of Machinga into EL0705 following the anomalous contour to
delineate high priority drill targets for the phase 2 drill program Q1 2024.
1
Source: Lindian Resources Rare Earth distribution from ‘Mineral Resource Estimate of 261 million LIN:ASX Announcement 3 August 2023’. Rare Earth
Basket Price is calculated using NdPr, Dy and Tb oxide prices as at Oct 31st, 2023 from Baiinfo Market Intelligence.
Page 7
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Figure 4. Half drill core of MMD007 showing high-grade rare earth mineralisation in the Machinga deposit.
Figure 5. Drill Section DY6 Metals holes MDD003 & MDD005.
The Company plans to prepare an ore sample using the diamond core collected from the Machinga central
drill program to produce a representative ore sample to commence beneficiation test work program in Q1,
2024 based on the 3 downdip holes MDD006, 007 and 008.
Upon completion and interpretation of XRD analysis on RC samples and minerology of selected pieces of
diamond core, a beneficiation test work program will be planned with the Company’s consulting metallurgist.
Page 8
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Tundulu REE Project
During the half-year, DY6 applied for an exclusive prospecting licence application (91.5km2) over a project
area with significant REE potential in southern Malawi, “Tundulu” – a known carbonatite ring complex with
abundant REE mineralisation, predominantly in the form of bastnaesite and apatite.
Shallow historical drilling at Tundulu undertaken by JICA (“Japanese International Cooperation Agency”) in
1988 (up to a max depth of 50m), included:
•
41m @ 3.7% TREO, from 8m (JMT-22);
•
17m @1.3% TREO, from surface and 14m @1.1% TREO, from 21m (JMT-14);
•
11m @ 2.2% TREO, from 17m and 14m @ 4.1% TREO, from 36m (JMT-17); and
•
14m @ 1.1% TREO, from 3m (JMT-07).
The Company’s geological team recently undertook reconnaissance field visit over parts of the licence
application area and samples have been submitted for laboratory analysis in South Africa.
Figure 6. Location of the Tundulu REE Project in Southern Malawi.
Page 9
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Tundulu is a carbonatite ring complex forming part of the Chilwa Alkaline Province in southern Malawi. The
geological structure of the Tundulu Ring Complex comprises of three igneous centres. The first comprises a
circular aureole of fenitization about a 2 km diameter plug of syenite. The second carbonatite ring structure
centred on Nathace Hill has a diameter of 500-600m. Wrench faulting prior to emplacement of the third
centre displaced the western half of the Nathace Hill ring structure 250m to the north. The third centre
comprises small plugs and thin sheets of meta-nephelinite and beforsite. The main apatite deposit forms an
arcuate zone (300m N-S and 50m E-W) around the eastern side of the hill.
Access to the area is relatively straightforward, the east side of the complex and Nathace Hill can be reached
via dirt road from nearby village of Nambazo.
(a)
(b)
((a)
(b)
Figure 7. (a) Google earth image of the Tundulu Ring Complex, facing north; (b) Geological map of Tundulu, adopted
from Garson (1962) with JICA drill collar locations (1988) and sample locations.
Page 10
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
The Tundulu carbonatite intrusion was first reported in detail by M.S. Garson in 1965 and was extensively
drilled for REE and rock phosphate resources by JICA between 1988 to 1991 with three separate non-JORC
resources being delineated at Nathace Hill within the apatite (refer to DY6 ASX announcement dated 11
December 2023).
These three areas were subject to small scale mining in 2010 and subsequently a joint venture between
Optichem and Mota-Engil undertook an evaluation of the REE potential during 2014/15. They completed 55
holes, mainly RC for 7,002m. A preliminary non-JORC resource was defined.
The Company has only limited historical data on the Tundulu Project. In the coming months, the Company
will look to obtain all available data government and public sources and undertake a more detailed geological
review.
Mzimba & Karonga Lithium Projects
During the half-year, the Company applied for four highly prospective lithium licences in Northern Malawi,
in the regions of Mzimba and Karonga. In addition, the Company also entered into an option agreement with
an unrelated third-party vendor (Afro Gifts Mining Limited) to acquire an 80% interest in an adjacent
prospective licence (which has been granted) located in Karonga, also prospective for lithium.
