Highly Prospective Rutile & HMS Project Acquisition
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
24 April 2025
Acquisition of highly prospective Rutile & HMS
projects in Cameroon
HIGHLIGHTS
Binding agreement to acquire a 100% interest in two, large Rutile and Heavy Mineral
Sands (HMS) projects in Cameroon
o
The Central Rutile Project (2,140km2) is a prime land holding within an
emerging, globally significant rutile province in Central Cameroon
o
The Project borders, and is underlain by the same geology as, Peak Minerals’
(ASX:PUA) Minta Project, and is prospective for potential residual, saprolitehosted rutile deposits analogous to Sovereign Metals’ (ASX:SVM) Tier 1 Kasiya
rutile deposit in Malawi
o
The Douala Basin Project (2,580km2) contains known palaeo-placer coastline
sand deposits with visible VHM (rutile and zircon) present
o
Historical sonic drilling at Douala by Eramet delivered significant intercepts from
the Diwong licence, including:
•
10m @ 5.0% THM from surface (DIB_S00024)
•
12m @ 4.7% THM from surface (DIB_S00018)
•
7.7m @ 4.0% THM from surface (DIB_S00022)
•
18m @ 3.7% THM from surface, ending in mineralisation (DIB_S00010)
Engagement of experienced mining executive Cliff Fitzhenry (ex-Rio Tinto,
Sovereign Metals) as technical consultant to help oversee exploration at Central and
Douala Basin
Reconnaissance mapping and hand auger drilling to be undertaken immediately at
the Central Rutile Project
Firm commitments received for a placement to raise $400,000 at $0.04 per share
Proposed acquisition complements DY6’s existing REE and critical minerals projects
in Malawi, with results from recent sampling programs due in the coming weeks
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce the execution of a
binding agreement to acquire a 100% interest in two large and highly prospective rutile and
heavy mineral sands (HMS) projects in Cameroon (Acquisition). The Acquisition will see DY6
acquire Aardvark Minerals Pty Ltd and EKOM Metals Pty Ltd, which together hold the
following exploration permits and applications through their wholly owned Cameroonian
subsidiaries:
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com
Gorilla Mining Ltd - 5 exploration permits under valid application over 2,140km2
comprising the Central Project, which is considered prospective for residual,
saprolite hosted rutile; and
Rhino Resources Ltd - 3 exploration licences and 3 valid exploration permit
applications over 2,580km2, comprising the Douala Project, which is considered
prospective for coastal placer style HMS.
Non-executive Chairman, Dan Smith, commented: “We believe that Cameroon is shaping up
to become a new frontier for major rutile discoveries. The proposed acquisition will position
DY6 to be a major player in this exciting sector.
Through securing the services of Cliff Fitzhenry, the Company has a wealth of knowledge to
tap into in driving Central and Douala forward.”
Technical Consultant, Cliff Fitzhenry, commented: “This acquisition provides DY6 with a highly
prospective mineral sands portfolio targeting two mineralisation styles. The Douala Basin
Project has known paleo-placer coastline dunes with thick sand packages and visible VHM
present, while the Central Project has all the right indicators to be prospective for residual
placer saprolite hosted rutile deposits.”
Background on the Projects
Central
The Central Rutile Project consists of 5 exploration permits (Nganda, Bounde, Kombo, Alamba
and Nsimbo) under valid applications covering 2,140km2 across an area rapidly emerging as
a globally significant rutile province within Central Cameroon. The Project area is
predominately underlain by a bedrock of kyanite-bearing mica schist which is thought to be
the primary source of the rutile which is then concentrated and upgraded in the overlying
saprolite material during the in-situ weathering process. This forms an in-situ, eluvial saprolite
hosted rutile deposit target type analogous to Sovereign Metal’s Tier 1 Kasiya deposit in
Malawi (the world’s largest primary rutile deposit at 1.8 billion tons at 1.0% rutile).
