Kasiya-Style Flake Graphite Confirmed at Central
Released
Released
Announcement PDF
Kasiya-Style Flake Graphite Confirmed
In-situ Rutile grades up to 0.88%
To engage with this announcement, visit the DY6 investor hub.
HIGHLIGHTS
Multiple thick rutile zones: Intersected from surface, including:
o 11m @ 0.49% inc. 4m @ 0.63% rutile inc. 1m @ 0.88% rutile
o 11m @ 0.47% inc. 3m @ 0.54% rutile
o 5m @ 0.51% inc. 3m @ 0.65% rutile inc. 1m @ 0.78% rutile
o 9m @ 0.42% inc. 3m @ 0.52% rutile
Dual-commodity advantage: Newly confirmed graphite results highlight a
compelling rutile-graphite system enhancing project value, with results
including:
o 2m @ 0.48% TGC inc. 1m @ 0.6% TGC (total graphitic carbon)
o 5.6m @ 0.3% TGC inc. 2m @ 0.5% TGC
o 9m @ 0.27% TGC
o 7m @ 0.29% TGC
o All holes assayed ended in graphite mineralisation, with grades
increasing into the saprolite horizon
Geological model validated: Flake graphite in lower mottled and saprolite zones
confirms the Central Rutile Project’s clear geological parallel to Sovereign Metals
world-class flake graphite and rutile project, Kasiya, in Malawi.
Previous reconnaissance auger drilling and channel sampling returned up to
1.57% and 2.1% in-situ rutile.
Low-cost, high-margin production potential: Saprolite-hosted flake graphite is
accessible and simple to process with low opex compared to hard rock deposits.
Follow-up drilling will target deeper, higher-grade zones: Systematic exploration
at Bounde and Nganda comprising regional soil sampling and targeted hand auger
drilling to delineate higher grade rutile and graphite zones is ongoing.
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce rutile and graphite
assays from reconnaissance auger drilling at the Nsimbo and Alamba licences, key prospects
within the Central Rutile Project in Cameroon. These results highlight the project’s world-class
potential and strengthen DY6’s position in the fast-growing critical minerals sector.
Following visual confirmation of flake graphite in multiple holes, DY6 submitted 47 samples
from 7 holes to Intertek Ghana for detailed analysis. The occurrence of flake graphite within
the lower mottled and saprolite horizons strongly validates the Project’s geological model
and highlights a clear geological parallel to Sovereign Metals’ world-class graphite and rutile
ASX Announcement
ASX:DY6
25 November 2025
dy6metals.com | ASX:DY6 2
project, Kasiya, in Malawi. All holes assayed ended in graphite mineralisation, with grades
increasing into the saprolite horizon. This mirrors the Kasiya profile and highlights the
significant depth potential at the Central Rutile Project.
The reconnaissance campaign was executed on a wide-spaced 2x1km single staggered
pattern grid, along the northern border of Alamba and Nsimbo, with holes drilled to a maximum
depth of 11m. This reconnaissance campaign was planned in order to test potential extension
of mineralisation intersected by Lion Rock Minerals on their Afanloum permit north of Nsimbi
and Alamba1, as well as to test the mineralisation potential of the garnet, kyanite paragneiss
geological unit in that area.
Both rutile and flake graphite mineralisation remain open at the base of multiple holes,
confirming significant depth potential for high-grade zones throughout the Central Rutile
Project.
Auger drilling is currently underway at the Company’s Bounde and Nganda licences west of
Yaounde, with ongoing auger drilling to be guided by results of the systematic soil sampling
programme.
CEO, Cliff Fitzhenry, commented:
“These results mark a significant and transformational step forward for the Central Rutile
Project. The discovery of flake graphite mineralisation within the mottled clay and saprolite
horizons shows a clear Kasiya-style enrichment profile. The prospects demonstrate clean,
saprolite-hosted and free-dig graphite, with grades increasing into the saprolite horizon and
remaining open in all holes assayed to date.
