Soil Sampling Campaign Commences at Central Project
Released
Released
Announcement PDF
ASX Announcement
ASX:DY6
11 July 2025
Systematic Soil Sampling Campaign Commences at
the Central Rutile Project
HIGHLIGHTS
▪
Central Rutile Project now advances to next phase with a systematic soil sampling
campaign covering the full 4,974km2 project landholding commencing
▪
Sampling planned on a 5km line spacing and 1km sample spacing plan across the
regional geological trend
▪
Soil sampling campaign is designed to delineate areas of higher Rutile % grades,
providing grassroots data to enable a focused maiden drilling campaign thereafter
▪
Soils campaign will run concurrently with the hand auger drill campaign planned for
the northern portion of the Nsimbo and Alamba licences1
DY6 Metals Ltd (ASX: DY6, “DY6” or “Company”) is pleased to announce that it has
commenced a systematic soil sampling campaign over its Central Rutile Project in Cameroon.
The planned 976 sample campaign will be carried out on a 5km line spacing with 1km sample
spacing and with lines orientated across the geological trend of the area. The programme will
provide full coverage of the entire 4,974km2 project area and will delineate areas of higher
rutile % grades.
Technical consultant, Cliff Fitzhenry, commented: “The commencement of the systematic soil
sampling campaign is an important step for the company as we move the Central Rutile
Project forward to the next phase. The clear objective of this programme is to rapidly cover
the entire project area and to clearly delineate areas of higher rutile % grades. This will allow
us to plan a focused maiden drill programme for soon thereafter. This soils campaign will be
carried out concurrently with the 24-hole quick-fire hand auger drill programme planned for
the northern portion of our Nsimbo and Alamba licences1.”
1
Refer DY6 Metals ASX Announcement dated 10 July 2025 “Reconnaissance Programme Extended at the Central Rutile Project”
Registered Office
Level 8, 99 St Georges Terrace
Perth WA 6000
P: +61 8 9486 4036
E: info@dy6metals.com
dy6metals.com | ASX:DY6
1
Figure 1: Regional geological map of Central Cameroon showing DY6’s Central Rutile Project and the
planned hand auger reconnaissance programme on the northern portion of the Nsimbo and Alambo
permits.
Figure 2: Systematic soil sampling campaign planned for the Nganda and Bounde licences west of
Yaounde.
dy6metals.com | ASX:DY6
2
Figure 3: Systematic soil sampling campaign, as well as the 24-hole reconnaissance hand auger drill
programme, planned for the Kombo, Alamba and Nsimbo licences.
Figure 4: Systematic soil sampling campaign planned for the recently acquired “Weaver” package of
licences.
dy6metals.com | ASX:DY6
3
Background on the Project
Central Rutile Project
The Central Rutile Project consists of 11 exploration permits (Nganda, Bounde, Kombo,
Alamba, Nsimbo, Awae, Ayene II, Assi, Bissoua 2, Soleye and Soleye West) under valid
applications covering 4,974km2 across an area rapidly emerging as a globally significant rutile
province within Central Cameroon. This includes the acquisition of the Weaver Project (6
licences totaling 2,850km2) as announced on 8 July 2025 (“DY6 significantly expands size of
the Central Rutile Project”).
The project area is predominantly underlain by kyanite-bearing mica schist bedrock, which is
considered the primary source of rutile. During in-situ weathering, rutile is liberated from the
bedrock and progressively concentrated and upgraded within the overlying saprolite layer.
This forms an in-situ, eluvial saprolite hosted rutile deposit target type deposit analogous to
Sovereign Metal’s Tier 1 Kasiya deposit in Malawi (the world’s largest primary rutile deposit at
1.8 billion tons at 1.0% rutile).
The exploration model further proposes that subsequent erosion and fluvial transport rework
these materials, concentrating rutile and other valuable heavy minerals into alluvial deposits.