The exploration model then surmises that erosion, transporting and reworking by rivers then
concentrate the rutile (and other valuable heavy minerals) into alluvial deposits. Historical
production figures from the area between 1935 and 1955 have recorded some 15,000 tons of
high purity (>95 %) rutile being produced from artisanal mining of the alluvial deposits around
Nanga-Eboko. The Central Rutile Project borders Peak Mineral’s Minta Rutile Project where
initial sampling has revealed widespread, high-value mineral assemblages with valuable
heavy minerals (VHM) up to 93% of total heavy minerals (THM) and with the dominant VHM’s
being rutile (up to 69.8%), monazite (up to 35.6%) and zircon (up to 21.5%) (see PUA
Announcement “First systematic exploration programme discovers significant rutile province
in Cameroon” dated 4 February 2025).
dy6metals.com | ASX:DY6
2
Figure 1: DY6’s Central Rutile Project comprises 5 licence blocks which border Peak Mineral’s Minta
Project in Central Cameroon.
Douala
The Douala Basin HMS Project consists of 3 granted exploration permits and 3 exploration
permits under valid applications. The Edea Sud licence is a fully granted permit covering an
area of 440km2 whilst the 5 licence applications (Mbanga, Maleke, Mungo, Diwong, and
Mbongo) cover an area of 2,140km2 giving the total project package a land endowment of
2,580km2 across the Douala Basin of Western Cameroon. The tenements are all located within
50km of the deep-water port city of Douala.
Geologically the Douala Basin is a coastal sedimentary basin consisting of a package of
mainly marine sedimentary formations of Cretaceous to Quaternary in age. Thick, preserved
sequences of sandy material are known to exist across the tenement package and these are
thought to represent palaeo-placer coastline dune deposits. These sedimentary environments
are prospective for classic aeolian placer HMS deposits which normally host accumulations
of valuable heavy minerals such as ilmenite, zircon, rutile and monazite. The Diwong licence
was previously known as the Missole Project was held by the French multinational Eramet.
Eramet drilled some 60 sonic holes on the Project for 1,080m (582 samples) with 39 hand
auger holes for 190m (39 samples) specially targeting rutile and zircon. The drilling intersected
thick sequences of sands and confirmed the presence of rutile and zircon within the valuable
dy6metals.com | ASX:DY6
3
heavy mineral assemblage (Table 3). Eramet discontinued the Project when it exited
Cameroon in 2023 primarily due to the unsuitable setting of the mineralisation within its core
Central Cameroon project Akonalinga (which targeted alluvial placer rutile deposits within the
lower lying river systems).
Figure 2: DY6’s Douala Basin Project comprises 6 licence blocks proximal to the port city of Douala
along Cameroon’s coast.
dy6metals.com | ASX:DY6
4
Why Rutile?
Rutile is highly sought-after by end users as it is the purest, highest-grade naturally occurring
form of titanium. Titanium serves a range of industrial markets due to its remarkable properties.
Titanium is highly corrosion resistant and chemically inert while offering a high strength-toweight ratio. In its form as titanium dioxide, titanium feedstock is also essential for pigment
manufacturing, for example in paints and paper. Titanium is used extensively in aerospace,
defence, healthcare, and technology applications, due to its inherent properties.
With the ongoing depletion of reserves of existing operations as well as declining ore grades,
global rutile supply is projected to decline sharply. Outside of Sovereign Metals’ Kasiya Rutile
Project in Malawi there are limited new deposits forecast to come online in the near term.
Appointment of Technical Consultant
To help drive the exploration and development of the Central and Douala projects, DY6 has
secured the consulting services of Mr Cliff Fitzhenry. Mr. Fitzhenry is a technically strong,
seasoned exploration geologist with a solid track record spanning over 20 years of critical
minerals and precious metals exploration throughout Africa and the Middle East.
He has held senior management positions, successfully leading teams across all aspects of
exploration, development and feasibility studies. He is currently the Chief Exploration and
Project Manager (Africa) for Askari Metals (ASX:AS2) and was previously the Senior Geologist
for Sovereign Metals Limited (ASX. SVM) where he led the in-country exploration activities
delivering the maiden mineral resource estimate, and subsequent resource upgrades, of the
Tier 1 Kasiya rutile-graphite project in Malawi. This culminated in Kasiya being regarded as
the world’s largest natural rutile deposit and second largest flake graphite deposit at 1.8 billion
tonnes at 1.0% rutile and 1.4% graphite respectively.
Mr. Fitzhenry holds MSc and BSc Honours (cum laude) degrees from the University of
KwaZulu Natal (South Africa) and is a Registered Professional Natural Scientist in South
Africa. Mr. Fitzhenry is engaged under a consulting agreement at the rate of A$1,000 per day
(exclusive of GST) commencing 23 April 2025.
