Highlights
Cameroon Portfolio — Central Rutile Project and Yaoundé West
• HMS laboratory commissioned in Yaoundé: Tusker's purpose-built Heavy Mineral Sands laboratory is
now fully operational, establishing in-country mineral separation and analytical capability. The laboratory
enables estimation of recovered rutile concentration within the heavy mineral fraction, representing a
critical advancement over conventional total HM reporting, while materially reducing assay turnaround
times and exploration costs.
• Integrated sample processing now underway: All soil and hand-auger drill samples generated across
Tusker’s Cameroon portfolio will now be processed through the newly commissioned Yaoundé HMS
laboratory, enabling rapid sample preparation, heavy mineral separation, magnetic separation and
accelerated assay turnaround to support faster exploration targeting and decision-making.
• Hand-auger drilling advancing at Bounde and Nganda: Drilling continues across the licences,
targeting planned depths of 12–16m and systematically testing the historically mapped 70 × 15km BRGM
high-grade residual rutile corridor for the first time using modern exploration techniques.
• Systematic soil sampling commenced at Yaoundé West: Geochemical sampling is underway across
the Yaoundé West licence package to generate priority drill targets and advance regional-scale
exploration targeting.
• Desktop targeting commenced at Douala Basin HMS: Remote sensing and desktop targeting studies
are underway to identify priority targets ahead of planned Q3 auger drilling.
Malawi Portfolio — New Mzimba Rutile Discovery
• New high-grade rutile discovery at Mzimba, northern Malawi: Initial reconnaissance sampling across
approximately 50km² (~7% of the 710.5km² licence package) returned a peak assay of 1.88% TiO₂, with
47% of soil samples exceeding 1% TiO₂, highlighting strong near-surface titanium enrichment and the
potential for a significant residual rutile system
• XRD confirms high-purity rutile mineralisation: Mineralogical analysis confirmed titanium is hosted
predominantly as rutile with minor anatase; no ilmenite was detected, confirming high-purity TiO₂
mineralisation across analysed samples.
• Geological setting analogous to Sovereign Metals' Kasiya deposit: The Mzimba licences are
underlain by high-grade metamorphic rocks of the Irumide Belt, comparable to the bedrock geology
hosting Kasiya - the world's largest primary rutile deposit, 200km to the south.
• Significant exploration upside: With only 7% of the licence area tested, follow-up sampling, auger
drilling, geophysical interpretation, and preliminary metallurgical testwork have been planned to
systematically evaluate the remaining 710km² package
Corporate
• Senior management engagement with capital markets: Senior management attended Mining Indaba
2026 and 121 Mining Investment Cape Town in February 2026, engaging with institutional and
professional investors regarding the Company's 2026 strategy and operational progress across
Cameroon and Malawi.
• Quarter-end cash position: ~A$1.35 million.
• Proposed divestment of Tundulu REE Project announced: Subsequent to the quarter-end, the
Company announced the proposed sale of its 100% interest in the Tundulu REE Project in Malawi to
AuKing Mining Limited for total consideration of up to A$5.55 million, comprising staged cash and
equity consideration. The proposed transaction is expected to provide non-dilutive funding while
sharpening
• Tusker’s strategic focus on advancing its rutile and heavy mineral sands portfolio.
• Engage with this announcement at the Tusker Minerals Investor Hub.
Tusker Minerals Ltd (ASX: TSK, ‘Tusker’ or ‘Company’) has released its Quarterly Update for the period ended
31 March 2026, providing an overview of activities completed during the quarter and post quarter end.
Chief Executive Officer, Cliff Fitzhenry, commented:
“This quarter marks an important step forward in Tusker’s transformation into a focused titanium and
heavy mineral sands exploration company with exposure to multiple emerging rutile districts in Africa.
In Cameroon, commissioning of our purpose-built HMS laboratory in Yaoundé is a genuine game-
changer for the business. Establishing in-country mineral separation and analytical capability materially
accelerates our exploration workflow, reduces costs, and importantly allows us to quantify recovered
rutile concentration within the heavy mineral fraction—providing a far clearer measure of project quality
as we advance drilling across the historically mapped Bounde–Nganda rutile corridor.
At the same time, our early success at Mzimba in northern Malawi has highlighted the potential for a
significant new rutile district, with high-grade near-surface titanium mineralisation confirmed as
predominantly rutile. The geological similarities to major rutile systems elsewhere in Malawi provide
strong encouragement as we systematically advance this new discovery.
