Thick zones of HM mineralisation observed
across Douala HM Project
HIGHLIGHTS
The Company’s reconnaissance auger and channel sampling programme has
been completed at the Douala Basin HMS Project
Reconnaissance sampling undertaken across the 6 Douala Basin tenements
has identified thick zones of high estimated concentrations of heavy minerals
(HM) as well as natural rutile
Work at the Douala Basin Project followed up on historical HM occurrences
identified by previous Eramet drilling, as well as priority areas identified through
the Company’s internal reviews
Samples collected from the reconnaissance program are due to be submitted
for laboratory analysis in the coming weeks, with results expected in the
September quarter
At Douala Basin, exploration will transition to a detailed campaign of auger
drilling
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce the initial visual
estimations from the reconnaissance exploration program at the Douala Basin HMS Project,
Cameroon. Desktop studies incorporating detailed geological mapping, geophysics, and
known mineral occurrences, were used to define initial, high priority targets for groundtruthing. The reconnaissance programme, which consisted of hand auger and channel
sampling, was successful in identifying high estimated concentrations of heavy mineral (HM)
mineralisation across all the six tenements that make up the project. Additionally, the
Company’s consultants have observed the presence of natural rutile grains within panned
concentrates.
Samples collected from this initial exploration programme are currently being prepped for
dispatch to the Company’s laboratory for analysis in South Africa, with results expected in the
September quarter.
Cautionary Statement: The Company cautions that, with respect to any visual mineralisation
indicators, visual observations and estimates of mineral abundance are uncertain in nature
and should not be taken as a substitute or proxy for appropriate laboratory analysis. Visual
estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations. Assay results from the drilling and sampling programmes will
be required to understand the grade and extent of mineralisation. Initial assay results are
expected in August 2025.
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
Technical Consultant, Cliff Fitzhenry, commented: “While the Company’s primary focus is on
the Central Rutile Project, where we have recently reported the presence of wide-spread
residual natural rutile mineralisation, we believe that the Douala Basin HMS project has
significant potential. The reconnaissance programme has over the last few weeks
demonstrated the potential of the area, with the identification of high concentrations of visible
heavy mineral sands across the project tenements through a mixture of auger, channel, and
soil sampling work. Pleasingly, we have also observed natural rutile grains at Douala Basin.
We look forward to the assay results of the reconnaissance programme in the coming months.”
Reconnaissance exploration at the Douala Basin HMS Project
As announced on 5 June 2025, the Company commenced reconnaissance auger and grab
sampling programmes at the Central Rutile and Douala Basin HMS projects, Cameroon. At
the Douala Basin project, the Company has completed 12 hand auger drill holes (refer Figure
1), collecting 53 samples in the process, as well as collected 38 channel samples from 11
surfaces for analysis (refer Tables 1 & 2).
Table 1: Reconnaissance auger drill holes completed to date at the Douala Basin HMS Project
showing maximum visual estimates of HM% from panned concentrate of the 1m samples.
Licence
Northing
WGS84
UTM32N
Easting
WGS84
UTM32N
EOH
Depth
EDEA-SUD
405871
634396
1.1
EDEA-SUD
398594
633545
2.6
EDEA-SUD
410577
614890
4.35
MBANGA
505849
566486
4.5
MBANGA
494206
559715
3.3
MBANGA
494650
558911
2.0
RHRAU0030
DIWONG
437402
603610
5
3-4%
RHRAU0031
DIWONG
440260
603985
4.2
4-5%
RHRAU0032
DIWONG
438105
604785
6.4
5-6%
RHRAU0033
DIWONG
437169
605356
9
3-4%
RHRAU0034
DIWONG
438113
608499
4.7
3-4%
RHRAU0035
DIWONG
438114
608577
3.2
3-4%
Hole ID
RHRAU0001
RHRAU0002
RHRAU0003
RHRAU0004
RHRAU0007
RHRAU0008
Max
Visual
Estimate
2-3%
2-3%
3-4%
2-3%
5-6%
5-6
Comment
Fine grained &
disseminated
Fine grained &
disseminatedFine grained &
disseminatedFine grainedVisible 1-5mm
rutile grains
Visible 1-5mm
rutile grains
Moderately
Disseminated HM
Moderately
disseminated &
fine to medium
grained HM Fine to medium
grained HM
Fine grained &
Disseminated HMDisseminated HM
Fine grained &
disseminated-
Cautionary Statement:
The Company cautions that, with respect to any visual mineralisation indicators, visual observations and estimates
of mineral abundance are uncertain in nature and should not be taken as a substitute or proxy for appropriate
laboratory analysis. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations. Assay results from the drilling and sampling programmes will be required
to understand the grade and extent of mineralisation. Initial assay results are expected in August 2025.