Planned Work Programs
Following completion of the Acquisition, the Company proposes to undertake further due
diligence on the Central and Douala Basin Projects, including compilation and analysis of all
available historical data and preliminary reconnaissance work at the Project sites, ahead of
an initial exploration program.
The first phase of exploration will comprise detailed geological mapping of the defined
exploration targets, along with hand auger drilling across defined targets. The Company will
also commence engagement with relevant Government authorities, regional stakeholders and
local communities regarding the planned exploration programs.
dy6metals.com | ASX:DY6
5
Key terms of the Acquisition
The Company has entered into a binding agreement with Gondwana Capital Pty Ltd
(Gondwana) (an unrelated party to the Company), to acquire 100% of the issued capital of
Aardvark Minerals Pty Ltd (Aardvark) and EKOM Metals Pty Ltd (EKOM).
EKOM, through its wholly owned Cameroonian subsidiary, Gorilla Mining Ltd, is the 100%
legal and beneficial owner of 5 valid exploration permit applications comprising the Central
Project, as set out in the Appendix.
Aardvark, through its wholly owned Cameroonian subsidiary, Rhino Resources Ltd, is the
100% legal and beneficial owner of 3 exploration licences and 3 valid exploration permit
applications comprising the Douala Project, as set out in the Appendix.
In consideration for the Acquisition, subject to shareholder approval, the Company will pay the
vendor the following:
•
Upfront Consideration:
o
o
•
$200,000 in cash; and
5,000,000 fully paid ordinary shares at a deemed issue price of $0.04 per share
(approximate value of $200,000),
(together, the Upfront Consideration).
Deferred Consideration:
$150,000 in cash and 5,000,000 performance rights which will convert into fully paid
ordinary shares (on a 1 for 1 basis) at a deemed issue price of $0.04 per share, upon
the successful granting of all licence applications set out in the Appendix into new
exploration licences, within 6 months from the date of completion of the Acquisition
(Tranche 1 Deferred Consideration);
o 4,000,000 performance rights which will convert into fully paid ordinary shares (on
a 1 for 1 basis) at a deemed issue price of $0.04 per share, upon the Company
achieving at least 5 drill intercepts of either 5m or greater at a minimum grade of 2%
HMS, or 10m or greater at a minimum grade of 1% HMS at the Projects, within 18
months of the date of completion of the Acquisition (Tranche 2 Deferred
Consideration); and
o 6,000,000 performance rights which will convert into fully paid ordinary shares
(on a 1 for 1 basis) at a deemed issue price of $0.04 per share, upon the Company
successfully delineating a JORC or NI43-101 compliant mineral resource at the
Projects of a minimum of 50Mt having a minimum grade of at least 1% HMS, within
36 months of the date of completion of the Acquisition (Tranche 3 Deferred
Consideration),
(together, the Deferred Consideration).
o
The issue of the securities constituting the Upfront Consideration and Deferred Consideration
are both subject to the approval of Shareholders pursuant to ASX Listing Rule 7.1. The
Company will seek this Shareholder approval at an Extraordinary General Meeting, expected
to be held in early June 2025 (EGM).
Completion of the Acquisition is subject to the satisfaction of certain conditions precedent,
including:
dy6metals.com | ASX:DY6
6
•
Due diligence: completion of due diligence on the Aardvark (and its subsidiaries),
EKOM (and its subsidiaries) and the Projects by the Company to its satisfaction;
•
Shareholder approvals: the Company having obtained all necessary shareholder and
regulatory approvals required to complete the Acquisition;
•
Regulatory and third-party approvals: the Company obtaining all necessary regulatory,
shareholder and third-party approvals to allow the Company to lawfully complete the
Acquisition;
•
Capital raising: the Company completing the Placement (as defined below); and
•
No warranty breach: there being no material breach of any warranties given by the
vendor in relation to the Acquisition, before settlement of the Acquisition.
The binding agreement otherwise contains terms and conditions considered standard for
agreements of this nature (further details in respect of which will be set out in the Notice of
General Meeting).
ASX has also determined that there is no requirement for the Company to seek its
shareholders' approval under Listing Rule 11.1.2 for, nor to re-comply with ASX's admission
tests prior to, the Acquisition detailed above.