Importantly, the proposed divestment of Tundulu provides non-dilutive capital and sharpens our
strategic focus on what we believe is a compelling opportunity to build a leading African rutile and
titanium exploration platform. With active drilling, accelerated in-country assay capability, and multiple
large-scale exploration targets emerging across our portfolio, Tusker is entering an exciting new phase
of growth.”
Operational Overview
Cameroon Portfolio
Central Rutile Project and Douala Basin HMS Project
Field programmes accelerated across Tusker’s Cameroon exploration portfolio during the March 2026
quarter, with concurrent activities advancing across the Central Rutile Project, Yaoundé West licence
package, and the Douala Basin HMS Project.
At Bounde and Nganda, hand-auger drilling continued to systematically test the historically defined 70
× 15 km BRGM-mapped high-grade residual rutile corridor—the first modern, methodical drill
evaluation of this highly prospective mineralised trend.
The majority of the holes completed during the quarter reached planned depths of 12–16 metres,
successfully penetrating the target weathered profile and generating samples for detailed heavy mineral
separation and recovered rutile analysis through Tusker’s newly commissioned Yaoundé HMS
laboratory.
Figure 1: Geological map showing the hand-auger drill program currently in progress at the Bounde
and Nganda licences targeting the historic BRGM mapped residual rutile corridor. (ASX
Announcement, 10 February 2026)
Yaoundé West — Systematic Soil Sampling Commenced
A systematic soil sampling campaign commenced across the Yaoundé West licence package during
the quarter, marking the first phase of regional-scale geochemical targeting across this prospective
project area.
The program is designed to establish a robust geochemical dataset for the project area, with samples
to be processed within Tusker's Yaoundé laboratory. Results will be used to identify anomalous Rutile
and REE target zones for focused follow-up hand-auger drilling.
Figure 2: Map showing the planned systematic soil sampling campaign underway across the
Yaoundé West licences. (ASX Announcement 10 March 2026.)
Heavy Mineral Sands Laboratory — Commissioned and Operational
A significant operational milestone was achieved during the quarter with the successful commissioning
of Tusker's purpose-built Heavy Mineral Sands ("HMS") laboratory in Yaoundé, Cameroon, announced
on 10 March 2026. The laboratory is now fully operational and will process all soil, auger, and future
drill samples generated across the Company's Cameroon exploration portfolio.
The facility has been configured using industry-standard mineral separation techniques and operates a
four-stage workflow: sample preparation and sizing (oven drying, weighing, screening); gravity
separation via a Gemini shaking table to produce a heavy mineral concentrate (HMC); staged magnetic
separation to discriminate magnetic fractions (ilmenite, magnetite) from non-magnetic fractions (rutile,
zircon, monazite); and pXRF analysis of both fractions to determine TiO₂ concentrations, trace element
signatures, and indicative REE responses.
Critically, the laboratory enables Tusker to directly estimate recovered rutile concentrations within the
heavy mineral fraction — the primary economic driver in mineral sands systems — rather than relying
solely on total heavy mineral (HM) percentages. This represents a meaningful step-change in the
Company's exploration capability, reducing dependence on external assay providers, improving cost
control, and materially accelerating exploration turnaround times.
Figure 3: Tusker lab technicians processing exploration samples over the shaking table at the
Yaoundé HMS laboratory. (ASX Announcement, 10 March 2026.)
Figure 4: Map of Cameroon showing Tusker Minerals' Central Rutile Project (green) and Douala
Basin Project (blue), encompassing +11,000 km² of highly prospective tenure. (ASX Announcement,
10 March 2026.)
Douala Basin HMS Project — Desktop Target Generation
Desktop remote sensing and target generation studies commenced at the Douala Basin HMS Project
during the quarter, focused on identifying prospective geomorphological and palaeo-shoreline features
associated with heavy mineral sands accumulation.
This work is designed to define priority exploration corridors and drill-ready targets ahead of planned
hand-auger drilling in Q3 2026.