dy6metals.com | ASX:DY6
2
Figure 1: Reconnaissance sampling (hand auger and channel) locations at the Douala Basin HMS
project.
Figure 2: One meter channel sampling from RHRGB0010 on the Maleke permit
dy6metals.com | ASX:DY6
3
Figure 3: One meter hand auger samples laid out next to the drill site RHRAU0008.
Figure 4: Quarry workings from the Mungo tenement, Douala Basin. The vertical scale of the dune
package is estimated at ~20m+.
dy6metals.com | ASX:DY6
4
Figure 5: Surface wash showing visible rounded to sub-rounded HM on the Diwong permit. Cautionary
Statement: The Company cautions that, with respect to any visual mineralisation indicators, visual
observations and estimates of mineral abundance are uncertain in nature and should not be taken as
a substitute or proxy for appropriate laboratory analysis. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations. Assay results
from the drilling and sampling programmes will be required to understand the grade and extent of
mineralisation. Initial assay results are expected in August 2025.
dy6metals.com | ASX:DY6
5
Figure 6: Fine-grained HM with rutile (~1 mm) were observed in a panned concentrate from collar
RHRAU0008 (Figure 3) at the Mbanga permit, with rutile appearing as sub-rounded to angular, reddishbrown to black grains disseminated in a sandy quartz matrix. Cautionary Statement: The Company
cautions that, with respect to any visual mineralisation indicators, visual observations and estimates of
mineral abundance are uncertain in nature and should not be taken as a substitute or proxy for
appropriate laboratory analysis. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations. Assay results from the drilling and
sampling programmes will be required to understand the grade and extent of mineralisation. Initial
assay results are expected in August 2025.
Figure 7: Fine-grained HM with rutile (~1 mm) were observed in a panned concentrate from collar
RHRGB0010 (Figure2) at the Maleke permit, with rutile appearing as sub-rounded to angular, reddishbrown to black grains disseminated in a sandy quartz matrix. Cautionary Statement: The Company
cautions that, with respect to any visual mineralisation indicators, visual observations and estimates of
mineral abundance are uncertain in nature and should not be taken as a substitute or proxy for
appropriate laboratory analysis. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations. Assay results from the drilling and
sampling programmes will be required to understand the grade and extent of mineralisation. Initial
assay results are expected in August 2025.
dy6metals.com | ASX:DY6
6
Figure 8: Fine-grained HM with rutile (~1 mm) were observed in a panned concentrate from collar
RHRGB0009RH08 at the Maleke permit, with rutile appearing as sub-rounded to angular, reddishbrown to black grains disseminated in a sandy quartz matrix. Cautionary Statement: The Company
cautions that, with respect to any visual mineralisation indicators, visual observations and estimates of
mineral abundance are uncertain in nature and should not be taken as a substitute or proxy for
appropriate laboratory analysis. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations. Assay results from the drilling and
sampling programmes will be required to understand the grade and extent of mineralisation. Initial
assay results are expected in August 2025.