Importantly, with the strong, natural rutile prospectivity of the project, these results point to the
exciting dual commodity opportunity for the Central Rutile Project. Combining premium, high-
purity natural rutile potential near surface along with high-quality, flake graphite is a game-
changing development. These results could position the project as a strategic, low-cost, multi-
commodity, critical minerals asset in West Africa. We are continuing our project-wide soil
sampling, as well as targeted hand-auger drilling, across the project.”
Next Steps
• Ongoing auger drilling: Expanding coverage at Bounde and Nganda, guided by
systematic soil sampling results.
• Follow-up targeting: Verification drilling of historical data along with deeper drilling to
define high-grade rutile and graphite zones.
• Assay results: Onsite laboratory to fast-track results, significantly improving
turnaround times and providing a steady stream of news flow.
1
Refer to Lion Rock Minerals ASX announcement dated 12 August 2025 “Drilling confirms the expansion of major mineralized system at Minta”
dy6metals.com | ASX:DY6 3
Figure 1: Map showing the location of the 24 mechanised auger drill holes drilled on the Nsimbo and
Alamba licences at the Central Rutile Project.
Figure 2: Image depicting disseminated flake graphite (0.6%) with metallic grey lustre and streaks,
hosted in a ferruginous clay matrix within the mottled zone (ALAAU004, 8–9 m), observed during
desliming.
dy6metals.com | ASX:DY6 4
Figure 3: Image depicting disseminated flake graphite (0.47%) with metallic grey lustre and streaks,
hosted in a ferruginous clay matrix within the mottled zone (ALAAU001, 9–10 m), observed during
desliming.
Figure 4: Regional geological map with the 24 drilled mechanised auger reconnaissance holes and
the significant intercepts labelled.
dy6metals.com | ASX:DY6 5
Table 1: Auger drilling results (rutile only), Central Rutile Project (UTM32N & UTM33N).
Tenement HoleID
Interval
Thickness
Rutile %
From (m)
Downhole
Comments
Alamba ALAAU001 11 0.47% Surface Open at depth
Alamba incl 3 0.54% 8
Alamba ALAAU004 9 0.42% Surface Open at depth
Alamba incl 3 0.52% 6
Alamba ALAAU008 10 0.39% Surface Open at depth
Alamba incl 3 0.51% Surface
Alamba ALAAU010 8 0.35% Surface Open at depth
Alamba ALAAU011 5 0.51% Surface Open at depth
Alamba incl 3 0.65% 2
Nsimbo NSIAU003 11 0.49% Surface Open at depth
Nsimbo incl 4 0.63% 5
Nsimbo NSIAU006 11 0.43% Surface Open at depth
Nsimbo incl 4 0.54% 5.8
Nsimbo NSIAU008 11 0.41% Surface Open at depth
Nsimbo incl 3 0.48% 7
Nsimbo NSIAU009 10.7 0.36% Surface Open at depth
Nsimbo incl 2.7 0.5% Surface
*Note: only holes with >0.5% rutile intercept are reported above
Table 2: Auger drilling results (graphite only), Central Rutile Project (UTM32N & UTM33N).
Tenement HoleID
Interval
Thickness m
%
Graphite
From (m)
Downhole
Comments
Nsimbo NSIAU004 4.75 0.23% 5.4
Nsimbo NSIAU006 8.2 0.21% 2.8
Nsimbo NSIAU008 4 0.18% 7
Nsimbo NSIAU010 9 0.27% 2
Alamba ALAAU001 7 0.29% 4
Alamba ALAAU004 2 0.48% 7 Including 1m @ 0.6%
Alamba ALAAU005 5.6 0.33% 3 Including 2m @ 0.5%
Central Rutile Project
The Central Rutile Project consists of 21 exploration permits2 under valid applications covering
8,782km2 across an area rapidly emerging as a globally significant rutile province within
Central Cameroon. The project area is predominantly underlain by ± garnet mica-schist and
kyanite bearing paragneiss bedrock (see Figure 6), which are considered the primary source
of rutile. During in-situ weathering, rutile is liberated from the bedrock and progressively
concentrated and upgraded within the overlying saprolite layer. This forms an in-situ, eluvial
saprolite hosted rutile deposit analogous to Sovereign Metal’s Tier 1 Kasiya deposit in Malawi
(the world’s largest primary rutile deposit with 1.8 billion tons at 1.0% rutile and 1.4% graphite).