Together, these four licence applications, and 1 granted licence cover a combined area of approximately
785km2.
Figure 8. Location of lithium prospecting licence applications near Mzimba.
Page 11
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Figure 9. Location of lithium prospecting licence application (Northern licence) and granted lithium prospecting licence
(Southern licence) near Karonga.
Mzimba
Located in the Mzimba district of central Malawi about 200km north of the capital Lilongwe, (refer Figure 8)
the Mzimba Project covers an area of approximately 710.5km2 extending through three separate tenements
namely: Mzimba West, Mzimba Central and Mzimba South.
A desktop study identified two areas for field inspection by DY6 staff and a field reconnaissance program was
conducted over parts of the tenement area during November 2023. The first area is 65km north of Mzimba
Township covering portion of the Traditional Authority Mtwalo, Chindi and part of Inkosi Paramount Chief
M’belwa.
According to unpublished reports, regional geological mapping and reconnaissance surveys were conducted
in the area by British Geological Survey in the 1980’s and the Malawian Geological Survey Department. The
results indicated that Mzimba district has potential for a range of gemstones (such as aquamarine,
tourmaline, beryl, and ruby) and industrial minerals occurring in pegmatites (Gaskell, 1973) (refer to DY6 ASX
Announcement dated 15 December 2023).
The project area occurs within the Mesoproterozoic Irumide orogenic belt that extends from around Lundazi
in eastern Zambia into Malawi; this belt hosts several granitic pegmatite swarms which are mined for
gemstones including beryl varieties and other related metal deposit types.
Despite the potential in pegmatite resources, only small-scale mining activities targeting gemstones occur in
the area. Little modern exploration has been conducted for lithium, caesium, niobium and tantalum that
could be associated with pegmatites.
Page 12
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
The area is underlain by orthogneisses, paragneisses, schist and granulite rocks of the Irumide Belt form
basement geology in the area. These rocks are leucocratic to melanocratic in nature as dark to light minerals
such as Quartz, Biotite and K-feldspar varies with various proportion when observing hand specimen. Floats
of greenschist facies rocks were also observed.
Several pegmatites were noted cross cutting Basement complex rocks in various localities in the district (refer
Figure 12).2 These pegmatites were covered by varying thickness of superficial deposits. The pegmatites
outcrop as nodular material, being elongated and lenticular in shape forming wavelike topographical features
due to their resistance to weathering especially by the quartz content. They tend to be oriented parallel to
local shear structures observed in the country rocks with strike directions ranging from N-S to NNE-SSW.
Figure 10. Topography in the Mzimba Project area.
During the field work, pegmatites were identified by observing presence of weathered quartz, some flakes
of weathered biotite, muscovite and phlogopite micas and kaolinised feldspars which forms reddish brown
colour in the regolith (Figure 14a). Rock chip and grab geochemical sampling was completed within the
excavations (Figure 14b) made by small scale miners to classify the type of pegmatite and indicate their
economic potential.
2 Cautionary Statement: The Company notes that pegmatites contain varying abundances of typical LCT pegmatite non-Li-bearing
minerals, predominantly feldspar, quartz, muscovite mica (as a group also referred to as Aplite) and accessory tourmaline. Investors
should note that while LCT pegmatites are a known host for accessory lithium bearing minerals such as spodumene, it is also known
that this is not a universal association. Visual observations of the presence of rock or mineral types and abundance should never be
considered a proxy or substitute for petrography and laboratory analyses where mineral types, concentrations or grades are the factor
of principal economic interest. Visual observations and estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations. At this stage it is too early for the Company to make a determinative view on
the abundances of any of these minerals. These abundances will be determined more accurately through petrography, assay, and XRF
analysis. The observed presence of pegmatite does not necessarily equate to lithium mineralisation. It is not possible to estimate the
concentration of mineralisation by visual estimation and this will be determined by chemical analysis.
Page 13
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Figure 11. Quartz float (left) and weather kaolinized feldspars and open pit mine for aquamarine (right).
Most pegmatites identified were classified as zoned type with well-defined zones of wall rock, intermediate
and a core. The wall zone or contact is made up of a fine-grained mass of quartz, feldspar, micas and partly
superficial deposit of kaolinized feldspar materials (refer Figure 11).
Figure 12. Pegmatites* zones of the core, intermediate and the wall rock.