Malawi Portfolio
Mzimba Project — New High-Grade Residual Rutile Discovery
A significant new discovery was announced on 12 March 2026 with the identification of high-grade
near-surface titanium mineralisation across Tusker’s Mzimba exploration licences in northern
Malawi. Subsequent mineralogical analysis confirmed the titanium mineralisation is hosted
predominantly as rutile, with negligible ilmenite, highlighting the potential for a high-value residual
rutile system. These results were derived from initial reconnaissance soil and rock-chip sampling,
supported by XRF geochemical analysis and XRD mineralogical testing. Initial reconnaissance
sampling returned encouraging titanium results across 41 samples, with 27% (11/41) of all soil and
rock-chip samples assaying above 1% TiO₂ with a peak assay of 1.88%. When considering soil samples
only, 47% (8/17) exceeded 1% TiO₂, with a peak assay of 1.7% TiO₂. Selected high-grade results are
presented in Table 1 below.
XRD mineralogical analysis of nine selected samples confirmed the titanium is hosted predominantly
as rutile — the highest-value naturally occurring form of titanium dioxide — with minor anatase also
present. Importantly, no ilmenite was detected in any of the analysed samples, indicating the titanium
mineralisation is largely composed of high-purity TiO₂ minerals dominated by rutile and anatase.
These results are particularly significant given that the reconnaissance programme covered only
approximately 50 km², representing approximately 7% of the 710.5km² licence package across three
tenements: Mzimba West (EL0784), Mzimba Central (EL0732), and Mzimba South (EL0783).
Figure 5: Map showing XRF rutile % values of reconnaissance soil and rock-chip samples across the
Mzimba licences. (ASX Announcement, 12 March 2026.)
Figure 6: Exposure of the weathering profile showing the contact between ferruginous pedolith and
underlying mottled clay at Mzimba. (ASX Announcement, 12 March 2026.)
Figure 7: Planned follow-up soil sampling programme across the Mzimba licence area. (ASX
Announcement, 12 March 2026.)
The Mzimba licences are situated within the Mesoproterozoic Irumide Belt, underlain by high-grade
metamorphic rocks including orthogneiss, paragneiss, mica schists, schist and granulite.
This geological setting is comparable to the metamorphic protoliths that host Sovereign Metals' Kasiya
deposit, located approximately 200km to the south and recognised as the world's largest primary rutile
deposit. Prolonged tropical weathering across the region has resulted in deep saprolite profiles within
which resistant heavy minerals such as rutile may become residually enriched.
The Company mobilised its Malawian exploration team immediately following the announcement to
commence an expanded follow-up programme. Planned next-phase activities include additional wide-
spaced and infill soil sampling to expand and refine the geochemical footprint; auger drilling to test the
depth, distribution and continuity of rutile mineralisation; review and interpretation of available
geophysical datasets including magnetic and radiometric surveys; and preliminary metallurgical
testwork to assess rutile liberation and recovery characteristics.
The Mzimba results complement ongoing exploration at the Company's flagship Central Rutile Project
in Cameroon and together form an emerging pipeline of prospective rutile exploration assets across
Africa.
Corporate
During the March 2026 quarter, senior Board and management representatives attended key investor
and industry events in Cape Town in February 2026. Chief Executive Officer Mr Cliff Fitzhenry and
Executive Chairman Mr Dan Smith attended Mining Indaba 2026 (9–12 February 2026), meeting with
investors, industry participants and stakeholders to discuss the Company's 2026 strategy and
operational progress in Cameroon and Malawi. Both also attended 121 Mining Investment Cape Town,
conducting targeted meetings with institutional and professional investors. An updated corporate
investor presentation was released to the market in conjunction with these engagements.
The licensing process for the Company's Cameroon tenements continued to progress during the
quarter, with applications remaining under review by the inter-Ministerial technical committee. The
Company also continued to advance its in-country operational presence in Cameroon, further
developing its Cameroonian workforce and successfully commissioning the Yaoundé HMS laboratory.
During the quarter, a total of 2,000,000 shares were released from voluntary escrow.
Post the reporting period, the Company announced the proposed sale of 100% of its Tundulu REE
project in Malawi to AuKing Mining Limited for a total consideration value of up to $5.55 million,
comprising staged cash and equity. The non-dilutive consideration will help strengthen Tusker’s
balance sheet and extend the Company’s funding runway through 2026. This allows Tusker to
accelerate exploration and development activities across its core projects while maintaining a
disciplined capital structure. The transaction is conditional on certain conditions precedent being met
by the parties. Further details are set out in the Company’s ASX announcement dated 17 April 2026.