Graphite tends to be predominantly concentrated within the mottled and saprolite zones, as
it is progressively oxidized and degraded near the surface. The concentration typically
increases with depth within the lower mottled and saprolite horizons, reflecting partial
preservation in less oxidized conditions deeper in the profile.
The exploration model further proposes that subsequent erosion and fluvial transport rework
these materials, concentrating rutile and other valuable heavy minerals into alluvial deposits.
Historical production figures from the area between 1935 and 1955 have recorded some
15,000 tons of high-purity (>95 %) rutile being produced from 3 main production centres, with
Yaoundé West being one of them.
2
7 exploration permits, making up the Yaounde West package, are subject to completion of the transaction.
dy6metals.com | ASX:DY6 6
Figure 6: Map of Central Cameroon showing DY6’s Central Rutile Project which encompasses
8,782km2
of prime geological terrain highly prospective for residual, natural rutile mineralisation. Note:
The Company has entered into a binding term sheet to acquire the Yaounde West licence package (in
red) subject to completion of the transaction. Refer ASX announcement dated 15 September 2025.
-ENDS-
This announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith Mr Cliff Fitzhenry
Executive Chairman Chief Executive Officer
dan.smith@dy6metals.com Clifford.fitzhenry@dy6metals.com
For Investor or media related enquiries:
Jessica Fertig
Tau Media
jessica@taumedia.com.au
dy6metals.com | ASX:DY6 7
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Central Rutile Project, is based on information compiled by Mr Clifford Fitzhenry, a
Competent Person who is a Registered Professional Natural Scientist with the Council for Natural
Scientific Professionals (SACNASP). Mr Fitzhenry is the Company’s CEO and has sufficient experience
which is relevant to the style of mineralization and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Fitzhenry consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Table 3: Drill hole data, Central Rutile Project (UTM32N & UTM33N).
Tenement HoleID Easting Northing RL UTM Depth (m)
Alamba ALAAU001 814453 440896 723 UTM_32N 11
Alamba ALAAU002 815759 442624 717 UTM_32N 11
Alamba ALAAU003 818033 442707 656 UTM_32N 10
Alamba ALAAU004 820730 442055 710 UTM_32N 9
Alamba ALAAU005 822638 442755 707 UTM_32N 8.6
Alamba ALAAU006 825463 441901 743 UTM_32N 11
Alamba ALAAU007 827252 442467 758 UTM_32N 11
Alamba ALAAU008 830096 441914 670 UTM_32N 10
Alamba ALAAU009 831894 442790 652 UTM_32N 9
Alamba ALAAU010 168467 441875 651 UTM_33N 8
Alamba ALAAU011 170175 442779 631 UTM_33N 5
Nsimbo NSIAU001 172883 441781 653 UTM_33N 9.7
Nsimbo NSIAU002 174376 443639 719 UTM_33N 11
Nsimbo NSIAU003 173355 445310 654 UTM_33N 11
Nsimbo NSIAU004 174600 447108 662 UTM_33N 11
Nsimbo NSIAU005 174099 448004 670 UTM_33N 8.30
Nsimbo NSIAU006 176929 447134 724 UTM_33N 11
Nsimbo NSIAU007 178726 448063 675 UTM_33N 10
Nsimbo NSIAU008 181517 447090 726 UTM_33N 11
Nsimbo NSIAU009 183348 447979 731 UTM_33N 10
Nsimbo NSIAU010 186168 447120 712 UTM_33N 11
Nsimbo NSIAU011 187962 447987 700 UTM_33N 11
Nsimbo NSIAU012 190781 447104 682 UTM_33N 10
Nsimbo NSIAU013 192362 447980 687 UTM_33N 8.60
*All holes were vertical.
dy6metals.com | ASX:DY6 8
Table 4: Reconnaissance hand-auger drilling significant assay results, Central Rutile Project.