The Intermediate zone is made up of a matrix of medium grained quartz, feldspar and muscovite with
occasional garnets. Feldspars are usually occurred in large partly kaolinized crystals of micro perthite with a
pinkish colour.
The core zones are typically quartz rich with, large quartz more than 5cm in width inter-grown with pinkish
microcline to white Albite feldspars and large books of various mica types (refer Figure 13). The type of micas
noted includes grey-white muscovite, purple coloured lepidolite* and brown phlogopite; a greenish mica
believed to be a lepidolite variety was also noted.
In the core zone gemstones such as aquamarine were mined, growing as needle-like structures inside white
to clear quartz and between micas and feldspars.
Page 14
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Separating the core and intermediate zones, a dark heavy metallic mineral was observed in some places and
field identified as tantalite. Samples were collected for analysis for confirmation (refer Figure 13).
Pegmatites throughout the area have been artisanal mined for beryl, tourmalines, micas, garnet, rose quartz,
and many other gemstones.
Figure 13. The Core of the opened pegmatite showing Quartz crystals, books of Muscovite micas and K-feldspar with
matrix of Albite feldspar.
The field investigation established the potential for lithium in the area with lepidolite being identified and
samples were collected (refer Figure 14); the presence of other lithium related minerals such as Spodumene,
Petalite and Kunzite is yet to be established.
Figure 14. (a) The matrix of possible Lepidolite Micas and (b) pegmatite matrix.
Page 15
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
During the fieldwork, potential pegmatite areas were randomly selected, and descriptions were recorded in
relation to geology, human activities and settlements, soil colour, accessibility and vegetation cover. In
addition, each selected site was recorded using GPS (as shown on sampling points referred in DY6 ASX
Announcement dated 15 December 2023).
Rock chip samples were collected and labelled using permanent marker for easy identification when taken
for laboratory analysis. All samples collected were kept in a well labelled sampling bags to be prepared before
for analysis. The samples collected were sent to Geological Survey Department for preparation before taken
to the analytical laboratory.
Karonga
The Karonga Project, which covers both the exclusive prospecting licence application and the granted licence
area which the Company has an option to acquire an 80% interest (refer to Figure 9) is located about 440km
north of the capital Lilongwe and covers a combined area of approximately 75km2. The area can easily be
accessed using Karonga-Chitipa M1 Road turning to the west at Kasikisi School signpost along the M1 Road.
The Karonga area is associated with a series of N-S trending ridges with metamorphic Basement complex
rocks commonly identified as windows within the Karroo System which overlies the basement. The Karroo
System units are typically sandstones with carbonaceous shales formations.
Pegmatite float material was noted in the Mwesa River which cuts NE-SW through the area. The sampling
focused on pegmatite intrusions that are traceable for up to 500m in length. In hand specimen, these
pegmatites have high percentages of albite, microcline and occasional K-feldspar with associated muscovite
and biotite micas. The pegmatites are within the basement complex as biotite schist and gneisses with
medium sized dark coloured micas. Quartz-feldspathic granulites were also observed. Exposures of these
were found with copper coatings on joints and weathered reddish brown cuprite was observed.
Within the pegmatites, light greenish to purplish elongated feldspar-like crystals were observed, using a hand
lens and tentatively identified as spodumene* (Figures 15a and 15b). Samples were collected and some had
structures which shows shearing effect depicting the structure of spodumene (refer DY6 ASX Announcement
dated 3 January 2024).
Page 16
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
(a)
(b)
Figures 15a & 15b. Pegmatite sample and float with prismatic structures and interpreted to be spodumene.
DY6 is finalising a maiden exploration program at the Karonga Lithium Project, which will consist of detailed
geological mapping, rock chip and soil sampling. This program, anticipated to take up to 4 weeks, will
commence in January 2024.
Page 17
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Salambidwe REE Project
During the half-year, the Company successfully completed an extensive geochemical sampling and geological
mapping program at the highly prospective Salambidwe REE and Nb project in southern Malawi. Salambidwe
sits within the Salambidwe Ring Complex, part of the Chilwa Alkaline province of southern Malawi that also
hosts the Kangankunde Deposit, Machinga REE Project and numerous other REE prospects.