In addition, post the reporting period, the Company announced a non-renounceable pro-rata bonus
issue of Loyalty Options to eligible shareholders, on the basis of one (1) quoted Loyalty Option for every
seven (7) Shares held on the record date. Each Loyalty Option will be quoted, issued at a nil issue
price, exercisable at $0.15, and will expire three (3) years from the date of issue.
Tenement Schedule
This section is provided in compliance with ASX Listing Rule 5.3. Please refer to Annexure 1 for a
complete list of tenements currently held by the Company.
During the quarter, there were no addition tenements acquired by the Company across its Malawi or
Cameroon portfolio, nor any tenements disposed of.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, the Company reports that exploration expenditure incurred during
the March 2026 quarter was A$683,000. There were no mining production and development activities
during the quarter.
Cash Position
Cash at the end of the quarter: ~A$1.35 million.
Note 6 of Appendix 5B
Payments to related parties of the entity and their associates: during the March 2026 quarter A$157,833
was paid to directors and associates for director, consulting, company secretarial and accounting fees.
-ENDS-
This announcement has been authorised by the Board of Tusker Minerals.
More information
Mr Daniel Smith Mr Cliff Fitzhenry Jessica Fertig
Executive Chairman Chief Executive Officer Media and Investor Relations
dan@Tuskerminerals.com cliff@Tuskerminerals.com jessica@taumedia.com.au
About Tusker Minerals
Tusker Minerals is an African-focused explorer advancing a world-class portfolio of critical mineral assets across
Cameroon & Malawi. Tusker’ projects include the Central Rutile Project and Douala Basin HMS Project in
Cameroon and the Mzimba, Machinga, and Salambidwe Projects in Malawi.
Competent Person Statement
The exploration results contained in this report were reported by the Company in its ASX announcements made
on 9 February 2026, 10 March 2026 and 12 March 2026 that contained a Competent Person Statement.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the above original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking statements, opinions
and estimates are only predictions and are subject to risks, uncertainties and assumptions which are outside the
control of Tusker Minerals. Past performance is not necessarily a guide to future performance and no
representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking
statements, opinions or estimates. Actual values, results or events may be materially different to those expressed
or implied in this announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements, opinions or
estimates. Any forward-looking statements, opinions or estimates in this announcement speak only at the date of
issue of this announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules,
Tusker Minerals does not undertake any obligation to update or revise any information or any of the forward-
looking statements, opinions or estimates in this announcement or any changes in events, conditions or
circumstances on which any such disclosures are based.
Annexure 1 – Tenements
In accordance with Listing Rule 5.3.3, TSK advises the details of the tenements currently held by the Company
or its subsidiaries as at 31 March 2026.
Cameroon:
Project/Tenement Name
Tenement
Details
Status
Acquired
during
quarter
Disposed
of during
quarter
Held at
end of
quarter
Douala Mungo Granted - - 100%
Douala Mbanga Granted - - 100%
Douala Maleke Application - - 100%
Douala Diwong Application - - 100%
Douala Mbongo Application - - 100%
Douala Edea Sud Granted - - 100%
Douala Nganda Application - - 100%
Central Nsimbo Application - - 100%
Central Kombo Application - - 100%
Central Bounde Application - - 100%
Central Alamba Application - - 100%
Central Biyan Application - - 100%
Central Nlong Application - - 100%
Central Awae Application - - 100%
Central Ayene II Application - - 100%
Central Assi Application - - 100%
Central Bissoua _II Application - - 100%
Central Soleye Application - - 100%
Central Soleye_W Application - - 100%
Central Ayene Application - - 100%
Central Matomb Application - - 100%
Central Makak Application - - 100%
Central Mapan Application - - 100%
Central Lobo Application - - 100%
Central Lipombe Application - - 100%
Central Dibang Application - - 100%
Central Ekoundindi Application - - 100%
Malawi:
Project/Tenement Name
Tenement
Details
Status
Acquired
during
quarter
Disposed
of during
quarter
Held at
end of
quarter
Machinga (Main) EPL0529 Granted - - 100%
Machinga (Extended Area) EPL0705 Granted - - 100%
Salambidwe EPL0518 Granted - - 100%
Ngala Hill EPL0510 Granted - - 100%
Tundulu EL0731 Granted - - 100%
Mzimba (West) EL0784 Granted - - 100%
Mzimba (Central) EL0732 Granted - - 100%
Mzimba (South) EL0783 Granted - - 100%
Karonga EL0782/24 Granted - - 100%
Share your feedback
Discover