Share Placement
DY6 Resources has received firm commitments from new and existing significant
shareholders in a well-supported placement to raise $400,000 through the issue of 10,000,000
shares at $0.04 per share, including participation by Director, Daniel Smith (subject to
Shareholder approval) of $75,000 (Placement).
Funds raised under the Placement will be used towards the cost of the Acquisition, advance
exploration and developmental activities at Central and Douala, and for general working
capital purposes. The Placement is made without shareholder approval using DY6’s existing
capacity under Listing Rules 7.1 & 7.1A. The participation by Directors is subject to approval
by DY6 shareholders, which will be sought at the forthcoming EGM.
Impact on Capital structure
The Company’s capital structure following the transaction will be as follows:
Shares
Performance
Rights
Options
Existing Securities
58,500,000
2,000,000
38,249,978
Acquisition of 100% of Central and
Douala1
5,000,000
15,000,000
-
-
8,000,000
-
10,000,000
-
-
Director Performance Rights2
Placement3
dy6metals.com | ASX:DY6
7
73,500,000
TOTAL
25,000,000
38,249,978
1&2 These securities are subject to Shareholder approval.
3 Of this amount, 1,875,000 shares are subject to Shareholder approval.
Appendices 3B for the securities referred to in this announcement accompany this
announcement.
Director Performance Rights
Subject to Shareholder approval, DY6 intends to issue the following Performance Rights to
the Company’s directors in recognition of securing the acquisition and to create an incentive
for future performance:
Total
Tranche 1
Tranche 2
Tranche 3
Tranche 4
Daniel Smith
5,000,000
1,250,000
1,250,000
1,250,000
1,250,000
John Kay
1,000,000
250,000
250,000
250,000
250,000
Myles Campion
1,000,000
250,000
250,000
250,000
250,000
Nannan He
1,000,000
250,000
250,000
250,000
250,000
TOTAL
8,000,000
2,000,000
2,000,000
2,000,000
2,000,000
Director
The Performance Rights will vest upon satisfaction of the following milestones:
(a)
Tranche 1 Performance Rights: shall vest upon the Company achieving a market
capitalisation (on an undiluted basis) of no less than $12,500,000 for 10-consecutive
trading days;
(b)
Tranche 2 Performance Rights: shall vest upon the Company achieving a market
capitalisation (on an undiluted basis) of no less than $20,000,000 for 10-consecutive
trading days;
(c)
Tranche 3 Performance Rights: shall vest upon the Company achieving a market
capitalisation (on an undiluted basis) of no less than $30,000,000 for 10-consecutive
trading days; and
(d)
Tranche 4 Performance Rights: shall vest upon the Company achieving a market
capitalisation (on an undiluted basis) of no less than $40,000,000 for 10-consecutive
trading days.
Each expiring 3 years from date of issue.
An appendix 3B for the proposed issue accompanies this announcement.
-ENDSThis announcement has been authorised by the Board of DY6.
dy6metals.com | ASX:DY6
8
More information
Mr Daniel Smith
Mr John Kay
Non-Executive Chairman
Director & Company Secretary
dan.smith@dy6metals.com
john.kay@dy6metals.com
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Douala Basin Project, is based on information compiled by Mr Richard Stockwell, a