Background on the Douala Basin HMS Project
The Douala Basin HMS Project consists of 3 granted exploration permits and 3 exploration
permits under valid applications. The Edea Sud licence is a fully granted permit covering an
area of 440km2 whilst the 5 licence applications (Mbanga, Maleke, Mungo, Diwong, and
Mbongo) cover an area of 2,140km2 giving the total project package a land endowment of
2,580km2 across the Douala Basin of Western Cameroon. The tenements are all located within
50km of the deep-water port city of Douala.
Geologically the Douala Basin is a coastal sedimentary basin consisting of a package of
mainly marine sedimentary formations of Cretaceous to Quaternary in age. Thick, preserved
sequences of sandy material are known to exist across the tenement package and these are
thought to represent palaeo-placer coastline dune deposits. These sedimentary environments
are prospective for classic aeolian placer HMS deposits which normally host accumulations
of valuable heavy minerals such as ilmenite, zircon, rutile and monazite. The Diwong licence
was previously known as the Missole Project was held by the French multinational Eramet.
Eramet drilled some 60 sonic holes on the Project for 1,080m (582 samples) with 39 hand
auger holes for 190m (39 samples) specially targeting rutile and zircon. The drilling intersected
thick sequences of sands and confirmed the presence of rutile and zircon within the valuable
heavy mineral assemblage. Eramet discontinued the Project when it exited Cameroon in 2023
primarily due to the unsuitable setting of the mineralisation within its core Central Cameroon
project Akonalinga (which targeted alluvial placer rutile deposits within the lower lying river
systems).
dy6metals.com | ASX:DY6
7
Figure 9: DY6’s Douala Basin Project comprises 6 licence blocks proximal to the port city of Douala
along Cameroon’s coast.
dy6metals.com | ASX:DY6
8
Figure 10: Historical drilling on the Diwong license. Refer to ASX release dated 24 April 2025Acquisition of highly prospective Rutile & HMS projects in Cameroon
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith
Mr John Kay
Mr Cliff Fitzhenry
Executive Chairman
Director & Company
Secretary
Technical Consultant
dan.smith@dy6metals.com
john.kay@dy6metals.com
Clifford.fitzhenry@dy6metals.com
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Douala Basin Project, is based on information compiled by Mr Richard Stockwell, a
Competent Person who is a Fellow of The Australian Institute of Geoscientists. Mr Stockwell is a
consultant to the company and has sufficient experience which is relevant to the style of mineralization
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
dy6metals.com | ASX:DY6
9
Results, Mineral Resources and Ore Reserves’. Mr Stockwell consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to historical exploration results at the Central Rutile
and Douala Basin projects in Cameroon, were first reported by the Company on 24 April 2025. The
Company confirms it is not aware of any new information or data that materially affects the information
included in the original announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Appendix: Tenement Details
Tenement
Name
Mungo
Mbanga
Maleke
Diwong
Mbongo
Edea Sud
Nganda
Nsimbo
Kombo
Bounde
Alamba
Project
Name
Douala
Douala
Douala
Douala
Douala
Douala
Central
Central
Central
Central
Central
Holder
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Application
Date
29/06/2022
29/06/2022
30/01/2024
30/01/2024
30/09/2022
29/06/2022
19/02/2025
19/02/2025
19/02/2025
19/02/2025
19/02/2025
Area
483Km2
468Km2
491Km2
484Km2
214Km2
440Km2
396Km2
495Km2
460Km2
425Km2
348Km2
Granted
Date
14/12/2022
14/12/2022
N/A
N/A
N/A
14/12/2022
N/A
N/A
N/A
N/A
N/A
dy6metals.com | ASX:DY6
10
Table 2: Reconnaissance channel samples completed to date at the Douala Basin HMS Project showing
maximum visual estimates of HM% from panned concentrate of the 1m samples across the channel length.
