DY6 Stakes Highly Prospective REE Carbonatite Project
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
11 December 2023
DY6 Stakes Highly Prospective
REE Carbonatite Project in Malawi
HIGHLIGHTS
DY6 has applied for an exclusive prospecting licence over a project area with
significant REE potential in southern Malawi
‘Tundulu’ is a known carbonatite ring complex with abundant REE mineralisation,
predominantly in the form of bastnaesite and apatite
Shallow historical drilling (1988) (>max depth of 50m), includes:
41m @ 3.7% TREO, from 8m (JMT-22)
17m @1.3% TREO, from surface and 14m @1.1% TREO, from 21m (JMT-14)
11m @ 2.2% TREO, from 17m and 14m @ 4.1% TREO, from 36m (JMT-17)
14m @ 1.1% TREO, from 3m (JMT-07)
Samples from recent reconnaissance field visit at Tundulu have been despatched for
laboratory analysis
Tundulu complements the Company’s existing REE & critical metals portfolio in
Malawi
DY6 Metals Ltd (ASX: DY6) (“DY6”, the “Company”), a strategic metals explorer targeting Heavy Rare
Earths (HREE) and Niobium (Nb) in southern Malawi, is pleased to announce that it has submitted an
exclusive prospecting licence application (91.5km2) over a carbonatite ring complex in southern Malawi
known as Tundulu, with significant potential for REE (“Tundulu” or the “Project”).
Shallow historical drilling at Tundulu undertaken by JICA (“Japanese International Cooperation Agency”)
in 1988 (up to a max depth of 50m), included:
•
41m @ 3.7% TREO, from 8m (JMT-22);
•
17m @1.3% TREO, from surface and 14m @1.1% TREO, from 21m (JMT-14);
•
11m @ 2.2% TREO, from 17m and 14m @ 4.1% TREO, from 36m (JMT-17); and
•
14m @ 1.1% TREO, from 3m (JMT-07).
The Company’s geological team recently undertook reconnaissance field visit over parts of the licence
application area and samples have been submitted for laboratory analysis in South Africa.
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
The Company’s CEO, Mr Lloyd Kaiser said:
“We are very excited about this strategic licence application in southern Malawi. Tundulu is a known
carbonatite ring complex close to our flagship HREE Machinga Project with an interesting profile of
bastnaesite and apatite with abundant REE mineralisation, and easily accessible by road. Tundulu will
complement our existing REE projects, Machinga and Salambidwe. While the Company waits for the
license to be granted, the focus of the exploration team will be on undertaking a detailed geological and
geophysical review of this new licence over the coming months.”
Tundulu REE Project
Figure 1. Location of the Tundulu REE Project in Southern Malawi
Tundulu is a carbonatite ring complex forming part of the Chilwa Alkaline Province in southern Malawi
located approximately 60km south-east of the Company’s flagship HREE, Machinga Project and situated
at the southern tip of Lake Chilwa (refer Figure 1). The Project area covers 91.5km2. Previous exploration
has identified significant REE mineralisation, mainly in the form of bastnaesite, in addition to substantial
amounts of apatite (phosphate).
dy6metals.com | ASX:DY6
2
Figure 2. Topographical Map of Tundulu with sample locations from recent reconnaissance field visit
dy6metals.com | ASX:DY6
3
The geological structure of the Tundulu Ring Complex comprises of three igneous centres. The first
comprises a circular aureole of fenitization about a 2 km diameter plug of syenite. The second carbonatite
ring structure centred on Nathace Hill has a diameter of 500-600m. Wrench faulting prior to emplacement
of the third centre displaced the western half of the Nathace Hill ring structure 250m to the north. The third
centre comprises small plugs and thin sheets of meta-nephelinite and beforsite. The main apatite deposit
forms an arcuate zone (300m N-S and 50m E-W) around the eastern side of the hill.
Access to the area is relatively straightforward, the east side of the complex and Nathace Hill can be
reached via dirt road from nearby village of Nambazo.