HoleID
From
(m)
To
(m)
Interval
m
%
Rutile
Bulk
% TGC
NSIAU006 0,00 0,80 0,80 0,51
NSIAU006 0,80 1,80 1,00 0,33
NSIAU006 1,80 2,80 1,00 0,28
NSIAU006 2,80 3,80 1,00 0,32 0,23
NSIAU006 3,80 4,80 1,00 0,33 0,19
NSIAU006 4,80 5,80 1,00 0,40 0,20
NSIAU006 5,80 6,80 1,00 0,52 0,20
NSIAU006 6,80 7,80 1,00 0,65 0,19
NSIAU006 7,80 8,80 1,00 0,48 0,35
NSIAU006 8,80 9,80 1,00 0,53 0,20
NSIAU006 9,80 11,00 1,20 0,42 0,11
NSIAU004 0,00 1,00 1,00 0,36
NSIAU004 1,00 2,00 1,00 0,40
NSIAU004 2,00 3,00 1,00 0,33
NSIAU004 3,00 4,00 1,00 0,39
NSIAU004 4,00 5,40 1,40 0,35
NSIAU004 5,40 6,40 1,00 0,26 0,19
NSIAU004 6,40 8,15 1,75 0,23 0,24
NSIAU004 8,15 9,15 1,00 0,29 0,25
NSIAU004 9,15 10,15 1,00 0,16 0,24
NSIAU009 0,00 1,00 1,00 0,50
NSIAU009 1,00 2,00 1,00 0,52
NSIAU009 2,00 2,70 0,70 0,48
NSIAU009 2,70 4,00 1,30 0,21
NSIAU009 4,00 5,00 1,00 0,23
NSIAU009 5,00 6,00 1,00 0,31
NSIAU009 6,00 7,00 1,00 0,23
NSIAU009 7,00 8,00 1,00 0,37
NSIAU009 8,00 9,00 1,00 0,22
NSIAU009 9,00 10,00 1,00 0,50
NSIAU009 10,00 10,70 0,70 0,47
NSIAU003 0,00 1,00 1,00 0,42
NSIAU003 1,00 2,00 1,00 0,42
NSIAU003 2,00 3,00 1,00 0,39
NSIAU003 3,00 4,00 1,00 0,39
NSIAU003 4,00 5,00 1,00 0,44
NSIAU003 5,00 6,00 1,00 0,46
NSIAU003 6,00 7,00 1,00 0,88
NSIAU003 7,00 8,00 1,00 0,43
NSIAU003 8,00 9,00 1,00 0,74
NSIAU003 9,00 10,00 1,00 0,45
NSIAU003 10,00 11,00 1,00 0,42
NSIAU008 0,00 1,00 1,00 0,43
NSIAU008 1,00 2,00 1,00 0,42
NSIAU008 2,00 3,00 1,00 0,35
NSIAU008 3,00 4,00 1,00 0,42
NSIAU008 4,00 5,00 1,00 0,40
NSIAU008 5,00 6,00 1,00 0,37 0,06
NSIAU008 6,00 7,00 1,00 0,32 0,08
NSIAU008 7,00 8,00 1,00 0,61 0,22
NSIAU008 8,00 9,00 1,00 0,43 0,20
NSIAU008 9,00 10,00 1,00 0,41 0,16
NSIAU008 10,00 11,00 1,00 0,32 0,13
NSIAU010 0,00 1,00 1,00 0,39
dy6metals.com | ASX:DY6 9
HoleID
From
(m)
To
(m)
Interval
m
%
Rutile
Bulk
% TGC
NSIAU010 1,00 2,00 1,00 0,19
NSIAU010 2,00 3,00 1,00 0,17 0,20
NSIAU010 3,00 4,00 1,00 0,22 0,20
NSIAU010 4,00 5,00 1,00 0,21 0,23
NSIAU010 5,00 6,00 1,00 0,23 0,20
NSIAU010 6,00 7,00 1,00 0,09 0,26
NSIAU010 7,00 8,00 1,00 0,04 0,31
NSIAU010 8,00 9,00 1,00 0,03 0,34
NSIAU010 9,00 10,00 1,00 0,03 0,30
NSIAU010 10,00 11,00 1,00 0,02 0,34
ALAAU001 0,00 1,00 1,00 0,46
ALAAU001 1,00 2,00 1,00 0,43
ALAAU001 2,00 3,00 1,00 0,44
ALAAU001 3,00 4,00 1,00 0,47
ALAAU001 4,00 5,00 1,00 0,41 0,25
ALAAU001 5,00 6,00 1,00 0,47 0,22
ALAAU001 6,00 7,00 1,00 0,42 0,26
ALAAU001 7,00 8,00 1,00 0,41 0,17
ALAAU001 8,00 9,00 1,00 0,53 0,30