Competent Person who is a Fellow of The Australian Institute of Geoscientists. Mr Stockwell is a
consultant to the company and has sufficient experience which is relevant to the style of mineralization
and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr Stockwell consents to the inclusion in this
announcement of the matters based on his information in the form and context in which it appears.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Appendix: Tenement Details
Tenement
Name
Mungo
Mbanga
Maleke
Diwong
Mbongo
Edea Sud
Nganda
Nsimbo
Kombo
Bounde
Alamba
Project
Name
Douala
Douala
Douala
Douala
Douala
Douala
Central
Central
Central
Central
Central
Holder
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Application
Area
Date
29/06/2022
29/06/2022
30/01/2024
30/01/2024
30/09/2022
29/06/2022
19/02/2025
19/02/2025
19/02/2025
19/02/2025
19/02/2025
483Km2
468Km2
491Km2
484Km2
214Km2
440Km2
396Km2
495Km2
460Km2
425Km2
348Km2
Granted
Date
14/12/2022
14/12/2022
N/A
N/A
N/A
14/12/2022
N/A
N/A
N/A
N/A
N/A
dy6metals.com | ASX:DY6
9
Table 1: Douala Project Collar and Sample Locations (Datum WGS Zone 32)
No
Hole ID
Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
DIB_DS00009
DIB_S00001
DIB_S00002
DIB_S00003
DIB_S00004
DIB_S00005
DIB_S00006
DIB_S00007
DIB_S00008
DIB_S00009
DIB_S00010
DIB_S00011
DIB_S00014
DIB_S00016
DIB_S00017
DIB_S00018
DIB_S00019
DIB_S00020
DIB_S00021
DIB_S00022
DIB_S00023
DIB_S00024
DIB_S00025
DIB_S00027
DIB_S00028
DIB_S00029
DIB_S00030
DIB_S00031
DIB_S00032
DIB_S00033
DIB_S00034
DIB_S00035
DIB_S00036
DIB_S00037
DIB_S00038
DIB_S00039
DIB_S00040
DIB_S00041
DIB_S00042
DIB_S00043
DIB_S00044
DIB_S00045
DIB_S00046
DIB_S00047
DIB_S00048
DIB_S00049
DIB_S00050
DIB_S00051
DIB_S00052
DIB_S00053
DIZ_S00001
DIZ_S00002
DIZ_S00003
DIZ_S00006
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Sonic
Garmin
East
603423
607857
611273
608537
608949
605825
605587
605153
607182
603414
604939
610350
603431
609498
605550
604357
607927
607670
609625
609311
604269
603983
603627
607729
606924
605211
605331
604067
602294
602418
603766
603194
604544
606588
607111
611170
612145
612505
613196
609633
610179
610323
610553
613823
611731
610537
610457
608359
612067
613874
605709
604200
602728
612959
Garmin
North
436201
442244
445071
433889
436003
442940
440207
434745
435554
436197
437493
437071
445227
445951
439268
433403
436172
433737
434116
435278
439777
440250
437475
438511
437949
438904
439024
438117
444313
445054
444259
443914
442907
443849
441360
442408
442960
444911
441888
442485
433458
433796
434955
435245
432046
432880
428920
429327
434611
438665
429450
430440
430954
445910
Garmin
Elevation
32
67
58
84
75
58
54
59
83
27
84
91
45
78
62
56
75
75
59
95
65
93
66
40
70
94
82
80
47
46
59
69
60
84
76
77
57
95
109
86
49
86
109
117
95
69
99
89
103
101
52
51
35
79
Total
Depth
18
18
18
18
18
18
18
18
18
12,5
18
24
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
Total
Samples
9
10
9
11
10
8
9
10
10
9
10
10
10
11
9
10
13
10
10
9
9
10
10
13
10
9
11
11
8
10
10
10
9
8
10
9
9
10
8
11
11
10
9
8
9
10
9
10
9
9
11
9
8
9
Permit
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
dy6metals.com | ASX:DY6
10
No
Hole ID
55
56
57
58
59
60
YAB_S00001
YAB_S00002
YAB_S00003