Figure 3. (A) above, Google earth image of the Tundulu Ring Complex, facing north, (B) below, Geological
map of Tundulu, adopted from Garson (1962) with JICA drill collar locations (1988) and sample locations.
dy6metals.com | ASX:DY6
4
Figure 4. Rock chip samples 2 and 5 from Tundulu, left: visible syenite and right: visible brecciated
carbonatite
Sample ID
Tundu 1
Tundu 2
Tundu 3
Tundu 4
Tundu 5
Description
Fenite
Syenite
Weathered Fenite
Syenite
Brecciated Carbonatite
WGS84 Z36S East
801400.67
801359.01
801518.79
801453.23
801441.71
WGS84 Z36S North
8280145.68
8280084.4
8279689.68
8279901.36
8280000.87
The Tundulu carbonatite intrusion was first reported in detail by M.S. Garson in 1965 and was extensively
drilled for REE and rock phosphate resources by JICA between 1988 to 1991 with three separate nonJORC resources being delineated at Nathace Hill within the apatite.
These three areas were subject to small scale mining in 2010 and subsequently a joint venture between
Optichem and Mota-Engil undertook an evaluation of the REE potential during 2014/15. They completed
55 holes, mainly RC for 7002m. A preliminary non-JORC resource was defined.
The Company has only limited historical data on the Tundulu Project. In the coming months, the Company
will look to obtain all available data government and public sources and undertake a more detailed
geological review.
-ENDSThis announcement has been authorised by the Board of DY6.
dy6metals.com | ASX:DY6
5
More information
Mr Lloyd Kaiser
Mr John Kay
Mr Luke Forrestal
CEO
Director & Company Secretary
Investor Relations
lloyd.kaiser@dy6metals.com
john.kay@dy6metals.com
+61 411 479 144
Competent Persons Statement
The Information in this announcement that relates to exploration results, mineral resources or ore reserves
is based on information compiled by Mr Allan Younger, who is a Member of the Australasian Institute of
Mining and Metallurgy. Mr Younger is a consultant of the Company. Mr Younger has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to the activity
that he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the `Australian
Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code). Mr
Younger consents to the inclusion of this information in the form and context in which it appears in this
announcement. Mr Younger holds shares in the Company.
Historical Exploration Results – Cautionary Statement
The historical geological mapping and sampling, that defined the prospect at Tundulu, and as shown in
Figure 3B, was conducted in various programs between 1988 and 1991 by previous owners JICA
(Japanese International Cooperation Agency). The Company is in possession of the report covering the
first year of that activity.
Nothing has come to the attention of DY6 that causes the Company to question the accuracy or reliability
of the former owner’s Exploration Results; but DY6 has not independently validated the former owner’s
soil sampling results or drilling and therefore is not to be regarded as reporting, adopting or endorsing
those results.
Drilling results (Exploration Results) from JICA presented in this announcement have not reported
previously by the former owner of the Tundulu project, JICA. The source and date of the results are listed
in the Technical References below.
As a result, the reported Exploration Results –
• Have not been reported in accordance with the JORC Code 2012 and may not conform with the JORC
Code 2012.
• A Competent Person has not done sufficient work to disclose the Exploration Results in accordance with
the JORC Code 2012.
• It is possible that following further evaluation and/or exploration work that the confidence in the prior
reported Exploration Results may be reduced when reported under the JORC Code 2012.
• Nothing has come to the attention of the Company that causes it to question the accuracy or reliability
of the former owner’s Exploration Results; but
• The Company has not independently validated the former owner’s Exploration Results and therefore is
not to be regarded as reporting, adopting or endorsing those results.
DY6 intends to undertake further exploration including soil sampling, infill and extensional drilling at
Tundulu confirm the tenor and continuity of REE and phosphate mineralisation JICA.
dy6metals.com | ASX:DY6
6
Technical References
Garson, M.S., (1965). Carbonatites of Southern Malawi: Bulletin of Geological Survey of Malawi, 15.
Broom-Fendley, S., Styles, M.T., Appleton, J.D., Gunn, G. & Wall, F., (2016). Evidence of dissolutionreprecipitation of apatite and preferential LREE mobility in carbonatite-derived late-stage hydrothermal
processes: American Mineralogist, Vol 10, pages 596-611.
Yanagiya, K., & Sato, J., (1988). Report on the Cooperative Mineral Exploration in the Chilwa Alkaline
area, Republic of Malawi. Japan International Cooperation Metal Mining Agency of Japan, JICA.
Licence Application Details
Tenement No.