ALAAU001 9,00 10,00 1,00 0,48 0,47
ALAAU001 10,00 11,00 1,00 0,60 0,33
ALAAU004 0,00 1,00 1,00 0,58
ALAAU004 1,00 2,00 1,00 0,37
ALAAU004 2,00 3,00 1,00 0,20 0,09
ALAAU004 3,00 4,00 1,00 0,28 0,08
ALAAU004 4,00 5,00 1,00 0,35 0,13
ALAAU004 5,00 6,00 1,00 0,45 0,11
ALAAU004 6,00 7,00 1,00 0,61 0,14
ALAAU004 7,00 8,00 1,00 0,46 0,35
ALAAU004 8,00 9,00 1,00 0,49 0,60
ALAAU005 0,00 1,00 1,00 0,47
ALAAU005 1,00 2,00 1,00 0,15
ALAAU005 2,00 3,00 1,00 0,13
ALAAU005 3,00 4,00 1,00 0,11 0,15
ALAAU005 4,00 5,00 1,00 0,18 0,20
ALAAU005 5,00 6,00 1,00 0,18 0,28
ALAAU005 6,00 7,00 1,00 0,14 0,34
ALAAU005 7,00 8,00 1,00 0,10 0,57
ALAAU005 8,00 8,60 0,60 0,07 0,43
ALAAU008 0,00 1,00 1,00 0,52
ALAAU008 1,00 2,00 1,00 0,53
ALAAU008 2,00 3,00 1,00 0,48
ALAAU008 3,00 4,00 1,00 0,17
ALAAU008 4,00 5,00 1,00 0,47
ALAAU008 5,00 6,00 1,00 0,45
ALAAU008 6,00 7,00 1,00 0,41
ALAAU008 7,00 8,00 1,00 0,43
ALAAU008 8,00 9,00 1,00 0,22
ALAAU008 9,00 10,00 1,00 0,24
ALAAU010 0,00 1,00 1,00 0,57
ALAAU010 1,00 2,00 1,00 0,14
ALAAU010 2,00 3,00 1,00 0,26
ALAAU010 3,00 4,00 1,00 0,46
ALAAU010 4,00 5,00 1,00 0,28
ALAAU010 5,00 6,00 1,00 0,45
ALAAU010 6,00 7,00 1,00 0,58
dy6metals.com | ASX:DY6 10
HoleID
From
(m)
To
(m)
Interval
m
%
Rutile
Bulk
% TGC
ALAAU010 7,00 8,00 1,00 0,04
ALAAU011 0,00 1,00 1,00 0,25
ALAAU011 1,00 2,00 1,00 0,38
ALAAU011 2,00 3,00 1,00 0,50
ALAAU011 3,00 4,00 1,00 0,66
ALAAU011 4,00 5,00 1,00 0,78
dy6metals.com | ASX:DY6 11
JORC Code, 2012 Edition – Table 1 report
Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling Techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases, more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Auger Drilling
• Samples collected using a manually operated motorized auger with a
100 mm bit diameter.
• Drilling sites were carefully selected to avoid disturbed areas, including
zones of active erosion and any man-made features.
• Drilling targeted weathered saprolite profiles
• Samples taken at regular 1m intervals downhole from surface.
• Samples were dried and stored on site under the supervision of a DY6
employee or consultant.
• Dried samples were securely stored and transported to the in-country
preparation facility in Yaoundé.
• Each 1m bulk sample (average 4.7 kg) was split to 1.5 kg sub-sample
using a riffle splitter at the companies in-country preparation facility for HM
analysis.
• A further 1.5 kg sub-sample was taken for graphite analysis on selected
holes.