YAB_S00004
YAB_S00005
YAB_S00006
Garmin
East
Sonic
597987
Sonic
600092
Sonic
602303
Sonic
602143
Sonic
604915
Sonic
613641
Totals
Type
Garmin
North
457083
458422
456485
461575
459381
461900
Garmin
Elevation
63
92
73
69
45
50
Total
Depth
18
18
18
18
18
18
1,080.5
Total
Samples
9
9
8
13
9
11
582
Permit
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Table 2: Douala Project Hand Auger Collar and Sample Locations (Datum WGS
Zone 32)
No
Hole ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
DIB_T00001
DIB_T00002
DIB_T00003
DIB_T00004
DIB_T00005
DIB_T00006
DIB_T00007
DIB_T00008
DIB_T00009
DIB_T00010
DIB_T00011
DIB_T00012
DIB_T00013
DIB_T00014
DIB_T00015
DIB_T00016
DIB_T00017
DIB_T00018
DIB_T00019
DIB_T00020
DIB_T00021
DIB_T00022
DIB_T00023
DIB_T00024
DIB_T00025
DIB_T00026
DIB_T00027
DIB_T00028
DIB_T00029
DIB_T00030
DIB_T00031
DIB_T00032
DIB_T00033
DIB_T00034
DIB_T00035
DIB_T00036
DIB_T00037
DIB_T00038
DIB_T00039
Garmin
East
Hand Auger
603620
Hand Auger
604111
Hand Auger
604107
Hand Auger
604604
Hand Auger
605598
Hand Auger
605601
Hand Auger
604126
Hand Auger
603630
Hand Auger
604129
Hand Auger
604628
Hand Auger
604121
Hand Auger
604619
Hand Auger
606614
Hand Auger
606117
Hand Auger
606113
Hand Auger
605117
Hand Auger
607600
Hand Auger
605591
Hand Auger
607727
Hand Auger
607102
Hand Auger
607107
Hand Auger
607114
Hand Auger
605620
Hand Auger
607598
Hand Auger
605138
Hand Auger
605630
Hand Auger
604668
Hand Auger
603656
Hand Auger
608624
Hand Auger
604699
Hand Auger
605675
Hand Auger
608679
Hand Auger
608658
Hand Auger
610676
Hand Auger
610668
Hand Auger
609661
Hand Auger
611587
Hand Auger
607628
Hand Auger
610155
Totals
Type
Garmin
North
437878
438361
439377
439379
439884
439386
436886
436383
436387
436893
437384
437384
436905
436901
437398
437392
438406
440881
438509
438402
437903
436907
436897
438903
434402
435303
433881
432897
435906
427915
428927
427944
429944
427959
429953
428955
436932
436910
433443
Garmin
Elevation
70
84
88
28
48
71
70
53
58
71
57
72
70
55
62
82
64
28
40
53
69
67
69
55
70
78
59
48
56
30
52
47
59
69
68
44
72
71
40
Total
Depth
7,25
7,30
7,25
1,78
3,15
7,25
7,25
7,25
7,25
7,25
7,25
6,20
6,05
2,20
3,15
3,85
7,25
3,65
3,30
5,12
1,90
6,20
4,65
7,25
7,25
6,25
2,3
0,7
3,9
0,15
2,2
5,6
7,25
2,65
5,25
4,05
1
6,6
4,5
190.65
Total
Samples
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
39
Permit
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
Diwong
dy6metals.com | ASX:DY6
11
Table 3: Douala Project -Sample Results
Hole ID
Sample ID
From
To
>1mm
%
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_DS00009
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00001
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00002
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00003
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00004
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00005
DIB_S00006
DIB_S00006
DIB_S00006
DIB_S00006
MISS00020
MISS00021
MISS00022
MISS00023
MISS00024
MISS00027
MISS00028
MISS00029
MISS00333
MISS00334
MISS00335
MISS00336
MISS00337
MISS00338
MISS00339
MISS00340
MISS00341
MISS00342
MISS00395
MISS00396
MISS00397
MISS00398
MISS00399
MISS00402
MISS00403
MISS00404
MISS00405
MISS00117
MISS00118
MISS00119