GR:1248129
Tenement Size (km2)
91.5km2
Application Date
7 December 2023
Date Granted
Pending
Table 1: Digitised Collar Locations from JICA Report 1988 (WGS84)
Hole ID
East
North
JMT-01
JMT-02
JMT-03
JMT-04
JMT-05
JMT-06
JMT-07
JMT-08
JMT-09
JMT-10
JMT-11
JMT-12
JMT-13
JMT-14
JMT-15
JMT-16
JMT-17
JMT-18
JMT-19
JMT-20
JMT-21
JMT-22
JMT-23
JMT-24
802121
802258
801845
802112
802084
801654
801295
801105
801802
801956
801952
801959
801814
801290
801188
801230
801047
801195
801303
801108
801234
801304
801235
801296
8280665
8280461
8280690
8280465
8280268
8280839
8280152
8280074
8280081
8280080
8280274
8280469
8280464
8280293
8280173
8280054
8279927
8279966
8279991
8280363
8280305
8280233
8280132
8280066
Total
Depth (m)
50.3
50.3
50.3
50.3
50.3
50.4
50.2
50.2
50.1
50.1
50.2
50.2
50.3
50.2
50.2
50.1
50.1
50.1
50.1
50.2
50.1
50.2
50.2
50.1
Type
Dip
Azimuth
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
dy6metals.com | ASX:DY6
7
Table 2: Drillhole Results from JICA Report 1988
From To
La
Ce
Nd
Sm
Eu
Tb
Nb
Sr
Y
P
TREO TREO
Width
m
m
(ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (%)
JMT-01
No significant intersection
JMT-02
16.1 22.1
6
853 1732
607
78.7
18.2
23.4
513 5949
107 37183 4108
and
42.5 45.5
3
973 1819
652
79
20.2
5.1
420 8431
101 32087 4385
JMT-03
32.6 34.7
2.1
550 1173
382
60.5
11.5
66.2
753 5205
64 30437 2772
JMT-04
No significant intersection
JMT-05
30.4 31.3
0.9 2406 4508 1436 208.5
35.3 103.3
459
735
99
5285 10560
and
46 47.7
1.7 4485 7988 2260 334.9
57.4
9.2
470
912
251
9744 18490 1.85%
JMT-06
No significant intersection
JMT-07
2
3
1 2663 5802 1307 346.2 111.1
60.4 2048 4541 1478 131976 14249 1.42%
and
3.4 17.8
14.4 2779 4952
891 209.9
60
29.7 1442 10936
776 72931 11717
including
3.4
9
5.6 2932 6366 1322 334.2 100.9
58 2851 7244 1318 131709 15043 1.50%
and
14.2 22.4
8.2 6434 8884 1010 200.5
38
12.6 1400 31871
276 17947 20276 2.03%
JMT-08
No significant intersection
JMT-09
1.3 4.3
3
362
734
263
46.4
13.1 <0.1
465 1006
66 51913 1786
JMT-10
16.8 23.8
7 2559 6353 2714 411.1
67.6
79.8
172
664
114
3954 14759 1.48%
and
27.9 29.8
1.9 2539 6260 2064 273.4
45.6
2.9
63
635
61
170 13523 1.35%
JMT-11
No significant intersection
JMT-12
3.2
24
20.8
800 1532
579
78.7
18
15.2 1176 18383
90 29219 3739
and
42 50.2
8.2
715 1356
508
74.4
16.6
11.8 2149 14863
90 33591 3330
JMT-13
No significant intersection
JMT-14
0 17.3
17.3 3441 5590 1273 264.6
68.2
23 2261 19984
416 22724 13719 1.37%
including 10.4
14
3.6 1474 2877 1061 226.9
72.5
35.4 5354 5948
663 41912 7729
and
21.3 35.3
14 2433 3804 1433 237.3
61.1
18.6 2391 9161
363 18916 11028
including 21.3 25.3
4 2065 4297 1390 273.1
86.1
40 4603 20012
592 36120 10534
and
39.7 43.6
3.9 20623 23292 3442
461
50.1 <0.1
4360 55515
80
2462 57501 5.75%
JMT-15
0 3.1
3.1 3666 5385 1152 152.3
20.7
7.8
297 30750
47
146 12526
and
30.6
34
3.4 5711 8922 1972 290.9
43.3 <0.1
182 8965
72
465 20434 2.04%
and
37.3 41.4
4.1 3053 4508
965 138.5
21.2
1.5
244 8834
90
2836 10543
JMT-16
21.2 27.8
6.6 3990 5959 1266 195.1
27.3 <0.1
280 31891
58
1592 13804 1.38%
and
39.5 48.1
8.6 3663 4835
991 146.7
23
11.8
467 14011
70
1585 11702
JMT-17
2.9 5.2
2.3 1667 2258
665 170.1
50.8
35.5
447 2323
537 28909 6483
and
17.7
29