Hole ID
Licence
Northing
WGS84
UTM32N
Easting
WGS84
UTM32N
Channel
Length
Max
Visual
Estimate
Comment
RHRGB 0001
Mbanga
500022
573608
1.5
3-4%
Disseminated HM
RHRGB 0002
Mbanga
495102
565210
3
2-3%
RHRGB 0003
Mbanga
493773
573545
1.5
3-4%
RHRGB 0004
Mbanga
492101
571721
1.5
3-4%
RHRGB 0005
Mbanga
492301
571416
1.5
3-4%
RHRGB 0006
Mungo
466437
568183
1.5
2-3%
RHRGB 0007
Mbanga
499034
577328
2
5-6%
RHRGB 0008
Mbanga
500369
568739
3
2-3%
RHRGB 0009
Maleke
477730
557857
5.2
5-6%
RHRGB 0010
Maleke
466175
571707
15.1
5-6%
RHRGB 0011
Mbanga
499822
565458
5
2-3%
Disseminated HM
Disseminated & fine
grainedDisseminated & fine
grained
Fine to medium grained
HMDisseminated HMNumerous visible coarse
rutile grainsFine grained HM
Highly disseminated &
visible <2mm rutile grainsHighly disseminated &
visible <2mm rutile grainsFine grained HM
Cautionary Statement:
The Company cautions that, with respect to any visual mineralisation indicators, visual observations and estimates
of mineral abundance are uncertain in nature and should not be taken as a substitute or proxy for appropriate
laboratory analysis. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations. Assay results from the drilling and sampling programmes will be required
to understand the grade and extent of mineralisation. Initial assay results are expected in August 2025.
dy6metals.com | ASX:DY6
11
JORC Code, 2012 Edition – Table 1 report
Section 1 – Sampling Techniques and Data
Criteria
Sampling Techniques
JORC Code explanation
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Commentary
Auger Drilling
•
Samples collected using a manual hand auger with a 75 mm and 100mm
diameter bit.
•
Drilling targeted coastline dune deposits
•
Samples taken at regular 1 m intervals downhole from surface (maximum ~9 m).
•
No lithological (horizons) were crossed in sampling.
•
Industry-standard practice was used in the processing of samples for assay.
Channel sampling
•
Channel samples were collected along exposed road cuttings and in the filed
•
Channels were cleared of loose debris, weathered material, and vegetation prior
to sampling.
•
Samples collected at consistent 1 m intervals
•
No lithological (horizons) were crossed while sampling
•
Industry-standard practice was used in the processing of samples for assay.
Historical
•
French multinational Eramet. Eramet drilled some 60 sonic holes on the Project
for 1,080m (582 samples) with 39 hand auger holes for 190m (39 samples)
specially targeting rutile and zircon.
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
Cautionary Statement:
The Company cautions that, with respect to any visual mineralisation indicators, visual
observations and estimates of mineral abundance are uncertain in nature and should
not be taken as a substitute or proxy for appropriate laboratory analysis. Visual
estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations. Assay results from the drilling and sampling
programmes will be required to understand the grade and extent of mineralisation.
Initial assay results are expected in August 2025.
dy6metals.com | ASX:DY6
12
Drilling techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face- sampling bit or other type,
whether core is oriented and if so, by what method, etc)
Drill sample recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Auger drilling
•
Vertical hand auger drilling conducted using a manually rotated auger with
75 mm and 100mm diameter bit.
•
Drilling continued until blade refusal.
•
Maximum hole depth varied by terrain (generally <9 m).
•
No drilling fluids, casing, or downhole equipment used.
•
Drilling suitable for near-surface geochemical sampling.
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
Auger Drilling
•
Hand auger drilling does not provide continuous core; recovery is based on
volume retrieved per 1m interval.
•
Sample quality and recovery were monitored in the field and deemed
acceptable; any compromised samples were noted and excluded if necessary.
•
No specific measures (e.g., twin holes, weights, or drilling additives) were used
to improve recovery, as hand auger is a basic geochemical technique.
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
Auger Drilling
•
Sample information was recorded at the time of sampling included, colour,
lithology, texture, moisture and visible HM mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
Channel sampling
•
Sample information was recorded at the time of sampling included, colour,
lithology, texture, moisture and visible HM mineralization.
•
GPS coordinates recorded at each site using handheld GPS (±5 m accuracy).