MISS00120
MISS00121
MISS00122
MISS00123
MISS00124
MISS00127
MISS00128
MISS00129
MISS00149
MISS00152
MISS00153
MISS00154
MISS00155
MISS00156
MISS00157
MISS00158
MISS00159
MISS00160
MISS00343
MISS00344
MISS00345
MISS00346
MISS00347
MISS00348
MISS00349
MISS00352
MISS00040
MISS00041
MISS00042
MISS00043
0
1,5
3
4,5
7,8
9
10,5
13,5
0
1,5
3
6
8
9
10
12
14
16
0
2
5
7
9
10,5
12
14
16,5
0
2
4
6,1
7,7
9,2
12
13,5
15,5
16,3
17,5
0
3
4,5
7,5
9
10,2
11,1
12
14,5
15,1
0
3
5
7
9
11
13
15
0
2
4
6
1,5
3
4,5
7,8
9
10,5
13,5
18
1,5
3
6
8
9
10
12
14
16
18
2
5
7
9
10,5
12
14
16,5
18
2
4
6,1
7,7
9,2
12
13,5
15,5
16,3
17,5
18
3
4,5
7,5
9
10,2
11,1
12
14,5
15,1
18
3
5
7
9
11
13
15
18
2
4
6
8
12,21%
11,27%
7,44%
0,44%
2,85%
8,45%
15,86%
22,70%
28,05%
36,88%
6,12%
16,52%
4,32%
7,01%
10,94%
18,75%
33,76%
24,68%
20,57%
35,48%
39,84%
33,62%
18,96%
20,72%
32,49%
30,99%
36,68%
9,10%
25,47%
50,51%
21,23%
7,63%
5,13%
1,07%
5,96%
7,25%
0,11%
4,92%
42,30%
10,63%
14,83%
0,32%
27,16%
7,48%
7,96%
0,29%
5,43%
3,45%
11,23%
12,55%
14,09%
21,91%
29,86%
19,29%
23,34%
24,52%
6,56%
6,63%
8,55%
7,11%
<1mm
>45µm
(%)
79,13%
79,10%
44,09%
20,48%
83,64%
85,94%
74,25%
69,41%
42,86%
34,34%
45,71%
58,39%
38,63%
67,19%
66,80%
57,03%
52,93%
60,84%
48,23%
37,69%
38,64%
45,35%
56,70%
64,57%
50,92%
57,18%
49,16%
53,40%
43,12%
28,62%
54,89%
71,02%
35,52%
65,30%
70,66%
72,40%
23,19%
69,14%
19,95%
31,51%
69,83%
76,86%
59,79%
80,53%
81,02%
68,95%
80,27%
84,91%
61,82%
56,42%
54,20%
47,52%
45,90%
65,47%
60,26%
60,90%
69,30%
62,97%
60,78%
63,85%
<45µm
(%)
THM
%
Mag %
Non
Mag %
8,66%
9,62%
48,47%
79,08%
13,51%
5,61%
9,89%
7,90%
29,09%
28,78%
48,17%
25,08%
57,05%
25,80%
22,26%
24,22%
13,31%
14,49%
31,20%
26,83%
21,52%
21,04%
24,34%
14,71%
16,60%
11,84%
14,16%
37,50%
31,41%
20,87%
23,88%
21,35%
59,35%
33,63%
23,38%
20,35%
76,70%
25,94%
37,75%
57,86%
15,34%
22,82%
13,05%
11,99%
11,03%
30,76%
14,30%
11,64%
26,95%
31,02%
31,71%
30,58%
24,24%
15,25%
16,40%
14,58%
24,14%
30,40%
30,66%
29,03%
3,42%
2,77%
2,09%
0,54%
1,53%
2,37%
2,29%
1,37%
1,84%
1,55%
6,26%
2,54%
2,22%
3,33%
0,71%
1,30%
1,55%
1,15%
0,92%
2,95%
1,56%
2,34%
2,08%
4,78%
3,36%
4,23%
2,92%
3,38%
1,87%
2,09%
1,87%
1,87%
1,77%
7,11%
5,95%
44,85%
23,98%
10,82%
9,79%
8,63%
8,90%
10,88%
79,03%
27,03%
21,17%
66,20%
15,98%
16,37%
26,56%
25,09%
13,88%
67,79%
28,42%
7,95%
8,06%
7,98%
7,77%
92,89%
94,05%
55,15%
0,00%
76,02%
89,18%
90,21%
91,37%
91,10%
89,12%
20,97%
72,97%
78,83%
33,80%
84,02%
83,63%
73,44%
74,91%
86,12%
32,21%
71,58%
92,05%
91,94%
92,02%
92,23%
In-situ
Rutile
%
0,58%
0,49%
0,24%
0,00%
0,33%
0,26%
0,30%
0,11%
0,32%
0,27%
0,12%
0,21%
0,28%
0,11%
0,16%
0,21%
0,26%
0,33%
0,33%
0,18%
0,32%
0,38%
0,35%
0,38%
0,34%
In-situ
Zircon
%
0,10%
0,09%
0,05%
0,00%
0,06%
0,03%
0,04%
0,01%
0,06%
0,05%
0,02%
0,04%
0,05%
0,02%
0,02%
0,04%
0,04%
0,06%
0,06%
0,02%
0,04%
0,06%
0,06%
0,06%
0,05%
dy6metals.com | ASX:DY6
12
Hole ID
Sample ID
From
To
>1mm
%
DIB_S00006
DIB_S00006
DIB_S00006
DIB_S00006
DIB_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIZ_S00006
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00007
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00008
DIB_S00009
DIB_S00009
DIB_S00009
DIB_S00009
DIB_S00009
DIB_S00009
DIB_S00009
DIB_S00009
Share your feedback
Discover