11.3 7112 9251 1826 271.9
41.5
5.7 1500 34396
49
927 22264 2.23%
and
29.6 35.2
5.6 5503 8193 1758 261.4
41
12 2344 25270
43
551 18986 1.90%
and
36.2 50.1
13.9 13642 17316 2804 419.2
58.3
2.1 1880 50843
39
178 41141 4.11%
JMT-18
48.4 50.1
1.7 7900 9198 2838 436.3
96.7
90.3
848 11623
810 46709 25622 2.56%
JMT-19
1.3 4.8
3.5
879 1630
581 140.9
47.1
49.5
82 4460 1510 122165 5903
and
12.4 14.6
2.2
708 1445
591
196
80.4
51.2
121 4457 1473 105549 5544
and
17.7 24.7
7
491
854
266
59.2
16.2
25.6
124 2411
249 37067 2369
JMT-20
1.6 4.6
3 1580 2602
802 198.5
75.2
20.2
390 3250
743 61020 7268
and
26.2 28.4
2.2 2832 4821 1388 235.5
43.3
5.3
194 45964
141
6907 11369
JMT-21
0 4.1
4.1 1836 3197
975 192.6
54.2
9.8
461 7282
582 48055 8253
and
33.7 42.2
8.5 1785 2964
899
237
86.9
44.8 1384 7113
784 42991 8205
including
38 42.2
4.2 2121 3532 1195 342.5 135.3
89.8 1930 4202 1147 61602 10337
JMT-22
8.7 49.8
41.1 12981 14988 2272 315.5
35
5
617 37510
76
2878 36791 3.68%
JMT-23
39.7 44.7
5 5992 8534 1750 254.6
34.7
1
410 22377
103
2360 20004
2%
JMT-24
1 4.9
3.9 3833 5226
280 238.5
59.9
22.9
746 5920
788 61679 13780 1.38%
and
8.2 12.9
4.7 4860 6891 1384 258.4
54 <0.1
1834 3372
640 43271 16952 1.70%
Hole ID
dy6metals.com | ASX:DY6
8
Annexure A: JORC Code, 2012 Edi�on – Table 1 report
Sec�on 1 Sampling Techniques and Data
(Criteria in this sec�on apply to all succeeding sec�ons.)
Criteria
JORC Code explana�on
Sampling
techniques
•
•
•
•
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or
•
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should not
be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverized to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.
This is an interim announcement of qualita�ve results. This program
which is currently in process consists of the discovery, field mapping and
rock chip sampling of outcrops. No rock chip sample assays are provided
in this announcement.
Field samples of outcrop were taken by field staff from outcrops u�lising a
geo-pick and hand tool. Samples are photographed and stored in labelled
clear plas�c bags for transport to the lab for analysis.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
No recent drilling is u�lised on this program or reported in this
announcement.
Drill sample
recovery
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
Not recorded
•
dy6metals.com | ASX:DY6
9
•
Logging
Criteria
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
JORC Code explana�on
Sub-sampling
techniques and
sample preparation •
•
•
•
•
•
•
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
•
Qualita�ve geological logging of rock chips and outcrops is completed in
the field.
Commentary
•
The sampling technique used to obtain rock chip samples from outcrops
manually is in line with industry standards and standard explora�on
prac�ces.
dy6metals.com | ASX:DY6
10
Quality of assay
•
data and laboratory
tests
•
No recent assays are reported in this announcement, the announcement
is an opera�ons update rela�ng to the current mapping and rock chip
sampling program that is s�ll currently underway.
Historical analyses are defined only as being ICP; diges�on methods are
not specified in available data.