Historical production figures from the area between 1935 and 1955 have recorded some
15,000 tons of high purity (>95 %) rutile being produced from artisanal mining of the alluvial
deposits around Nanga-Eboko. The Central Rutile Project borders Peak Mineral’s Minta Rutile
Project where initial sampling has revealed widespread, high-value mineral assemblages with
valuable heavy minerals (VHM) up to 93% of total heavy minerals (THM) and with the
dominant VHM’s being rutile (up to 69.8%), monazite (up to 35.6%) and zircon (up to 21.5%)
(see PUA Announcement “First systematic exploration programme discovers significant rutile
province in Cameroon” dated 4 February 2025).
Figure 5: Map of Central Cameroon showing DY6’s Central Rutile Project which now encompasses
4,974km2 of prime geological terrain highly prospective for residual, natural rutile mineralisation.
dy6metals.com | ASX:DY6
4
Figure 6: Map of Cameroon which shows DY6’s full landholding including the Douala Basin Project
and the Central Rutile Project.
-ENDSThis announcement has been authorised by the Board of DY6.
More information
Mr Daniel Smith
Mr John Kay
Mr Cliff Fitzhenry
Executive Chairman
Director & Company Secretary
Technical Consultant
dan.smith@dy6metals.com
john.kay@dy6metals.com
Clifford.fitzhenry@dy6metals.com
Competent Person Statement
The information contained in this announcement that relates to geological information and exploration
results at the Central Rutile Project, is based on information compiled by Mr Clifford Fitzhenry, a
Competent Person who is a Registered Professional Natural Scientist with the Council for Natural
Scientific Professionals (SACNASP). Mr Fitzhenry is a consultant to the company and has sufficient
experience which is relevant to the style of mineralization and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Fitzhenry consents to the inclusion in this announcement of the matters based on his information in
the form and context in which it appears.
dy6metals.com | ASX:DY6
5
Forward-Looking Statements
This announcement may include forward-looking statements and opinions. Forward-looking
statements, opinions and estimates are only predictions and are subject to risks, uncertainties and
assumptions which are outside the control of DY6 Metals Ltd. Past performance is not necessarily a
guide to future performance and no representation or warranty is made as to the likelihood of
achievement or reasonableness of any forward-looking statements, opinions or estimates. Actual
values, results or events may be materially different to those expressed or implied in this
announcement.
Given these uncertainties, readers are cautioned not to place reliance on forward-looking statements,
opinions or estimates. Any forward-looking statements, opinions or estimates in this announcement
speak only at the date of issue of this announcement. Subject to any continuing obligations under
applicable law and the ASX Listing Rules, DY6 does not undertake any obligation to update or revise
any information or any of the forward-looking statements opinions or estimates in this announcement
or any changes in events, conditions or circumstances on which any such disclosures are based.
Appendix:
Table 1: Licence tenement details of the DY6’s Douala Basin HMS and Central Rutile Projects in
Cameroon.
Tenement
Name
Mungo
Mbanga
Maleke
Diwong
Mbongo
Edea Sud
Nganda
Nsimbo
Kombo
Bounde
Alamba
Awae
Ayene II
Assi
Bissoua _II
Soleye
Soleye_W
Project
Name
Douala
Douala
Douala
Douala
Douala
Douala
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Holder
Application
Area
Date
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Rhino Resources Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Gorilla Mining Ltd
Weaver Resources Ltd
Weaver Resources Ltd
Weaver Resources Ltd
Weaver Resources Ltd
Weaver Resources Ltd
Weaver Resources Ltd
29/06/2022
29/06/2022
30/01/2024
30/01/2024
30/09/2022
29/06/2022
19/02/2025
19/02/2025
19/02/2025
19/02/2025
19/02/2025
07/07/2025
07/07/2025
07/07/2025
07/07/2025
23/06/2025
23/06/2025
483km2
468km2
491km2
484km2
214km2
440km2
396km2
495km2
460km2
425km2
348km2
462km2
497km2
488km2
441km2
466km2
496km2
Granted
Date
14/12/2022
14/12/2022
N/A
N/A
N/A
14/12/2022
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
dy6metals.com | ASX:DY6
6
Share your feedback
Discover