The complex is approximately six kilometres in diameter (approximately 85% occurs within the Company’s
licence) and is dominated by syenite and nepheline syenite with a core of agglomeratic rocks. These alkaline
rock suites are known hosts to a variety of critical minerals based on historical geochemical sampling work
completed by Global Metals & Mining (ASX:GBE) in 2010/12 (refer DY6 ASX announcement dated 27/06/23).
The prospect has never been drilled.
Figure 16. Map location of Salambidwe Project relative to DY6’s other projects.
The Company has collected approximately 500 soil and rock chip samples over 50-line kilometres within the
project. Samples have been sent to Kitwe, Zambia for preparation followed by dispatch to the lab in Perth
for analysis. Results are expected in late January 2024.
Following completion of the geochemical program, the Company has commenced an airborne geophysical
program at Salambidwe, which will consist of 45-line kilometres of electromagnetic plus radiometric
surveying to map the magnetic and conductive properties of the geology at Salambidwe.
Page 18
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
The data promises to be more detailed compared to the data obtained by the previous survey, the Geological
Mapping and Mineral Assessment Project (GEMMAP), which had lapses due to the model and technicality of
the survey. The combined geochemical and geophysical data is aimed at refining targets prior to a maiden
drill program.
Figure 17. Geochemical Sampling Program within Salambidwe Prospect (now completed).
Page 19
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Ngala Hill
The Ngala Hill prospect is located 35 km south-southwest of Blantyre in southern Malawi. The deposit is
characterised as an outcropping ultramafic chonolith with widespread Pd-Pt-Au-Cu mineralisation that is
palladium-rich. No significant modern exploration has been undertaken on the prospect including no
electromagnetics (EM) to target higher-grade massive sulphides. Three zones of palladium rich Pd, Pt, Au, Cu
mineralisation have been identified to date.
The main mineralised zone has only had limited drilling. The Company believes there is significant potential
for increased PGE grade in fresh rock (i.e., Julimar deposit). The prospect is proximal to the Nacala rail/ port
corridor and grid power.
No immediate work has been planned at Ngala Hill in the near term.
Corporate
ASX Listing
The Company completed a $7 million Initial Public Offer and was admitted to the Official List of the ASX on 29
June 2023. The total shares on issue as at 31 December 2023 is 58,500,000.
Shareholder Meetings
On 15 November 2023, all resolutions put to Shareholders at the Company’s Annual General Meeting were
passed by way of a poll.
Issue of Securities
On 27 July 2023, the Company issued a total of 3,000,000 performance rights as part of Mr Kaiser’s CEO
appointment and 500,000 performance rights to Mr Saindi as part of his appointment as Senior Exploration
Geologist.
On 17 November 2023, the Company issued 3,000,000 shares following the conversion of performance rights
following the satisfaction of Milestones 1 and 2 (as defined in the Company’s IPO Prospectus).
Subsequent Events
On 3 January 2024, the Company entered into an option agreement with an unrelated third-party vendor
(Afro Gifts Mining Limited) to acquire an 80% interest in a licence prospective for lithium located in the
Karonga region, northern Malawi.
Page 20
DY6 Metals Ltd
For the Half Year Ended 31 December 2023
Auditor’s Independence Declaration
A copy of the auditor’s independence declaration as required under section 307C of Corporations Act 2001
is set out immediately after this directors’ report.
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001.
On behalf of the directors
Daniel Smith
Non-Executive Chairman
Perth, Western Australia, 13 March 2024
Abbreviations
§
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3,
Lu2O3, Y2O3
§
HREO = Heavy Rare Earth Oxides –Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3
§
HREO% = HREO/TREO * 100
§
DyTb:TREO = (Dy2O3 + Tb4O7)/TREO * 100
Compliance Statement
The information in this report that relates to exploration results, mineral resources or ore reserves is based on information compiled
by Mr Allan Younger, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Younger is a consultant of the
Company. Mr Younger has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the
`Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr Younger consents to
the inclusion of this information in the form and context in which it appears in this report. Mr Younger holds shares in the Company.
The exploration results contained in this report were first reported by the Company in its prospectus dated 3 April 2023 and
announced to ASX on 27 June 2023, 6 July 2023, 12 September 2023, 3 October 2023, 10 October 2023, 26 October 2023, 4 Decembe
Share your feedback
Discover