Verification of
sampling and
assaying
Field data is collated and sent back to DY6 geological staff and/or
contractors where it is checked and verified.
Location of data
points
The nature, quality and appropriateness of the assaying and
•
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, •
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have been established.
• The verification of significant intersections by either independent or
•
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
No informa�on pertaining to this release or program is or will be used in
Mineral Resource es�ma�on.
dy6metals.com | ASX:DY6
11
Criteria
Data spacing and
distribution
JORC Code explana�on
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
•
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
Orientation of data •
in relation to
geological
structure
•
Sample security
•
Commentary
•
Whether the orientation of sampling achieves unbiased sampling •
of possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
Not recorded. Core is reportedly available for inspec�on at Malawi
Geological Survey Head Office in Zomba.
•
•
Company staff collected all laboratory samples.
Contractors affiliated to the laboratory were for the transport of the
samples to the lab.
The measures taken to ensure sample security.
• The results of any audits or reviews of sampling techniques and •
data.
Audits or reviews
Criteria
JORC Code explana�on
Mineral tenement and
land tenure status
•
•
Not applicable the announcement is preliminary no�fica�on of tenement
acquisi�on.
No audit of data has been completed to date.
Commentary
Type, reference name/number, location and ownership including •
agreements or material issues
with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate in
the area.
All claims are believed to be in good standing with the relevant
government authori�es and there are no known impediments to
opera�on in the project area.
dy6metals.com | ASX:DY6
12
Exploration done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
•
•
•
•
Historical explora�on is known to have been conducted by JICA
(Japanese Interna�onal Coopera�on Agency) from 1988-91. Full
details are being researched.
A joint venture between Op�chem and Mota-Engil explored the
area for REE during 2014/15, details are being researched.
Small scale mining was also undertaken by unknown par�es in
2014.
A full literature search will be undertaken by DY6 staff to acquire
all relevant data.
Sec�on 2 Repor�ng of Explora�on Results
(Criteria listed in the preceding sec�on also apply to this sec�on.)
Criteria
JORC Code explana�on
Commentary
Geology
• Deposit type, geological setting and style of mineralisation.
•
Tundulu is a carbona�te ring complex forming part of the Chilwa
Alkaline Province in southern Malawi. The geological structure of
the Tundulu Ring Complex comprises of three igneous centres. The
first comprises a circular aureole of feni�za�on about a 2 km
diameter plug of syenite. The second carbona�te ring structure
centred on Nathace Hill has a diameter of 500-600m. Wrench
faul�ng prior to emplacement of the third centre displaced the
western half of the Nathace Hill ring structure 250m to the north.
The third centre comprises small plugs and thin sheets of metanephelinite and beforsite
dy6metals.com | ASX:DY6
13
Drill hole Information
•
•
Data aggregation methods •
•
•
Relationship between
mineralisation widths and
intercept lengths
•
•
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes: o easting and northing
of the drill hole collar o elevation or RL (Reduced Level –
elevation above sea level in metres) of the drill hole collar
o dip and azimuth of the hole o down hole length and
interception depth o hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• No drilling has been undertaken on the project.
In reporting Exploration Results, weighting averaging
• No aggrega�on methods were used and no metal equivalents are
techniques, maximum and/or minimum grade truncations (eg
reported.
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
These relationships are particularly important in the reporting of • No new mineralisa�on widths are being reported. Historical results
Exploration Results.
are included for context.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
dy6metals.com | ASX:DY6
14
Criteria
JORC Code explana�on
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Commentary
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
• Please see maps and diagrams included in the announcement text,
that provide loca�ons for the claims and their loca�on rela�ve to
other projects in the area, with known geology from government
mapping.
Balanced reporting
• Where comprehensive reporting of all Exploration Results is not
• The release is considered to be balanced and is based on current
practicable, representative reporting of both low and high grades
available data for the project area
and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
Other substantive
exploration data
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• The historical data currently available to the Company is known to
be incomplete. Atempts will be made to obtain and collate the full
historical explora�on data.
Further work
•
• The Company intends to con�nue explore the tenements taking
priority samples with a view to do follow-up soil sampling and/or
drilling.
•
The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Historical data will be integrated as in becomes available.
dy6metals.com | ASX:DY6
15
Share your feedback