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
dy6metals.com | ASX:DY6
13
Sub- sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Auger and Channel samples were panned in the field
•
Material was manually panned in the field to produce a heavy mineral
concentrate (~200g).
•
Panning aimed to concentrate rutile and other heavy minerals for visible
assessment
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for field
duplicate/second-half sampling.
Quality of assay data and
laboratory tests
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established
Verification of sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
•
•
•
•
No third-party verification recorded.
No twinned boreholes were drilled.
Not recorded in the documentation provided to the consultant.
No adjustments to data have been recorded.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
dy6metals.com | ASX:DY6
14
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
Auger and Channel sampling
•
Hand-held Garmin G65S GPS.
•
UTM WGS84 Sector 32N.
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
Data spacing is not applicable for the release.
Reconnaissance program is not sufficient to establish a Mineral reserve
and or reserve
•
Samples were composited on length weighted basis to calculate weighted
average grades downhole.
Historical data
•
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective
Rutile & HMS projects in Cameroon
•
•
•
•
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
The measures taken to ensure sample security.
Sample security
The results of any audits or reviews of sampling techniques and data.
Drilling is completed in a vertical orientation with hand auger sampler orientated
by eye.
The program is at an early reconnaissance stage and was designed to test
surface and near-surface stratigraphy in coastal dune material. All holes were
drilled vertically. No clear mineralised structures have been identified to date,
and no sampling bias due to drilling orientation is considered material at this
stage.
•
All samples were collected and accounted for by DY6 employees/consultants.
All samples were bagged into plastic bags and closed with cable ties.
•
The appropriate manifest of sample numbers and a sample submission form
containing laboratory instructions will be submitted to the laboratory on delivery
to South Africa
No independent audits or reviews of the Eramet work have been undertaken.
•
Audits or reviews
dy6metals.com | ASX:DY6
15
Section 2: Reporting of Exploration Results
Criteria
Mineral tenement and land
tenure status
Exploration done by other
parties
Geology
JORC Code explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area
Acknowledgment and appraisal of exploration by other parties.
Deposit type, geological setting and style of mineralisation.
Commentary
Refer Appendix 1. Mungo, Mbanga and Mbongo are granted Permits held in name of
Rhino Resources Ltd. Maleke, Edea Sud and Diwong (formerly Missole) are Permit
applications by Rhino Resources. Nganda, Nsimbo, Kombo, Bounde and Alamba
are all Permit applications by Gorilla Mining Ltd.
No expiry date set. No impediments.
Only known exploration work was carried out on the Diwong Permit application by
Eramet in 2022. Eramet is a French multinational mining company which withdrew
from Cameroon in October 2023. Appraisal of this work is subject of report by Bob
Hatherly & Associates for the UK Honorary Consulate, Douala, Rep. of Cameroon.
Refer to ASX release dated 24 April 2025- Acquisition of highly prospective Rutile &
HMS projects in Cameroon
Geologically the Douala Basin is a coastal sedimentary basin consisting of a
package of mainly marine sedimentary formations of Cretaceous to Quaternary in
age. Thick, preserved sequences of sandy material are known to exist across the
tenement package and these are thought to represent palaeo-placer coastline dune
deposits.
These sedimentary environments are prospective for classic aeolian placer HMS
deposits which normally host accumulations of valuable heavy minerals such as
ilmenite, zircon, rutile and monazite.
Drill hole Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
•
Refer Table 1 - Reconnaissance auger drill holes completed to date at the
Douala Basin HMS Project showing maximum visual estimates of HM% from
panned concentrate of the 1m samples.
•
XYZ data based on hand held GPS
•
All drill and auger holes vertical
•
Down-hole length same as borehole depth. Mineralized sediments encountered
full length of all holes.
dy6metals.com | ASX:DY6
16
Data aggregation methods
Relationship between
mineralisation widths and
intercept lengths
Diagrams
Balanced Reporting
In reporting Exploration Results, weig
Share your feedback
Discover