• Samples were shipped to Scientific Services in Cape Town, South Africa,
for HM and XRF analysis.
• XRD analysis was completed by XRD Analytical & Consulting in Pretoria,
South Africa.
• Graphite samples were prepared by Interlink in Gabon and sent to their
laboratory in Ghana for analysis.
• Industry best practice was applied throughout sample preparation to
minimise the risk of contamination.
• Industry-standard procedures were followed for the collection, handling
and processing of samples for assay.
• A total of 24 drillholes have been completed.
Database Management
• For Database control and management the company has changed this
programs collar ID’s from previous releases. Please note that the
nomenclature and the hole sequence stays the same only three (3) zero’s
(0) was removed to shorten the ID. Please see the ID changes below.
Collar ID New Collar ID
ALAAU000001 ALAAU001
ALAAU000002 ALAAU002
ALAAU000003 ALAAU003
dy6metals.com | ASX:DY6 12
ALAAU000004 ALAAU004
ALAAU000005 ALAAU005
ALAAU000006 ALAAU006
ALAAU000007 ALAAU007
ALAAU000008 ALAAU008
ALAAU000009 ALAAU009
ALAAU000010 ALAAU010
ALAAU000011 ALAAU011
NSIAU000001 NSIAU001
NSIAU000002 NSIAU002
NSIAU000003 NSIAU003
NSIAU000004 NSIAU004
NSIAU000005 NSIAU005
NSIAU000006 NSIAU006
NSIAU000007 NSIAU007
NSIAU000008 NSIAU008
NSIAU000009 NSIAU009
NSIAU000010 NSIAU010
NSIAU000011 NSIAU011
NSIAU000012 NSIAU012
NSIAU000013 NSIAU013
Refer to ASX release: 11 August 2025: XRF analysis confirms high-quality of natural
rutile, for grab samples
Refer ASX release: 15 September 2025: DY6 Acquires Previous Rutile Mining Site,
Expanding Project Landholding to 8,782km2
Drilling techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face- sampling bit or other type,
whether core is oriented and if so, by what method, etc)
Auger drilling
• Vertical auger drilling conducted using manually operated motorized auger
with 100mm diameter bit.
• Drilling continued until blade refusal or end of rods for the machine.
• No drilling fluids, casing, or downhole equipment used.
• Drilling suitable for near-surface geochemical sampling.
Drill sample recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Auger drilling
• Auger drilling does not provide continuous core; recovery is based on
volume retrieved per 1m interval.
• Sample quality and recovery were monitored in the field and deemed
acceptable; any compromised samples were noted and excluded if
necessary.
• No specific measures (e.g., twin holes, weights, or drilling additives) were
used to improve recovery, as augering is a basic sampling technique.
dy6metals.com | ASX:DY6 13
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Auger drilling
• Sample information was recorder at the time of sampling included colour,
lithology, texture, alteration, moisture and mineralisation.
• GPS coordinates recorded at each site using handheld GPS (±5 m
accuracy).
Sub- sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in-
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Auger Drilling:
• Samples were collected downhole using a manually operated motorized
auger at 1m intervals
• Each sample was individually bagged, tagged, and assigned a unique
sample ID.
• Lab-duplicates were collected every 20 samples for QAQC purposes.
• QA/QC inserts followed a fixed sequence: CRM every 10 samples, lab
duplicate every 5 samples thereafter, and a blank every subsequent 5
samples
• The samples were air dried and crushed
• The samples were split using a rifle splitter to a representative 1.5kg size
• The 1.5kg samples were dried for 4 hours at 105 °C in and oven and
weighed
• The sample were deslimed at -45-600micron 600micron-1mm and +1mm
fractions
• The deslimed samples was dried at 105 °C for 12 hours in an oven and
weighed.
• Sample were shipped to Scientific Services in Cape Town, South Africa for
further prep work
• Heavy liquid separation (HLS) conducted using Tetrabromoethane (TBE)
on -45-600micron 600micron-1mm fraction.
• Sample placed into beaker containing TBE.
• Material agitated using a mechanical shaker and allowed to settle.
• Process repeated minimum of three times to ensure complete separation.
• Settling time monitored visually until clear separation observed.
• Heavy fraction (concentrate) recovered, rinsed with acetone to remove
TBE, and dried.
• Light fraction (floats) dried similarly and discarded.
• +1mm fraction was crushed and XRF
• Crushing: Boyd crusher is used to crush the entire sample at 2mm, 90%
passing 2mm if required.
• Quarts rocks as well as thorough brushing and compressed air are used
between each sample to ensure no contamination.
• Milling: Ca steel milling pots are used (either 100CC or 250CC depending
on the sample size). Samples milled to 90% passing 75um.
• Quartz pieces as well as thorough brushing and compressed air are used
between each sample.
• Quality Control: Every 40th sample is sieved on crushing and milling to
ensure material is efficiently passing 2mm and 75um.
dy6metals.com | ASX:DY6 14
• HM conc for each fraction was used for analysis.
Graphite
Sample prep was performed by Intertek in Gabon
• Sample was dried, crushed and pulverize to 85% passing 75 microns
Quality of assay data and
laboratory tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established
XRF Technique
• HM Sample analysis was performed by Scientific Services in Cape Town,
South Africa.
• Drying: The milled material is dried at 105degrees Celius for 4 hours.
• Loss/Gain on Ignition: Samples loss or gain is measured, 4 hours in a
furnace at 900degrees Celsius.
• Fused beads: Samples are mixed with a Micro-bead Fusion Flux (Pre-
fused Lithium Borates).
• Fused: The samples are fused into beads using a X-600 X-Fluxer with Pt
crucible and moulds.
• XRF: Rigaku, ZSX Primus III+, WDXRF.
• All Certified Reference Materials (CRM’s) are mixed with a Micro-bead
Fusion Flux (Pre-fused Lithium Borates). Samples are analysed on a
programme named ‘Mineral Sands’ which consists of 25 CRM’s. A blank
(AMIS0577) is prepared every 40th sample. A blank and CRMs are
analysed as unknowns throughout the batches for laboratory QAQC
performance monitoring.
• All of the QAQC data has been statistically assessed, 100% within
acceptable QAQC limits as stated by the standard deviation stipulated on
the certificate for the reference material used
XRD Technique
• Sample analysis was performed by XRD Analytical & Consulting in
Pretoria, South Africa.
• Pulverized samples prepared using backloading method for XRD analysis.
• Diffractograms collected with Malvern Panalytical Aeris diffractometer
(PIXcel detector, fixed slits, Fe-filtered Co-Kα radiation).
• Phase identification carried out with X’Pert Highscore Plus software.
• Quantitative phase analysis performed using Rietveld refinement.
• Results below 0.5 wt% not reported (below quantification limit).
• Selected samples re-analysed and validated against XRF results.
Intertek
TGC was performed by Intertek Ghana
• The sample was treated with a weak acid, diluted HCl to dissolve and
remove non-graphitic carbon
• The residue from the acid digestion was roasted at 420°C to remove any
residual organic carbon
• The sample which contains the graphitic carbon, is then analysed using a
Carbon/Sulfur (CS) analyser. The analyser uses high-temperature
combustion furnace and infrared (IR) spectroscopy to determine the TGC.
• Detection limit of 0.1% to 40% TGC
• Intertek inserts internal QAQC at regular intervals
dy6metals.com | ASX:DY6 15
Verification of sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
• No third-party verification recorded.
• No twinned boreholes were drilled.
• No adjustments to data have been recorded.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control
All Sample points
• Hand-held Garmin G65S GPS.
• UTM WGS84 Sector 33N.
• UTM WGS84 Sector 32N
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
• The auger drilling was completed on a 2km x 1km staggered single point
recon grid spacing on Alambo and Nsimbo.
• Auger drilling reconnaissance program is not sufficient to establish a
Mineral resource and or reserve
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
• Drilling is completed in a vertical orientation with manual operated
motorized auger sampler and orientated by eye.
• The program is at an early reconnaissance stage and was designed to test
surface and near-surface stratigraphy in residual regolith material based
on the high HM results of Lion Rock minerals in th
Share your feedback
Discover